FIELDS 55

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 193323District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$121 k
Jul 2002 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
287
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112003-04-08150623
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition117 bbl$4,894
GasProduction23,131 Mcf$115,973
Total$120,868

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5497, -100.6279. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.54972, -100.62792 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,119 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,119 ft.

Completions filed
Jul 2002
1 of 1 wells

1 well

42-4353590686,119 ftJul 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (287)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

287 months

May 2026031106.413.05$94
Apr 202603998.932.87$112
Mar 20260089.753.15$0
Feb 202603663.503.75$135
Jan 202603759.138.00$296
Dec 202501556.664.41$66
Nov 202503558.593.93$137
Oct 20250659.383.30$20
Sep 202501462.743.08$43
Aug 202501163.933.01$33
Jul 202501466.743.32$46
Jun 202501166.483.13$34
May 202502560.553.23$81
Apr 202504862.363.54$170
Mar 202503467.704.27$145
Feb 202503270.884.34$139
Jan 202506174.324.28$261
Dec 202402368.993.12$72
Nov 202403969.052.20$86
Oct 202405871.372.28$132
Sep 202403269.612.36$76
Aug 202406875.632.06$140
Jul 202407679.932.15$163
Jun 202406978.082.63$182
May 202407078.812.20$154
Apr 202405284.451.66$86
Mar 202405680.301.55$87
Feb 202406476.091.78$114
Jan 202404373.023.30$142
Dec 202303971.262.61$102
Nov 202302677.892.81$73
Oct 202301585.443.09$46
Sep 202303689.042.74$98
Aug 202304880.522.67$128
Jul 202307274.852.64$190
Jun 202306568.962.26$147
May 202315170.622.23$184
Apr 202303978.122.24$87
Mar 202305572.852.39$132
Feb 202302075.112.47$49
Jan 202305976.533.39$200
Dec 202214576.415.73$334
Nov 202205385.005.65$299
Oct 202203487.185.86$199
Sep 202204184.888.16$335
Aug 202205694.529.13$511
Jul 2022049101.587.54$370
Jun 2022040115.097.98$319
May 2022242109.378.43$573
Apr 2022050104.226.84$342
Mar 2022060108.885.08$305
Feb 202203691.054.86$175
Jan 202205381.844.54$241
Dec 202106271.323.90$242
Nov 202104777.435.24$246
Oct 202147179.795.71$725
Sep 202104469.865.35$235
Aug 202106066.024.22$253
Jul 202105970.783.98$235
Jun 202105369.493.38$179
May 202105663.483.02$169
Apr 2021153260.362.76$994
Mar 2021146961.302.72$1,046
Feb 202103657.805.55$200
Jan 202104950.412.81$138
Dec 202004544.642.68$120
Nov 202002838.772.71$76
Oct 202003636.972.48$89
Sep 202003237.091.99$64
Aug 202003539.982.39$83
Jul 202002438.371.83$44
Jun 202004234.901.69$71
May 202001216.921.81$22
Apr 2020503214.751.80$795
Mar 202013530.341.86$95
Feb 202003749.881.98$73
Jan 202003557.252.09$73
Dec 201913159.012.30$130
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190152.782.49$2
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20192056.803.06$114
Feb 20190050.852.79$0
Jan 201902046.033.23$65
Dec 20180946.594.19$38
Nov 20180052.934.24$0
Oct 20180361.443.40$10
Sep 20180159.543.11$3
Aug 20180059.403.07$0
Jul 20180165.142.93$3
Jun 201801960.183.08$58
May 201803065.382.90$87
Apr 201813963.842.90$177
Mar 201807561.222.79$209
Feb 201801461.782.77$39
Jan 201804462.874.01$176
Dec 201705957.272.92$172
Nov 201706055.423.12$187
Oct 201716249.292.98$234
Sep 201705847.523.09$179
Aug 201732245.373.00$202
Jul 20170043.873.09$0
Jun 201706742.493.09$207
May 201771645.373.26$370
Apr 201706247.933.21$199
Mar 201706846.772.98$203
Feb 201705350.452.95$156
Jan 201705349.413.42$181
Dec 201602548.763.72$93
Nov 201601242.492.64$32
Oct 201601846.193.09$56
Sep 201611641.553.10$91
Aug 201601741.442.92$50
Jul 201601741.622.92$50
Jun 201601545.352.69$40
May 201601642.521.99$32
Apr 201601536.561.99$30
Mar 201601633.011.79$29
Feb 201601126.472.06$23
Jan 201601027.352.36$24
Dec 201501732.362.00$34
Nov 201502238.792.17$48
Oct 201501243.552.43$29
Sep 201501742.992.76$47
Aug 201501140.162.87$32
Jul 201502248.152.95$65
Jun 201501656.152.88$46
May 201502055.212.96$59
Apr 201502149.822.71$57
Mar 201502542.892.93$73
Feb 201502444.662.98$71
Jan 201501843.433.10$56
Dec 201402554.693.59$90
