MAYER 3C

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 197559District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$735 k
Apr 2003 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
278
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-07-21152613
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition56 bbl$3,365
GasProduction134,876 Mcf$731,598
Total$734,963

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5581, -100.8791. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.55808, -100.87908 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,590 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,590 ft.

Completions filed
Apr 2003
1 of 1 wells

1 well

42-4353620478,590 ftApr 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (278)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

278 months

May 20260137106.413.05$417
Apr 2026012998.932.87$370
Mar 2026013689.753.15$428
Feb 2026012363.503.75$461
Jan 2026012759.138.00$1,016
Dec 2025013256.664.41$583
Nov 2025013258.593.93$518
Oct 2025014259.383.30$469
Sep 2025013962.743.08$428
Aug 2025014863.933.01$446
Jul 2025015266.743.32$504
Jun 2025014966.483.13$466
May 2025015460.553.23$498
Apr 2025015462.363.54$546
Mar 2025116267.704.27$759
Feb 2025014970.884.34$647
Jan 2025016574.324.28$706
Dec 2024016968.993.12$528
Nov 2024016969.052.20$372
Oct 2024017171.372.28$390
Sep 2024015869.612.36$374
Aug 2024016675.632.06$343
Jul 2024016579.932.15$354
Jun 2024015778.082.63$414
May 2024016078.812.20$352
Apr 2024015784.451.66$260
Mar 2024016280.301.55$250
Feb 2024015476.091.78$275
Jan 2024016473.023.30$541
Dec 2023016471.262.61$428
Nov 2023015877.892.81$444
Oct 2023016485.443.09$506
Sep 2023015889.042.74$432
Aug 2023016780.522.67$446
Jul 2023016574.852.64$436
Jun 2023015968.962.26$359
May 2023016470.622.23$365
Apr 2023016078.122.24$358
Mar 2023016372.852.39$390
Feb 2023014575.112.47$358
Jan 2023015576.533.39$525
Dec 2022015876.415.73$905
Nov 2022015285.005.65$858
Oct 2022016187.185.86$944
Sep 2022015484.888.16$1,257
Aug 2022015894.529.13$1,442
Jul 20220160101.587.54$1,207
Jun 20220155115.097.98$1,236
May 20220163109.378.43$1,375
Apr 20220159104.226.84$1,087
Mar 20220158108.885.08$802
Feb 2022014691.054.86$709
Jan 2022016381.844.54$740
Dec 2021016571.323.90$643
Nov 2021015877.435.24$827
Oct 2021016579.795.71$943
Sep 2021016369.865.35$872
Aug 2021016966.024.22$713
Jul 2021117070.783.98$748
Jun 2021016669.493.38$561
May 2021017163.483.02$516
Apr 2021016960.362.76$466
Mar 2021017461.302.72$473
Feb 2021013257.805.55$732
Jan 2021018250.412.81$511
Dec 2020017144.642.68$458
Nov 2020016638.772.71$449
Oct 2020017436.972.48$431
Sep 2020017937.091.99$356
Aug 2020018139.982.39$432
Jul 2020018138.371.83$330
Jun 2020017034.901.69$287
May 2020016916.921.81$307
Apr 2020017014.751.80$307
Mar 2020019130.341.86$355
Feb 2020018849.881.98$372
Jan 2020019057.252.09$398
Dec 2019019659.012.30$452
Nov 2019118955.302.75$575
Oct 2019020953.472.42$505
Sep 2019124055.052.66$693
Aug 2019021053.112.30$484
Jul 2019024456.272.46$600
Jun 2019016552.782.49$411
May 2019021058.482.74$575
Apr 2019021162.632.75$580
Mar 2019021556.803.06$658
Feb 2019020150.852.79$561
Jan 2019022046.033.23$710
Dec 2018022446.594.19$938
Nov 2018022052.934.24$932
Oct 2018024961.443.40$846
Sep 2018026459.543.11$821
Aug 2018027459.403.07$840
Jul 2018028165.142.93$824
Jun 2018127160.183.08$894
May 2018027965.382.90$809
Apr 2018126763.842.90$838
Mar 2018027861.222.79$775
Feb 2018024861.782.77$686
Jan 2018127462.874.01$1,161
Dec 2017027357.272.92$798
Nov 2017027055.423.12$842
Oct 2017328649.292.98$1,001
Sep 2017027947.523.09$861
Aug 2017029245.373.00$877
