ALLISON 54

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 193931District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$305 k
Oct 2002 – May 2026
Value, last 12 filed months
$30
at the published price for each month
Months reported
284
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-04-20151295
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition113 bbl$4,812
GasProduction50,052 Mcf$299,897
Total$304,710

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5455, -100.6370. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.54550, -100.63696 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,218 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,218 ft.

Completions filed
Oct 2002
1 of 1 wells

1 well

42-4353602066,218 ftOct 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (284)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

284 months

May 2026010106.413.05$30
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20246076.091.78$457
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230885.443.09$25
Sep 202301189.042.74$30
Aug 202301280.522.67$32
Jul 202302374.852.64$61
Jun 202302468.962.26$54
May 202301770.622.23$38
Apr 202302178.122.24$47
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 202202287.185.86$129
Sep 20220084.888.16$0
Aug 202204594.529.13$411
Jul 20220206101.587.54$1,554
Jun 202201115.097.98$8
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 202105979.795.71$337
Sep 202108169.865.35$433
Aug 202108266.024.22$346
Jul 202109470.783.98$374
Jun 20210069.493.38$0
May 202105763.483.02$172
Apr 202105060.362.76$138
Mar 202104061.302.72$109
Feb 202109357.805.55$516
Jan 2021011250.412.81$315
Dec 202001844.642.68$48
Nov 202008338.772.71$225
Oct 202006236.972.48$154
Sep 202009537.091.99$189
Aug 202008239.982.39$196
Jul 2020010638.371.83$193
Jun 202009534.901.69$161
May 202007216.921.81$131
Apr 202009314.751.80$168
Mar 2020013330.341.86$247
Feb 202007349.881.98$145
Jan 202009457.252.09$197
Dec 201905659.012.30$129
Nov 201904055.302.75$110
Oct 201904653.472.42$111
Sep 201906055.052.66$159
Aug 201906953.112.30$159
Jul 201905656.272.46$138
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20191056.803.06$57
Feb 20190050.852.79$0
Jan 201903746.033.23$119
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 201805759.403.07$175
Jul 20180065.142.93$0
Jun 20180760.183.08$22
May 201801465.382.90$41
Apr 201803763.842.90$107
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170249.413.42$7
Dec 20160148.763.72$4
Nov 20160442.492.64$11
Oct 20160046.193.09$0
Sep 20160441.553.10$12
Aug 20160141.442.92$3
Jul 20160341.622.92$9
Jun 20160445.352.69$11
May 20160342.521.99$6
Apr 20160136.561.99$2
Mar 20160433.011.79$7
Feb 20160226.472.06$4
Jan 20160327.352.36$7
Dec 20150432.362.00$8
Nov 20150338.792.17$7
Oct 20150243.552.43$5
Sep 20150142.992.76$3
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150343.433.10$9
Dec 20140354.693.59$11
Nov 20140370.464.25$13
Oct 20140478.303.90$16
Sep 20140486.164.05$16
Aug 20140489.394.04$16
Jul 20140496.564.18$17
Jun 20140498.164.74$19
May 20140494.734.73$19
Apr 20140495.944.81$19
Mar 20140395.895.06$15
Feb 20140397.406.19$19
Jan 20140390.404.86$15
Dec 20130591.824.35$22
Nov 20130688.853.74$22
Oct 20130697.423.78$23
Sep 201307104.113.72$26
Aug 201308104.253.52$28
Jul 201308102.523.72$30
Jun 20130894.403.93$31
May 20130894.834.15$33
Apr 201301093.964.28$43
Mar 201301093.623.91$39
Feb 20130991.233.42$31
Jan 20130891.603.42$27
Dec 20120386.773.42$10
Nov 20120386.953.62$11
