SHURLEY

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 195859District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$782 k
Feb 2003 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
280
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112003-10-31152649
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5 bbl$392
GasProduction128,068 Mcf$782,089
Total$782,480

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5053, -100.6357. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.50534, -100.63573 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,301 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,301 ft.

Completions filed
Feb 2003
1 of 1 wells

1 well

42-43536145796,301 ftFeb 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (280)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

280 months

May 2026077106.413.05$235
Apr 202606698.932.87$189
Mar 202607689.753.15$239
Feb 202606963.503.75$259
Jan 202606659.138.00$528
Dec 202507656.664.41$335
Nov 202507258.593.93$283
Oct 202507759.383.30$254
Sep 202507562.743.08$231
Aug 202507563.933.01$226
Jul 202507766.743.32$255
Jun 202507666.483.13$238
May 202507760.553.23$249
Apr 202507762.363.54$273
Mar 202507767.704.27$329
Feb 202507170.884.34$308
Jan 202507874.324.28$334
Dec 202407768.993.12$240
Nov 202407769.052.20$169
Oct 202408071.372.28$183
Sep 202407569.612.36$177
Aug 202408075.632.06$165
Jul 202408079.932.15$172
Jun 202407778.082.63$203
May 202408178.812.20$178
Apr 202407684.451.66$126
Mar 202407880.301.55$121
Feb 202407576.091.78$134
Jan 202408073.023.30$264
Dec 202307871.262.61$204
Nov 202307977.892.81$222
Oct 202308185.443.09$250
Sep 202307689.042.74$208
Aug 202308280.522.67$219
Jul 202308374.852.64$219
Jun 202307968.962.26$178
May 202308470.622.23$187
Apr 202308378.122.24$186
Mar 202308472.852.39$201
Feb 202307775.112.47$190
Jan 202307476.533.39$251
Dec 202209476.415.73$539
Nov 202205185.005.65$288
Oct 202208287.185.86$481
Sep 202207884.888.16$637
Aug 202208394.529.13$758
Jul 2022084101.587.54$634
Jun 2022080115.097.98$638
May 2022086109.378.43$725
Apr 2022084104.226.84$574
Mar 2022084108.885.08$426
Feb 202207891.054.86$379
Jan 202208681.844.54$390
Dec 202108471.323.90$328
Nov 202108577.435.24$445
Oct 202108879.795.71$503
Sep 202108369.865.35$444
Aug 202109066.024.22$380
Jul 202108970.783.98$354
Jun 202108469.493.38$284
May 202109063.483.02$272
Apr 202108360.362.76$229
Mar 202108661.302.72$234
Feb 202106457.805.55$355
Jan 202108250.412.81$230
Dec 202008544.642.68$227
Nov 202008638.772.71$233
Oct 202008736.972.48$216
Sep 202008637.091.99$171
Aug 202008539.982.39$203
Jul 202008838.371.83$161
Jun 202008934.901.69$150
May 202009416.921.81$171
Apr 202008614.751.80$155
Mar 202009530.341.86$176
Feb 202008849.881.98$174
Jan 202009257.252.09$193
Dec 201909659.012.30$221
Nov 201909355.302.75$256
Oct 2019010253.472.42$247
Sep 2019010855.052.66$287
Aug 201909753.112.30$224
Jul 201909756.272.46$239
Jun 201909352.782.49$232
May 2019010158.482.74$277
Apr 201909662.632.75$264
Mar 2019010456.803.06$318
Feb 201909750.852.79$271
Jan 2019010446.033.23$336
Dec 2018010846.594.19$452
Nov 2018010452.934.24$441
Oct 2018010561.443.40$357
Sep 2018010859.543.11$336
Aug 2018011159.403.07$340
Jul 2018010965.142.93$320
Jun 2018011060.183.08$338
May 2018011565.382.90$334
Apr 2018010963.842.90$316
Mar 2018011761.222.79$326
Feb 2018010261.782.77$282
Jan 2018011962.874.01$477
Dec 2017011957.272.92$348
Nov 2017011355.423.12$352
Oct 2017012149.292.98$361
Sep 2017012047.523.09$370
Aug 2017010845.373.00$324
Jul 2017012143.873.09$374
Jun 2017012142.493.09$374
May 2017012745.373.26$414
Apr 2017012547.933.21$401
Mar 2017013746.772.98$409
Feb 2017012150.452.95$357
Jan 2017013549.413.42$462
Dec 2016014148.763.72$525
Nov 2016013242.492.64$349
Oct 2016015046.193.09$464
Sep 2016017141.553.10$530
Aug 201601441.442.92$41
Jul 201601941.622.92$56
Jun 201608545.352.69$228
May 2016013942.521.99$277
Apr 201609736.561.99$193
Mar 201609933.011.79$178
Feb 2016010226.472.06$210
Jan 2016010527.352.36$248
Dec 201507432.362.00$148
Nov 2015012038.792.17$260
Oct 2015012443.552.43$301
Sep 2015013942.992.76$383
Aug 2015014140.162.87$405
Jul 2015015048.152.95$442
Jun 2015016956.152.88$487
May 201501,50355.212.96$4,442
Apr 201501,08049.822.71$2,923
Mar 2015013742.892.93$402
Feb 2015013844.662.98$411
Jan 2015011843.433.10$366
