MITCHELL, TOM 1

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 195439District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$864 k
Mar 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
279
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112003-08-20152168
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition17 bbl$894
GasProduction145,068 Mcf$863,379
Total$864,274

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6666, -100.9024. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66658, -100.90239 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,600 ft.

Completions filed
Mar 2003
1 of 1 wells

1 well

42-435361793X7,600 ftMar 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (279)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

279 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20251062.363.54$62
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20214061.302.72$245
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190355.052.66$8
Aug 20190053.112.30$0
Jul 20190156.272.46$2
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190162.632.75$3
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20185052.934.24$265
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180159.403.07$3
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180365.382.90$9
Apr 201802063.842.90$58
Mar 201805261.222.79$145
Feb 201805861.782.77$160
Jan 201806362.874.01$253
Dec 201706257.272.92$181
Nov 201705955.423.12$184
Oct 201726249.292.98$284
Sep 201706147.523.09$188
Aug 201706245.373.00$186
Jul 201706243.873.09$191
Jun 201706042.493.09$185
May 201705845.373.26$189
Apr 201705447.933.21$173
Mar 201704246.772.98$125
Feb 201705750.452.95$168
Jan 201706349.413.42$215
Dec 201606348.763.72$235
Nov 201616042.492.64$201
Oct 201636546.193.09$339
Sep 201606341.553.10$195
Aug 201606341.442.92$184
Jul 20160041.622.92$0
Jun 201601345.352.69$35
May 201615742.521.99$156
Apr 201605136.561.99$102
Mar 201605433.011.79$97
Feb 201601526.472.06$31
Jan 20160127.352.36$2
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140578.303.90$20
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 201405494.734.73$255
Apr 201405895.944.81$279
Mar 201406095.895.06$303
Feb 201405797.406.19$353
Jan 201406790.404.86$326
Dec 201306991.824.35$300
Nov 201307088.853.74$262
Oct 201307797.423.78$291
Sep 2013076104.113.72$283
Aug 2013078104.253.52$275
Jul 2013074102.523.72$275
Jun 201307094.403.93$275
May 201307594.834.15$311
Apr 201307293.964.28$308
Mar 201307293.623.91$282
Feb 201307291.233.42$246
Jan 201307791.603.42$263
Dec 201208186.773.42$277
Nov 201208486.953.62$305
Oct 201208389.383.40$282
Sep 201208394.672.92$242
Aug 201208592.662.91$247
Jul 201206785.133.02$202
Jun 201208679.822.52$217
May 201208391.612.49$207
Apr 2012053101.652.00$106
Mar 2012081105.052.22$180
Feb 2012074101.102.57$190
Jan 2012011598.092.73$314
Dec 201107196.873.24$230
Nov 201108695.723.31$285
Oct 201109484.983.65$343
Sep 201109483.623.99$375
Aug 201109083.404.15$373
Jul 2011010294.144.52$461
Jun 201107392.904.64$339
May 201109398.134.40$410
Apr 20110106105.964.33$459
Mar 201108896.364.06$357
Feb 201109985.644.18$414
Jan 201109186.504.59$418
Dec 2010010785.734.35$465
Nov 2010010680.843.80$402
Oct 2010011378.103.51$397
Sep 201009772.633.98$386
Aug 2010011073.684.42$486
Jul 2010012472.554.74$587
Jun 201008770.364.91$427
May 2010012971.124.24$546
Apr 2010010581.694.12$433
Mar 2010014978.394.39$654
Feb 2010011073.585.44$599
Jan 2010010674.365.96$632
Dec 200909871.445.48$537
Nov 2009011274.593.75$420
Oct 2009013572.544.11$555
Sep 2009011965.543.06$365
Aug 2009012767.423.22$409
Jul 2009012461.133.46$430
Jun 200909066.163.90$351
May 200904754.743.93$185
Apr 200907746.773.59$276
Mar 200909542.144.06$386
Feb 200907432.814.63$343
Jan 2009010535.865.37$564
Dec 2008013837.105.98$825
Nov 2008012755.496.86$871
Oct 2008014175.246.92$976
Sep 20080134101.767.88$1,056
Aug 20080136114.228.48$1,154
Jul 20080148131.0811.39$1,686
Jun 20080157131.3313.03$2,046
May 20080168123.1711.57$1,944
Apr 20080156110.3110.45$1,631
Mar 20080176101.909.66$1,701
Feb 2008015692.538.77$1,368
Jan 2008013590.388.21$1,108
Dec 2007015588.337.30$1,132
Nov 2007012291.677.29$890
Oct 200707682.856.92$526
Sep 2007011075.846.24$687
Aug 2007010069.066.39$639
Jul 2007011170.906.39$709
Jun 200709362.007.55$702
May 2007010558.747.85$824
Apr 2007014559.617.81$1,132
Mar 2007012656.927.30$920
Feb 2007037655.108.22$3,089
Jan 2007048850.306.73$3,283
Dec 2006069056.656.92$4,774
Nov 2006072454.207.62$5,515
Oct 2006069154.906.01$4,156
Sep 2006063860.085.04$3,214
Aug 2006067368.717.34$4,940
Jul 2006063269.376.34$4,009
Jun 2006033366.286.38$2,126
May 2006060366.016.42$3,874
Apr 2006064164.397.36$4,718
Mar 2006079656.707.08$5,638
Feb 2006088057.597.75$6,821
Jan 200601,20260.598.93$10,738
Dec 200501,18654.9413.42$15,911
Nov 2005098454.6910.59$10,419
Oct 200501,28358.3413.80$17,700
Sep 200501,14161.4512.08$13,782
Aug 200501,15161.519.80$11,276
Jul 2005088155.697.84$6,910
Jun 2005088252.337.38$6,510
May 2005085245.226.65$5,667
Apr 2005073049.207.36$5,373
Mar 2005086150.377.15$6,160
Feb 2005045645.226.31$2,878
Jan 200501,42043.166.32$8,978
Dec 200401,69039.866.75$11,409
Nov 200401,90845.286.33$12,078
Oct 200401,46449.706.52$9,538
Sep 200401,64543.245.28$8,692
Aug 200402,25442.375.55$12,511
Jul 200402,36638.286.08$14,395
Jun 200403,06636.106.43$19,724
May 200403,32737.486.49$21,607
Apr 200403,02334.475.86$17,710
Mar 200403,35434.365.53$18,548
Feb 200403,59332.455.51$19,796
Jan 200403,68932.036.30$23,239
Dec 200303,35430.266.30$21,136
Nov 200305,53228.804.60$25,420
Oct 200307,24528.174.76$34,484
Sep 200307,12526.314.75$33,839
Aug 200308,64729.765.13$44,357
Jul 200309,63829.415.17$49,837
Jun 2003011,18028.565.98$66,889
May 2003013,56626.595.97$81,025
Apr 2003016,09326.675.41$87,019
Mar 20030031.146.10$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2025 — as filed, then multipliedworked
Condensate             1 bbl  × $ 62.36 =        $62
Gas                    0 Mcf  × $  3.54 =         $0

────────────────────────────────────────────────────
Month total                                      $62

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/195439 is the state's own key, not one this site invented.