Oct 20120289.383.40$7
Sep 20120394.672.92$9
Aug 20120492.662.91$12
Jul 20120485.133.02$12
Jun 20120479.822.52$10
May 20120491.612.49$10
Apr 201209101.652.00$18
Mar 2012012105.052.22$27
Feb 2012011101.102.57$28
Jan 201201498.092.73$38
Dec 201101296.873.24$39
Nov 201101495.723.31$46
Oct 201101384.983.65$47
Sep 201101183.623.99$44
Aug 201101183.404.15$46
Jul 201101294.144.52$54
Jun 201101492.904.64$65
May 201101898.134.40$79
Apr 2011018105.964.33$78
Mar 201102096.364.06$81
Feb 201101785.644.18$71
Jan 201102086.504.59$92
Dec 201002185.734.35$91
Nov 201002080.843.80$76
Oct 201002378.103.51$81
Sep 201001972.633.98$76
Aug 201002073.684.42$88
Jul 201002172.554.74$99
Jun 201002470.364.91$118
May 201002671.124.24$110
Apr 201002581.694.12$103
Mar 201002778.394.39$118
Feb 201002673.585.44$142
Jan 201002774.365.96$161
Dec 200903071.445.48$165
Nov 200902974.593.75$109
Oct 200903272.544.11$132
Sep 200903165.543.06$95
Aug 200903767.423.22$119
Jul 200903761.133.46$128
Jun 200903566.163.90$136
May 200904154.743.93$161
Apr 200903446.773.59$122
Mar 200904042.144.06$162
Feb 200903732.814.63$171
Jan 200904335.865.37$231
Dec 200804437.105.98$263
Nov 200804455.496.86$302
Oct 200805275.246.92$360
Sep 2008043101.767.88$339
Aug 2008049114.228.48$416
Jul 2008063131.0811.39$718
Jun 2008160131.3313.03$913
May 2008062123.1711.57$718
Apr 2008160110.3110.45$738
Mar 2008063101.909.66$609
Feb 200805992.538.77$517
Jan 200806790.388.21$550
Dec 200716388.337.30$548
Nov 200706791.677.29$489
Oct 200705382.856.92$367
Sep 200706075.846.24$375
Aug 200718169.066.39$586
Jul 2007012670.906.39$805
Jun 2007030462.007.55$2,295
May 2007010358.747.85$808
Apr 200709859.617.81$765
Mar 2007010356.927.30$752
Feb 200709255.108.22$756
Jan 2007010250.306.73$686
Dec 2006010456.656.92$720
Nov 200609754.207.62$739
Oct 2006010254.906.01$613
Sep 200609560.085.04$479
Aug 2006010068.717.34$734
Jul 200619969.376.34$697
Jun 200606566.286.38$415
May 200609266.016.42$591
Apr 2006112864.397.36$1,007
Mar 2006032756.707.08$2,316
Feb 2006130657.597.75$2,429
Jan 2006031860.598.93$2,841
Dec 2005135054.9413.42$4,750
Nov 2005235454.6910.59$3,858
Oct 2005038658.3413.80$5,325
Sep 2005024261.4512.08$2,923
Aug 2005114461.519.80$1,472
Jul 2005014455.697.84$1,129
Jun 2005128252.337.38$2,134
May 2005143745.226.65$2,952
Apr 2005145949.207.36$3,428
Mar 2005633650.377.15$2,706
Feb 2005059145.226.31$3,730
Jan 200521,30843.166.32$8,356
Dec 200402,00739.866.75$13,549
Nov 200441,68845.286.33$10,867
Oct 200451,58849.706.52$10,594
Sep 2004112,11843.245.28$11,667
Aug 200402,21642.375.55$12,300
Jul 200441,83038.286.08$11,287
Jun 200441,58536.106.43$10,341
May 200441,48337.486.49$9,781
Apr 200491,83734.475.86$11,072
Mar 200442,31534.365.53$12,940
Feb 200421,89032.455.51$10,478
Jan 2004273932.036.30$4,719
Dec 2003140130.266.30$2,557
Nov 2003038628.804.60$1,774
Oct 2003133228.174.76$1,608
Sep 2003134826.314.75$1,679
Aug 2003150429.765.13$2,615
Jul 2003173729.415.17$3,840
Jun 2003189828.565.98$5,401
May 2003166426.595.97$3,992
Apr 2003498326.675.41$5,422
Mar 200331,76731.146.10$10,865
Feb 200371,70133.487.93$13,716
Jan 200351,95130.315.58$11,042
Dec 200252,02626.914.85$9,968
Nov 200242,37624.664.14$9,928
Oct 200201,20626.464.23$5,100

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   10 Mcf  × $  3.05 =        $30

────────────────────────────────────────────────────
Month total                                      $30

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/193931 is the state's own key, not one this site invented.