MAYER 3D

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 197067District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$440 k
Apr 2003 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
278
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-10-21152803
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition35 bbl$2,004
GasProduction78,388 Mcf$437,916
Total$439,921

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5608, -100.8935. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.56084, -100.89353 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,497 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,497 ft.

Completions filed
Apr 2003
1 of 1 wells

1 well

42-4353619558,497 ftApr 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (278)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

278 months

May 20260128106.413.05$390
Apr 2026012698.932.87$362
Mar 2026012989.753.15$406
Feb 2026015163.503.75$566
Jan 202601359.138.00$104
Dec 202501156.664.41$49
Nov 202502458.593.93$94
Oct 202502759.383.30$89
Sep 202502862.743.08$86
Aug 202502563.933.01$75
Jul 202502266.743.32$73
Jun 202509666.483.13$300
May 2025013160.553.23$423
Apr 2025013962.363.54$492
Mar 2025214167.704.27$737
Feb 2025013470.884.34$582
Jan 2025015574.324.28$663
Dec 2024015668.993.12$487
Nov 2024016269.052.20$356
Oct 2024016971.372.28$386
Sep 2024016769.612.36$395
Aug 2024017275.632.06$355
Jul 2024017179.932.15$367
Jun 2024016578.082.63$435
May 2024016878.812.20$369
Apr 2024016684.451.66$275
Mar 2024017380.301.55$267
Feb 2024016676.091.78$296
Jan 2024016173.023.30$531
Dec 2023017471.262.61$454
Nov 2023017177.892.81$480
Oct 2023018085.443.09$556
Sep 2023017489.042.74$476
Aug 2023018180.522.67$484
Jul 2023017774.852.64$468
Jun 2023017068.962.26$384
May 2023017370.622.23$385
Apr 2023017078.122.24$380
Mar 2023018172.852.39$433
Feb 2023016275.112.47$399
Jan 2023017976.533.39$606
Dec 2022017476.415.73$997
Nov 2022018285.005.65$1,028
Oct 2022019087.185.86$1,114
Sep 2022018784.888.16$1,527
Aug 2022019594.529.13$1,780
Jul 20220196101.587.54$1,478
Jun 20220189115.097.98$1,508
May 20220196109.378.43$1,653
Apr 20220191104.226.84$1,306
Mar 20220192108.885.08$975
Feb 2022017291.054.86$836
Jan 2022019681.844.54$889
Dec 2021020671.323.90$803
Nov 2021019677.435.24$1,026
Oct 2021020579.795.71$1,171
Sep 2021020069.865.35$1,070
Aug 2021021066.024.22$886
Jul 2021421270.783.98$1,127
Jun 2021020469.493.38$690
May 2021021263.483.02$640
Apr 2021021460.362.76$590
Mar 2021021661.302.72$587
Feb 2021016057.805.55$888
Jan 2021021850.412.81$613
Dec 2020021144.642.68$565
Nov 2020020738.772.71$560
Oct 2020021436.972.48$530
Sep 2020021437.091.99$426
Aug 2020021939.982.39$522
Jul 2020022238.371.83$405
Jun 2020021834.901.69$368
May 2020022116.921.81$401
Apr 2020021414.751.80$386
Mar 2020025130.341.86$466
Feb 2020025349.881.98$501
Jan 2020024057.252.09$503
Dec 2019025059.012.30$576
Nov 2019725055.302.75$1,075
Oct 2019027853.472.42$672
Sep 20191229255.052.66$1,437
Aug 2019033853.112.30$779
Jul 2019037156.272.46$913
Jun 2019024952.782.49$620
May 2019041358.482.74$1,132
Apr 20190362.632.75$8
Mar 20190056.803.06$0
Feb 201901550.852.79$42
Jan 201907446.033.23$239
Dec 201807446.594.19$310
Nov 201807452.934.24$314
Oct 201808461.443.40$285
Sep 201807759.543.11$239
Aug 201807959.403.07$242
Jul 201808165.142.93$237
Jun 201807860.183.08$240
May 201807865.382.90$226
Apr 201807463.842.90$215
Mar 201807361.222.79$203
Feb 201806561.782.77$180
Jan 201817362.874.01$356
Dec 201707257.272.92$210
Nov 201707455.423.12$231
Oct 201717749.292.98$279
Sep 201708047.523.09$247
Aug 201708645.373.00$258
Jul 201709943.873.09$306
Jun 201709542.493.09$293
May 201708545.373.26$277
Apr 201708047.933.21$257
Mar 201728446.772.98$344
Feb 201707450.452.95$218
Jan 201708349.413.42$284
Dec 201618448.763.72$361
Nov 201607942.492.64$209
Oct 201607446.193.09$229
Sep 201607641.553.10$236
Aug 201607841.442.92$228
Jul 201607841.622.92$228
Jun 201617845.352.69$255
May 201608442.521.99$167
Apr 201609536.561.99$189
Mar 2016023633.011.79$423
Feb 201612526.472.06$78
Jan 20160827.352.36$19
Dec 201501732.362.00$34
Nov 2015013338.792.17$288
Oct 2015014143.552.43$342
Sep 2015013942.992.76$383
Aug 2015015040.162.87$431
Jul 2015014648.152.95$430
Jun 2015014056.152.88$404
May 2015013555.212.96$399
