FRIEND "D"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA, NE. (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 196004District 7CField 679980752 tax incentive programmesCondensateGasSaveExport
Value, all time
$347 k
Mar 2003 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
279
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 800 leases and 804 wells, and the rule below applies to all of them.

Discovered
1995-10-03
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1997-02-27.

The Commission's schedule remark for this field reads: 38. DOCKET 7C-0214353 EFF 2/27/97 SIGNED 2/4/97

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112003-09-25153114
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3 bbl$313
GasProduction60,906 Mcf$346,715
Total$347,027

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6972, -101.1636. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.69717, -101.16362 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,700 ft.

Completions filed
Mar 2003
1 of 1 wells

1 well

42-1053877766,700 ftMar 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (279)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

279 months

May 20260140106.413.05$426
Apr 2026013898.932.87$396
Mar 20260089.753.15$0
Feb 2026010663.503.75$398
Jan 2026011459.138.00$912
Dec 2025011956.664.41$525
Nov 2025011658.593.93$455
Oct 2025011459.383.30$377
Sep 2025011062.743.08$338
Aug 2025012463.933.01$374
Jul 2025011066.743.32$365
Jun 2025010866.483.13$338
May 2025012160.553.23$391
Apr 2025011362.363.54$400
Mar 2025011067.704.27$470
Feb 2025011170.884.34$482
Jan 2025012574.324.28$535
Dec 2024012168.993.12$378
Nov 2024012069.052.20$264
Oct 2024012471.372.28$283
Sep 2024011469.612.36$270
Aug 2024012375.632.06$254
Jul 2024011679.932.15$249
Jun 2024012078.082.63$316
May 2024011878.812.20$259
Apr 2024011684.451.66$192
Mar 2024012580.301.55$193
Feb 2024012176.091.78$216
Jan 2024012273.023.30$402
Dec 2023013071.262.61$339
Nov 2023012877.892.81$359
Oct 2023014285.443.09$438
Sep 2023012289.042.74$334
Aug 2023013180.522.67$350
Jul 2023013474.852.64$354
Jun 2023011468.962.26$257
May 2023012970.622.23$287
Apr 2023012878.122.24$286
Mar 2023011972.852.39$285
Feb 2023010875.112.47$266
Jan 2023011976.533.39$403
Dec 2022013276.415.73$756
Nov 2022011785.005.65$661
Oct 2022012287.185.86$715
Sep 2022011984.888.16$971
Aug 2022013294.529.13$1,205
Jul 20220129101.587.54$973
Jun 20220113115.097.98$901
May 20220123109.378.43$1,037
Apr 20223112104.226.84$1,078
Mar 2022067108.885.08$340
Feb 202206691.054.86$321
Jan 2022011081.844.54$499
Dec 202108771.323.90$339
Nov 202109477.435.24$492
Oct 2021016079.795.71$914
Sep 202103169.865.35$166
Aug 2021011566.024.22$485
Jul 2021013170.783.98$522
Jun 2021014169.493.38$477
May 2021013263.483.02$398
Apr 2021015160.362.76$417
Mar 2021015761.302.72$427
Feb 2021012657.805.55$699
Jan 2021014850.412.81$416
Dec 2020016244.642.68$433
Nov 2020015538.772.71$420
Oct 2020015236.972.48$377
Sep 2020015537.091.99$309
Aug 2020016439.982.39$391
Jul 2020016438.371.83$299
Jun 2020014334.901.69$242
May 2020016116.921.81$292
Apr 2020014814.751.80$267
Mar 2020018030.341.86$334
Feb 202006249.881.98$123
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 2019010755.302.75$294
Oct 2019014853.472.42$358
Sep 2019012055.052.66$319
Aug 2019010853.112.30$249
Jul 2019011756.272.46$288
Jun 2019010052.782.49$249
May 2019013258.482.74$362
Apr 201902062.632.75$55
Mar 201909956.803.06$303
Feb 201907650.852.79$212
Jan 201907346.033.23$236
Dec 20180046.594.19$0
Nov 201805052.934.24$212
Oct 201807361.443.40$248
Sep 201807359.543.11$227
Aug 201808659.403.07$264
Jul 201808665.142.93$252
Jun 201807060.183.08$215
May 201808465.382.90$244
Apr 201807663.842.90$220
Mar 201807361.222.79$203
Feb 201807461.782.77$205
Jan 201808962.874.01$357
Dec 201708357.272.92$242
Nov 201706755.423.12$209
Oct 201707849.292.98$233
Sep 201707847.523.09$241
Aug 201707945.373.00$237
Jul 201707543.873.09$232
Jun 201707842.493.09$241
May 201706745.373.26$219
Apr 201707847.933.21$251
Mar 201707946.772.98$236
Feb 201707750.452.95$227
Jan 201708049.413.42$274
Dec 201608648.763.72$320
Nov 201606442.492.64$169
Oct 201609746.193.09$300
Sep 201606341.553.10$195
Aug 201607641.442.92$222
Jul 201605741.622.92$167
Jun 201605545.352.69$148
May 201605542.521.99$110
Apr 201604036.561.99$80
Mar 201603033.011.79$54
Feb 201602326.472.06$47
Jan 201604027.352.36$95
