SHURLEY

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 195861District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$885 k
May 2003 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
277
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112003-12-09152145
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10 bbl$904
GasProduction151,447 Mcf$883,926
Total$884,830

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5057, -100.6492. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.50573, -100.64923 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,228 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,228 ft.

Completions filed
May 2003
1 of 1 wells

1 well

42-43536249776,228 ftMay 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (277)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

277 months

May 2026078106.413.05$238
Apr 202608598.932.87$244
Mar 202604289.753.15$132
Feb 202604463.503.75$165
Jan 202605959.138.00$472
Dec 202506356.664.41$278
Nov 202506658.593.93$259
Oct 202506459.383.30$212
Sep 202506262.743.08$191
Aug 202506863.933.01$205
Jul 202506566.743.32$215
Jun 202505666.483.13$175
May 202505960.553.23$191
Apr 202505962.363.54$209
Mar 202506267.704.27$265
Feb 202505870.884.34$252
Jan 202506974.324.28$295
Dec 202407768.993.12$240
Nov 202408469.052.20$185
Oct 202407971.372.28$180
Sep 202408069.612.36$189
Aug 202407575.632.06$155
Jul 202407979.932.15$170
Jun 202407178.082.63$187
May 202406778.812.20$147
Apr 202406584.451.66$108
Mar 202406880.301.55$105
Feb 202406076.091.78$107
Jan 202406973.023.30$228
Dec 202307571.262.61$196
Nov 202308077.892.81$225
Oct 202308385.443.09$256
Sep 202306689.042.74$181
Aug 202306080.522.67$160
Jul 202306574.852.64$172
Jun 202307068.962.26$158
May 202306970.622.23$154
Apr 202306378.122.24$141
Mar 202306472.852.39$153
Feb 202306775.112.47$165
Jan 202306076.533.39$203
Dec 202206176.415.73$349
Nov 202206785.005.65$378
Oct 202207287.185.86$422
Sep 202208084.888.16$653
Aug 202208394.529.13$758
Jul 2022087101.587.54$656
Jun 2022086115.097.98$686
May 2022092109.378.43$776
Apr 20220101104.226.84$691
Mar 20220110108.885.08$558
Feb 202206791.054.86$326
Jan 202203381.844.54$150
Dec 202104171.323.90$160
Nov 202105377.435.24$278
Oct 202107379.795.71$417
Sep 202107669.865.35$407
Aug 202109366.024.22$393
Jul 202109870.783.98$390
Jun 2021010569.493.38$355
May 2021010963.483.02$329
Apr 2021010460.362.76$287
Mar 2021013661.302.72$370
Feb 202109457.805.55$522
Jan 202106850.412.81$191
Dec 202008344.642.68$222
Nov 20200038.772.71$0
Oct 202001836.972.48$45
Sep 202003837.091.99$76
Aug 202007939.982.39$188
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 202004216.921.81$76
Apr 2020019314.751.80$348
Mar 2020019230.341.86$356
Feb 202002649.881.98$52
Jan 202007857.252.09$163
Dec 201907359.012.30$168
Nov 2019011255.302.75$308
Oct 2019011953.472.42$288
Sep 2019012455.052.66$330
Aug 2019012153.112.30$279
Jul 2019012256.272.46$300
Jun 2019012252.782.49$304
May 2019012958.482.74$354
Apr 2019013562.632.75$371
Mar 2019014456.803.06$441
Feb 2019015950.852.79$444
Jan 2019016946.033.23$546
Dec 2018019346.594.19$808
Nov 2018017452.934.24$737
Oct 2018020361.443.40$690
Sep 2018014259.543.11$441
Aug 2018015359.403.07$469
Jul 2018015765.142.93$460
Jun 2018015260.183.08$468
May 2018017465.382.90$505
Apr 2018019163.842.90$554
Mar 2018015961.222.79$443
Feb 2018013461.782.77$371
Jan 2018014162.874.01$565
Dec 2017012657.272.92$368
Nov 2017014455.423.12$449
Oct 2017014649.292.98$436
Sep 2017015047.523.09$463
Aug 2017015445.373.00$463
Jul 2017016043.873.09$494
Jun 2017015942.493.09$491
May 2017016345.373.26$532
Apr 2017017247.933.21$552
Mar 2017020946.772.98$624
Feb 2017019850.452.95$585
Jan 2017021249.413.42$725
Dec 2016019248.763.72$715
Nov 2016020042.492.64$529
Oct 2016022846.193.09$705
Sep 2016025541.553.10$791
Aug 2016023941.442.92$699
Jul 2016021841.622.92$638
Jun 2016023745.352.69$637
May 2016024742.521.99$492
Apr 2016019936.561.99$396
Mar 2016028033.011.79$502
Feb 2016019326.472.06$398
Jan 2016021527.352.36$508
Dec 2015020632.362.00$412
Nov 2015021438.792.17$464
Oct 2015024743.552.43$599
Sep 2015026042.992.76$717
Aug 2015026540.162.87$761
Jul 201506648.152.95$194