Apr 2015012649.822.71$341
Mar 2015013442.892.93$393
Feb 2015011044.662.98$327
Jan 2015013443.433.10$415
Dec 2014013254.693.59$474
Nov 2014013670.464.25$578
Oct 2014013978.303.90$542
Sep 2014013086.164.05$526
Aug 2014015689.394.04$629
Jul 2014013196.564.18$548
Jun 2014013998.164.74$658
May 2014013294.734.73$624
Apr 201408995.944.81$428
Mar 201407695.895.06$384
Feb 201406797.406.19$415
Jan 201407490.404.86$360
Dec 201307191.824.35$309
Nov 201308188.853.74$303
Oct 2013010397.423.78$389
Sep 20130121104.113.72$450
Aug 20130144104.253.52$507
Jul 20130143102.523.72$532
Jun 2013014494.403.93$566
May 2013013594.834.15$560
Apr 2013012693.964.28$540
Mar 2013012993.623.91$505
Feb 2013011091.233.42$376
Jan 2013011891.603.42$404
Dec 2012012486.773.42$424
Nov 2012013986.953.62$504
Oct 2012015189.383.40$513
Sep 2012016494.672.92$479
Aug 2012017992.662.91$521
Jul 2012019185.133.02$577
Jun 2012018079.822.52$453
May 2012018091.612.49$448
Apr 20120180101.652.00$359
Mar 20120172105.052.22$382
Feb 20120139101.102.57$357
Jan 2012014198.092.73$386
Dec 2011013696.873.24$441
Nov 2011015195.723.31$500
Oct 2011017784.983.65$646
Sep 2011019283.623.99$765
Aug 2011021683.404.15$896
Jul 2011023494.144.52$1,057
Jun 2011022992.904.64$1,063
May 2011022898.134.40$1,004
Apr 20110212105.964.33$919
Mar 2011021096.364.06$852
Feb 2011016785.644.18$698
Jan 2011017986.504.59$821
Dec 2010018585.734.35$804
Nov 2010020580.843.80$778
Oct 2010024578.103.51$860
Sep 2010025572.633.98$1,015
Aug 2010027873.684.42$1,229
Jul 2010031172.554.74$1,473
Jun 2010018170.364.91$889
May 2010123871.124.24$1,079
Apr 2010022181.694.12$911
Mar 2010023378.394.39$1,023
Feb 2010021673.585.44$1,176
Jan 2010024074.365.96$1,431
Dec 2009025071.445.48$1,371
Nov 2009021274.593.75$795
Oct 2009017572.544.11$719
Sep 2009020465.543.06$625
Aug 2009022967.423.22$737
Jul 2009023061.133.46$797
Jun 2009023766.163.90$923
May 2009025654.743.93$1,005
Apr 2009025846.773.59$926
Mar 2009028542.144.06$1,157
Feb 2009021932.814.63$1,015
Jan 2009024135.865.37$1,294
Dec 2008024737.105.98$1,476
Nov 2008028155.496.86$1,928
Oct 2008031175.246.92$2,153
Sep 20080317101.767.88$2,497
Aug 20081340114.228.48$2,998
Jul 20080421131.0811.39$4,795
Jun 20080729131.3313.03$9,501
May 20080330123.1711.57$3,820
Apr 20080232110.3110.45$2,426
Mar 20080198101.909.66$1,913
Feb 2008018992.538.77$1,658
Jan 2008020190.388.21$1,649
Dec 2007021688.337.30$1,577
Nov 2007023391.677.29$1,699
Oct 2007027682.856.92$1,910
Sep 2007028675.846.24$1,786
Aug 2007029969.066.39$1,910
Jul 2007037070.906.39$2,364
Jun 2007033662.007.55$2,536
May 2007036458.747.85$2,856
Apr 2007032559.617.81$2,537
Mar 2007034756.927.30$2,534
Feb 2007033055.108.22$2,711
Jan 2007031250.306.73$2,099
Dec 2006033856.656.92$2,338
Nov 2006035754.207.62$2,719
Oct 2006028654.906.01$1,720
Sep 2006037360.085.04$1,879
Aug 2006036668.717.34$2,686
Jul 2006045169.376.34$2,861
Jun 2006074866.286.38$4,775
May 2006082866.016.42$5,320
Apr 2006080564.397.36$5,925
Mar 2006083556.707.08$5,914
Feb 2006076857.597.75$5,953
Jan 2006089960.598.93$8,031
Dec 2005079454.9413.42$10,652
Nov 2005070554.6910.59$7,465
Oct 2005071658.3413.80$9,878
Sep 2005072361.4512.08$8,733
Aug 2005078361.519.80$7,671
Jul 2005091555.697.84$7,177
Jun 2005092652.337.38$6,835
May 2005080945.226.65$5,381
Apr 2005064849.207.36$4,770
Mar 2005071150.377.15$5,087
Feb 2005086245.226.31$5,441
Jan 2005099143.166.32$6,265
Dec 200401,26939.866.75$8,567
Nov 2004086845.286.33$5,495
Oct 2004094849.706.52$6,176
Sep 200401,04043.245.28$5,495
Aug 2004093442.375.55$5,184
Jul 2004095438.286.08$5,804
Jun 2004086636.106.43$5,571
May 2004098537.486.49$6,397
Apr 2004073834.475.86$4,324
Mar 2004064234.365.53$3,550
Feb 2004071932.455.51$3,961
Jan 2004079332.036.30$4,996
Dec 2003096130.266.30$6,056
Nov 2003094428.804.60$4,338
Oct 200301,31628.174.76$6,264
Sep 200301,20926.314.75$5,742
Aug 200301,31129.765.13$6,725
Jul 200301,31829.415.17$6,815
Jun 200301,02428.565.98$6,127
May 200311,12326.595.97$6,734
Apr 200301,70126.675.41$9,198

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  128 Mcf  × $  3.05 =       $390

────────────────────────────────────────────────────
Month total                                     $390

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/197067 is the state's own key, not one this site invented.