Dec 2014013054.693.59$467
Nov 2014011270.464.25$476
Oct 2014025278.303.90$983
Sep 2014015286.164.05$615
Aug 2014015889.394.04$638
Jul 2014016096.564.18$669
Jun 2014015998.164.74$753
May 2014017294.734.73$813
Apr 2014016095.944.81$769
Mar 2014014195.895.06$713
Feb 2014017397.406.19$1,071
Jan 2014016490.404.86$797
Dec 2013017091.824.35$740
Nov 2013010388.853.74$385
Oct 2013015397.423.78$578
Sep 20130209104.113.72$777
Aug 20130231104.253.52$814
Jul 20130182102.523.72$677
Jun 2013015394.403.93$602
May 2013017694.834.15$730
Apr 2013018993.964.28$809
Mar 2013023093.623.91$900
Feb 2013024691.233.42$841
Jan 2013029091.603.42$992
Dec 2012031786.773.42$1,084
Nov 2012035986.953.62$1,301
Oct 2012048989.383.40$1,662
Sep 201201994.672.92$55
Aug 201202492.662.91$70
Jul 2012021085.133.02$634
Jun 2012029579.822.52$743
May 2012032491.612.49$806
Apr 20120317101.652.00$633
Mar 20120324105.052.22$720
Feb 20120300101.102.57$771
Jan 2012033698.092.73$919
Dec 2011032796.873.24$1,059
Nov 2011031495.723.31$1,040
Oct 2011032284.983.65$1,175
Sep 2011031383.623.99$1,248
Aug 2011033583.404.15$1,390
Jul 2011032494.144.52$1,464
Jun 2011031492.904.64$1,457
May 2011025298.134.40$1,110
Apr 2011078105.964.33$338
Mar 201108496.364.06$341
Feb 2011017485.644.18$727
Jan 2011038786.504.59$1,776
Dec 2010038585.734.35$1,674
Nov 2010036680.843.80$1,389
Oct 2010037978.103.51$1,330
Sep 2010025672.633.98$1,019
Aug 2010033773.684.42$1,489
Jul 2010032572.554.74$1,539
Jun 2010037870.364.91$1,856
May 2010041571.124.24$1,758
Apr 2010027381.694.12$1,125
Mar 2010539878.394.39$2,139
Feb 2010030473.585.44$1,654
Jan 2010039474.365.96$2,350
Dec 2009041371.445.48$2,265
Nov 2009040974.593.75$1,534
Oct 2009038372.544.11$1,574
Sep 2009039365.543.06$1,204
Aug 2009035467.423.22$1,139
Jul 2009049761.133.46$1,722
Jun 2009048366.163.90$1,881
May 2009049854.743.93$1,955
Apr 2009050946.773.59$1,826
Mar 2009053542.144.06$2,172
Feb 2009049332.814.63$2,284
Jan 2009056035.865.37$3,008
Dec 2008055837.105.98$3,335
Nov 2008051655.496.86$3,540
Oct 2008043375.246.92$2,997
Sep 20080568101.767.88$4,474
Aug 20080630114.228.48$5,344
Jul 20080795131.0811.39$9,055
Jun 20080611131.3313.03$7,963
May 20080490123.1711.57$5,671
Apr 20080271110.3110.45$2,833
Mar 20080661101.909.66$6,388
Feb 2008040192.538.77$3,517
Jan 2008063890.388.21$5,235
Dec 2007067688.337.30$4,936
Nov 2007064791.677.29$4,718
Oct 2007067482.856.92$4,665
Sep 2007066375.846.24$4,140
Aug 2007069169.066.39$4,414
Jul 2007070070.906.39$4,472
Jun 2007070662.007.55$5,329
May 2007074858.747.85$5,869
Apr 2007052659.617.81$4,106
Mar 2007021056.927.30$1,533
Feb 2007020155.108.22$1,651
Jan 2007045550.306.73$3,061
Dec 2006076956.656.92$5,320
Nov 2006076254.207.62$5,805
Oct 2006074854.906.01$4,498
Sep 2006075660.085.04$3,808
Aug 2006070268.717.34$5,153
Jul 2006074869.376.34$4,744
Jun 2006042766.286.38$2,726
May 2006040266.016.42$2,583
Apr 2006068764.397.36$5,057
Mar 2006095156.707.08$6,736
Feb 2006083357.597.75$6,457
Jan 2006088460.598.93$7,897
Dec 2005092454.9413.42$12,396
Nov 2005097154.6910.59$10,281
Oct 200501,13858.3413.80$15,700
Sep 200501,11061.4512.08$13,408
Aug 200501,21961.519.80$11,942
Jul 200501,22755.697.84$9,624
Jun 200501,57452.337.38$11,618
May 200501,59145.226.65$10,582
Apr 200502,21149.207.36$16,274
Mar 200501,41550.377.15$10,124
Feb 200501,27945.226.31$8,073
Jan 200501,43143.166.32$9,047
Dec 200401,17339.866.75$7,919
Nov 200401,62045.286.33$10,255
Oct 200401,11149.706.52$7,238
Sep 200401,38643.245.28$7,323
Aug 200401,42142.375.55$7,887
Jul 200401,67338.286.08$10,179
Jun 200401,67536.106.43$10,775
May 200401,51937.486.49$9,865
Apr 200401,26434.475.86$7,405
Mar 200402,13834.365.53$11,823
Feb 200401,60832.455.51$8,859
Jan 200402,08932.036.30$13,160
Dec 200302,42830.266.30$15,300
Nov 200302,43328.804.60$11,180
Oct 200302,21828.174.76$10,557
Sep 200302,44626.314.75$11,617
Aug 200302,57029.765.13$13,183
Jul 200303,44529.415.17$17,814
Jun 200303,14828.565.98$18,834
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 2003016,61833.487.93$131,712

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   77 Mcf  × $  3.05 =       $235

────────────────────────────────────────────────────
Month total                                     $235

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/195859 is the state's own key, not one this site invented.