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 201403078.303.90$117
Sep 2014044586.164.05$1,800
Aug 2014037289.394.04$1,501
Jul 2014047496.564.18$1,981
Jun 2014018698.164.74$881
May 2014039194.734.73$1,848
Apr 2014038195.944.81$1,832
Mar 2014034795.895.06$1,755
Feb 2014036597.406.19$2,260
Jan 2014041490.404.86$2,012
Dec 2013041291.824.35$1,794
Nov 2013040788.853.74$1,521
Oct 2013044697.423.78$1,686
Sep 20130435104.113.72$1,617
Aug 20130496104.253.52$1,747
Jul 20130389102.523.72$1,446
Jun 2013042594.403.93$1,672
May 2013053694.834.15$2,224
Apr 2013037193.964.28$1,589
Mar 2013047693.623.91$1,863
Feb 2013049791.233.42$1,700
Jan 20130091.603.42$0
Dec 201201186.773.42$38
Nov 2012034086.953.62$1,232
Oct 2012041589.383.40$1,411
Sep 2012042894.672.92$1,249
Aug 2012042992.662.91$1,248
Jul 2012043185.133.02$1,302
Jun 2012042879.822.52$1,078
May 2012046791.612.49$1,162
Apr 20120445101.652.00$889
Mar 20120450105.052.22$1,000
Feb 20120418101.102.57$1,074
Jan 2012045098.092.73$1,230
Dec 2011046496.873.24$1,503
Nov 2011651095.723.31$2,263
Oct 2011033084.983.65$1,204
Sep 2011027983.623.99$1,112
Aug 2011040783.404.15$1,689
Jul 2011135994.144.52$1,716
Jun 2011039492.904.64$1,828
May 2011047598.134.40$2,092
Apr 20110355105.964.33$1,538
Mar 2011051396.364.06$2,081
Feb 2011045785.644.18$1,910
Jan 2011051786.504.59$2,372
Dec 2010048185.734.35$2,091
Nov 2010031480.843.80$1,192
Oct 2010048778.103.51$1,709
Sep 2010053772.633.98$2,137
Aug 2010054973.684.42$2,426
Jul 2010055672.554.74$2,633
Jun 2010055770.364.91$2,735
May 2010055571.124.24$2,351
Apr 2010047681.694.12$1,962
Mar 2010358978.394.39$2,820
Feb 2010049373.585.44$2,683
Jan 2010052774.365.96$3,143
Dec 2009050371.445.48$2,758
Nov 2009058174.593.75$2,180
Oct 2009052072.544.11$2,137
Sep 2009055865.543.06$1,710
Aug 2009055767.423.22$1,793
Jul 2009056361.133.46$1,951
Jun 2009053066.163.90$2,064
May 2009064754.743.93$2,540
Apr 2009056246.773.59$2,016
Mar 2009047942.144.06$1,944
Feb 2009049032.814.63$2,270
Jan 2009061335.865.37$3,292
Dec 2008052237.105.98$3,120
Nov 2008059655.496.86$4,089
Oct 2008055575.246.92$3,842
Sep 20080638101.767.88$5,026
Aug 20080646114.228.48$5,480
Jul 20080646131.0811.39$7,358
Jun 20080677131.3313.03$8,823
May 20080721123.1711.57$8,345
Apr 20080707110.3110.45$7,392
Mar 20080711101.909.66$6,871
Feb 2008070692.538.77$6,192
Jan 2008076190.388.21$6,245
Dec 2007077188.337.30$5,630
Nov 2007074891.677.29$5,454
Oct 2007063882.856.92$4,416
Sep 2007050475.846.24$3,147
Aug 2007059369.066.39$3,788
Jul 2007063570.906.39$4,056
Jun 2007076362.007.55$5,759
May 2007083758.747.85$6,567
Apr 2007063959.617.81$4,988
Mar 2007069956.927.30$5,104
Feb 2007068255.108.22$5,603
Jan 2007076450.306.73$5,139
Dec 2006073656.656.92$5,092
Nov 2006078954.207.62$6,010
Oct 2006083254.906.01$5,003
Sep 2006082660.085.04$4,161
Aug 2006086968.717.34$6,378
Jul 2006089969.376.34$5,702
Jun 2006090066.286.38$5,745
May 2006098266.016.42$6,309
Apr 2006088464.397.36$6,507
Mar 200601,05256.707.08$7,451
Feb 2006098257.597.75$7,612
Jan 200601,13260.598.93$10,113
Dec 200501,13154.9413.42$15,173
Nov 200501,03454.6910.59$10,948
Oct 200501,19458.3413.80$16,472
Sep 200501,18961.4512.08$14,362
Aug 200501,32461.519.80$12,971
Jul 200501,31055.697.84$10,275
Jun 200501,93052.337.38$14,245
May 200501,42745.226.65$9,491
Apr 200502,37849.207.36$17,503
Mar 200502,35450.377.15$16,843
Feb 200502,26345.226.31$14,284
Jan 200502,50143.166.32$15,812
Dec 200402,19239.866.75$14,798
Nov 200402,35345.286.33$14,895
Oct 200402,42249.706.52$15,780
Sep 200402,57843.245.28$13,622
Aug 200402,48742.375.55$13,804
Jul 200402,00938.286.08$12,223
Jun 200402,60836.106.43$16,777
May 200402,10237.486.49$13,652
Apr 200402,11334.475.86$12,379
Mar 200402,34834.365.53$12,985
Feb 200402,07232.455.51$11,416
Jan 200402,25632.036.30$14,212
Dec 200302,33830.266.30$14,733
Nov 200302,91428.804.60$13,390
Oct 200302,89728.174.76$13,789
Sep 200303,29926.314.75$15,668
Aug 2003076829.765.13$3,940
Jul 200304,71629.415.17$24,386
Jun 2003014,15828.565.98$84,707
May 20030026.595.97$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   78 Mcf  × $  3.05 =       $238

────────────────────────────────────────────────────
Month total                                     $238

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well