Nov 201402570.464.25$106
Oct 201404178.303.90$160
Sep 201406786.164.05$271
Aug 201406689.394.04$266
Jul 201406496.564.18$267
Jun 201406198.164.74$289
May 201406594.734.73$307
Apr 201406295.944.81$298
Mar 201404795.895.06$238
Feb 201406597.406.19$402
Jan 201406390.404.86$306
Dec 201307491.824.35$322
Nov 201306288.853.74$232
Oct 201306497.423.78$242
Sep 2013070104.113.72$260
Aug 2013066104.253.52$232
Jul 2013067102.523.72$249
Jun 201306494.403.93$252
May 201306594.834.15$270
Apr 201306493.964.28$274
Mar 201307193.623.91$278
Feb 201307391.233.42$250
Jan 201309291.603.42$315
Dec 201208386.773.42$284
Nov 201207686.953.62$276
Oct 201208989.383.40$303
Sep 201207494.672.92$216
Aug 201206892.662.91$198
Jul 201206985.133.02$208
Jun 201206679.822.52$166
May 201206991.612.49$172
Apr 2012066101.652.00$132
Mar 2012066105.052.22$147
Feb 2012066101.102.57$170
Jan 201208098.092.73$219
Dec 201107596.873.24$243
Nov 201106395.723.31$209
Oct 201106884.983.65$248
Sep 201106483.623.99$255
Aug 201107283.404.15$299
Jul 201107094.144.52$316
Jun 201106792.904.64$311
May 201108198.134.40$357
Apr 2011061105.964.33$264
Mar 201106696.364.06$268
Feb 201105585.644.18$230
Jan 201108186.504.59$372
Dec 201009185.734.35$396
Nov 201007580.843.80$285
Oct 201006878.103.51$239
Sep 201006872.633.98$271
Aug 201007373.684.42$323
Jul 201007372.554.74$346
Jun 201007770.364.91$378
May 201007871.124.24$330
Apr 201007381.694.12$301
Mar 201007778.394.39$338
Feb 201007973.585.44$430
Jan 201008974.365.96$531
Dec 200909571.445.48$521
Nov 200909174.593.75$341
Oct 2009010472.544.11$427
Sep 200909065.543.06$276
Aug 200907867.423.22$251
Jul 200909461.133.46$326
Jun 200908866.163.90$343
May 200908054.743.93$314
Apr 200906946.773.59$248
Mar 200907942.144.06$321
Feb 200907132.814.63$329
Jan 200908035.865.37$430
Dec 200808137.105.98$484
Nov 200808355.496.86$569
Oct 200808575.246.92$588
Sep 2008061101.767.88$481
Aug 2008092114.228.48$780
Jul 20080166131.0811.39$1,891
Jun 20081160131.3313.03$2,217
May 2008089123.1711.57$1,030
Apr 2008180110.3110.45$947
Mar 2008182101.909.66$894
Feb 200808392.538.77$728
Jan 200819590.388.21$870
Dec 200719488.337.30$775
Nov 200709491.677.29$685
Oct 2007010282.856.92$706
Sep 200709575.846.24$593
Aug 200707669.066.39$485
Jul 200704070.906.39$256
Jun 200702762.007.55$204
May 2007010258.747.85$800
Apr 200705659.617.81$437
Mar 200705256.927.30$380
Feb 200705955.108.22$485
Jan 200709050.306.73$605
Dec 2006018956.656.92$1,308
Nov 2006113054.207.62$1,044
Oct 2006013454.906.01$806
Sep 2006013060.085.04$655
Aug 2006013368.717.34$976
Jul 2006113269.376.34$907
Jun 2006112666.286.38$871
May 2006015766.016.42$1,009
Apr 2006015664.397.36$1,148
Mar 2006016056.707.08$1,133
Feb 2006014457.597.75$1,116
Jan 2006015660.598.93$1,394
Dec 2005015454.9413.42$2,066
Nov 2005115054.6910.59$1,643
Oct 2005014658.3413.80$2,014
Sep 2005012061.4512.08$1,449
Aug 2005010361.519.80$1,009
Jul 2005010355.697.84$808
Jun 200509952.337.38$731
May 2005010445.226.65$692
Apr 2005011449.207.36$839
Mar 2005118150.377.15$1,345
Feb 2005019645.226.31$1,237
Jan 2005020743.166.32$1,309
Dec 2004020239.866.75$1,364
Nov 2004019345.286.33$1,222
Oct 2004016249.706.52$1,055
Sep 2004022043.245.28$1,162
Aug 2004024142.375.55$1,338
Jul 2004025938.286.08$1,576
Jun 2004025936.106.43$1,666
May 2004026037.486.49$1,689
Apr 2004018834.475.86$1,101
Mar 2004016934.365.53$935
Feb 2004016232.455.51$893
Jan 2004022932.036.30$1,443
Dec 2003012930.266.30$813
Nov 200307628.804.60$349
Oct 200309328.174.76$443
Sep 200307526.314.75$356
Aug 200303829.765.13$195
Jul 200306229.415.17$321
Jun 200304628.565.98$275
May 200305526.595.97$329
Apr 200301226.675.41$65
Mar 200306931.146.10$421
Feb 2003015033.487.93$1,189
Jan 200302430.315.58$134
Dec 2002012926.914.85$626
Nov 20020024.664.14$0
Oct 2002123226.464.23$1,008
Sep 2002145927.443.64$1,696
Aug 200211,15725.963.16$3,687
Jul 200202,70124.583.06$8,270

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   31 Mcf  × $  3.05 =        $94

────────────────────────────────────────────────────
Month total                                      $94

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/193323 is the state's own key, not one this site invented.