Dec 201502932.362.00$58
Nov 201503938.792.17$85
Oct 201504543.552.43$109
Sep 201504542.992.76$124
Aug 201504340.162.87$124
Jul 201504448.152.95$130
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 201501549.822.71$41
Mar 201504042.892.93$117
Feb 201504644.662.98$137
Jan 201504143.433.10$127
Dec 201404154.693.59$147
Nov 201404070.464.25$170
Oct 201404278.303.90$164
Sep 201408886.164.05$356
Aug 201404989.394.04$198
Jul 201406096.564.18$251
Jun 201407198.164.74$336
May 201409794.734.73$458
Apr 2014010495.944.81$500
Mar 2014016195.895.06$814
Feb 2014014297.406.19$879
Jan 2014016590.404.86$802
Dec 2013016891.824.35$732
Nov 2013015688.853.74$583
Oct 2013017097.423.78$642
Sep 20130127104.113.72$472
Aug 2013078104.253.52$275
Jul 2013059102.523.72$219
Jun 201306094.403.93$236
May 201306694.834.15$274
Apr 201306593.964.28$278
Mar 201307093.623.91$274
Feb 2013011591.233.42$393
Jan 201301191.603.42$38
Dec 201209886.773.42$335
Nov 2012010186.953.62$366
Oct 2012018189.383.40$615
Sep 2012016494.672.92$479
Aug 2012016492.662.91$477
Jul 2012016585.133.02$498
Jun 2012016479.822.52$413
May 2012016991.612.49$421
Apr 20120164101.652.00$327
Mar 20120178105.052.22$396
Feb 2012070101.102.57$180
Jan 201205898.092.73$159
Dec 201106496.873.24$207
Nov 201107595.723.31$248
Oct 2011011084.983.65$401
Sep 2011014983.623.99$594
Aug 2011016683.404.15$689
Jul 2011018094.144.52$813
Jun 2011017792.904.64$821
May 2011019798.134.40$868
Apr 2011095105.964.33$412
Mar 2011019396.364.06$783
Feb 2011017185.644.18$715
Jan 2011018786.504.59$858
Dec 2010020885.734.35$904
Nov 2010013480.843.80$509
Oct 2010011878.103.51$414
Sep 2010011972.633.98$474
Aug 2010011173.684.42$491
Jul 2010012272.554.74$578
Jun 2010011670.364.91$570
May 2010011771.124.24$496
Apr 2010013481.694.12$552
Mar 201002178.394.39$92
Feb 20100073.585.44$0
Jan 201001574.365.96$89
Dec 200903971.445.48$214
Nov 200904474.593.75$165
Oct 200903472.544.11$140
Sep 2009010065.543.06$306
Aug 200907167.423.22$229
Jul 2009014461.133.46$499
Jun 2009012566.163.90$487
May 2009013054.743.93$510
Apr 2009013146.773.59$470
Mar 2009013042.144.06$528
Feb 2009015132.814.63$700
Jan 2009013235.865.37$709
Dec 200809037.105.98$538
Nov 2008012555.496.86$858
Oct 2008016575.246.92$1,142
Sep 20080104101.767.88$819
Aug 20080152114.228.48$1,289
Jul 20080194131.0811.39$2,210
Jun 20080213131.3313.03$2,776
May 20080236123.1711.57$2,732
Apr 20080248110.3110.45$2,593
Mar 20080285101.909.66$2,754
Feb 2008027992.538.77$2,447
Jan 2008034390.388.21$2,815
Dec 2007030488.337.30$2,220
Nov 2007027091.677.29$1,969
Oct 2007028182.856.92$1,945
Sep 2007027875.846.24$1,736
Aug 2007032269.066.39$2,057
Jul 2007029470.906.39$1,878
Jun 2007029062.007.55$2,189
May 2007026558.747.85$2,079
Apr 2007026159.617.81$2,037
Mar 2007032256.927.30$2,351
Feb 2007033055.108.22$2,711
Jan 2007048550.306.73$3,263
Dec 2006042156.656.92$2,913
Nov 2006041954.207.62$3,192
Oct 2006050954.906.01$3,061
Sep 2006053460.085.04$2,690
Aug 2006045568.717.34$3,340
Jul 2006033669.376.34$2,131
Jun 2006035066.286.38$2,234
May 2006040266.016.42$2,583
Apr 2006043064.397.36$3,165
Mar 2006043756.707.08$3,095
Feb 2006045757.597.75$3,542
Jan 2006049160.598.93$4,386
Dec 2005055454.9413.42$7,432
Nov 2005051454.6910.59$5,442
Oct 2005051258.3413.80$7,063
Sep 2005050361.4512.08$6,076
Aug 2005061261.519.80$5,996
Jul 2005066555.697.84$5,216
Jun 2005067452.337.38$4,975
May 2005071345.226.65$4,742
Apr 2005067249.207.36$4,946
Mar 2005070950.377.15$5,073
Feb 2005066845.226.31$4,216
Jan 2005078143.166.32$4,938
Dec 2004076639.866.75$5,171
Nov 2004074345.286.33$4,704
Oct 2004081349.706.52$5,297
Sep 2004067743.245.28$3,577
Aug 2004079242.375.55$4,396
Jul 2004079938.286.08$4,861
Jun 200401,60836.106.43$10,344
May 2004085237.486.49$5,533
Apr 2004080034.475.86$4,687
Mar 2004078834.365.53$4,358
Feb 2004081332.455.51$4,479
Jan 2004096032.036.30$6,048
Dec 200301,00230.266.30$6,314
Nov 200301,11128.804.60$5,105
Oct 2003078528.174.76$3,736
Sep 200301,10526.314.75$5,248
Aug 200301,26729.765.13$6,499
Jul 200301,32329.415.17$6,841
Jun 200301,43828.565.98$8,604
May 200302,20926.595.97$13,194
Apr 20030026.675.41$0
Mar 20030031.146.10$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  140 Mcf  × $  3.05 =       $426

────────────────────────────────────────────────────
Month total                                     $426

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/196004 is the state's own key, not one this site invented.