Jul 2017029443.873.09$908
Jun 2017028642.493.09$883
May 2017028645.373.26$933
Apr 2017028047.933.21$899
Mar 2017329346.772.98$1,015
Feb 2017026150.452.95$771
Jan 2017028949.413.42$988
Dec 2016329248.763.72$1,233
Nov 2016029342.492.64$775
Oct 2016030946.193.09$955
Sep 2016029941.553.10$927
Aug 2016031041.442.92$907
Jul 2016030741.622.92$898
Jun 2016230445.352.69$907
May 2016031442.521.99$625
Apr 2016031036.561.99$617
Mar 2016031733.011.79$569
Feb 2016229126.472.06$653
Jan 2016030327.352.36$716
Dec 2015031232.362.00$624
Nov 2015032438.792.17$702
Oct 2015038143.552.43$925
Sep 2015031142.992.76$858
Aug 2015033240.162.87$954
Jul 2015133948.152.95$1,047
Jun 2015033856.152.88$974
May 2015035555.212.96$1,049
Apr 2015035749.822.71$966
Mar 2015135442.892.93$1,082
Feb 2015027844.662.98$827
Jan 2015031443.433.10$974
Dec 2014032054.693.59$1,149
Nov 2014133770.464.25$1,503
Oct 2014036378.303.90$1,416
Sep 2014030086.164.05$1,214
Aug 2014030989.394.04$1,247
Jul 2014033396.564.18$1,392
Jun 2014034698.164.74$1,639
May 2014038194.734.73$1,801
Apr 2014138295.944.81$1,933
Mar 2014039495.895.06$1,992
Feb 2014034497.406.19$2,130
Jan 2014138290.404.86$1,947
Dec 2013037991.824.35$1,650
Nov 2013037688.853.74$1,406
Oct 2013139197.423.78$1,575
Sep 20130381104.113.72$1,416
Aug 20130391104.253.52$1,377
Jul 20130396102.523.72$1,472
Jun 2013038394.403.93$1,507
May 2013039694.834.15$1,643
Apr 2013138793.964.28$1,751
Mar 2013040593.623.91$1,585
Feb 2013136191.233.42$1,326
Jan 2013040691.603.42$1,388
Dec 2012140486.773.42$1,469
Nov 2012039286.953.62$1,421
Oct 2012039489.383.40$1,339
Sep 2012040094.672.92$1,167
Aug 2012142792.662.91$1,334
Jul 2012042585.133.02$1,284
Jun 2012040579.822.52$1,020
May 2012042291.612.49$1,050
Apr 20120412101.652.00$823
Mar 20121408105.052.22$1,012
Feb 20120400101.102.57$1,028
Jan 2012143198.092.73$1,276
Dec 2011143296.873.24$1,496
Nov 2011042295.723.31$1,397
Oct 2011144084.983.65$1,690
Sep 2011042683.623.99$1,698
Aug 2011043983.404.15$1,822
Jul 2011044894.144.52$2,024
Jun 2011043692.904.64$2,023
May 2011044798.134.40$1,969
Apr 20111422105.964.33$1,935
Mar 2011044096.364.06$1,785
Feb 2011038185.644.18$1,593
Jan 2011147586.504.59$2,266
Dec 2010048085.734.35$2,087
Nov 2010140380.843.80$1,610
Oct 2010052178.103.51$1,828
Sep 2010049472.633.98$1,966
Aug 2010049773.684.42$2,196
Jul 2010042972.554.74$2,032
Jun 2010142070.364.91$2,133
May 2010044271.124.24$1,872
Apr 2010041881.694.12$1,723
Mar 2010044678.394.39$1,957
Feb 2010020873.585.44$1,132
Jan 2010020674.365.96$1,229
Dec 2009128771.445.48$1,645
Nov 2009047574.593.75$1,782
Oct 2009046172.544.11$1,895
Sep 2009043165.543.06$1,321
Aug 2009047267.423.22$1,519
Jul 2009051861.133.46$1,795
Jun 2009051066.163.90$1,986
May 2009052454.743.93$2,057
Apr 2009050746.773.59$1,819
Mar 2009044142.144.06$1,790
Feb 2009047932.814.63$2,219
Jan 2009050535.865.37$2,712
Dec 2008051337.105.98$3,066
Nov 2008052155.496.86$3,574
Oct 2008054175.246.92$3,745
Sep 20080536101.767.88$4,222
Aug 20080559114.228.48$4,742
Jul 20080562131.0811.39$6,401
Jun 20080552131.3313.03$7,194
May 20080568123.1711.57$6,574
Apr 20080553110.3110.45$5,782
Mar 20080583101.909.66$5,634
Feb 2008056192.538.77$4,920
Jan 2008159390.388.21$4,956
Dec 2007060188.337.30$4,388
Nov 2007058691.677.29$4,273
Oct 2007062282.856.92$4,305
Sep 2007060875.846.24$3,796
Aug 2007061569.066.39$3,929
Jul 2007163370.906.39$4,114
Jun 2007062362.007.55$4,703
May 2007064058.747.85$5,022
Apr 2007062159.617.81$4,847
Mar 2007062956.927.30$4,593
Feb 2007059555.108.22$4,889
Jan 2007066950.306.73$4,500
Dec 2006066356.656.92$4,587
Nov 2006064954.207.62$4,944
Oct 2006070754.906.01$4,252
Sep 2006076060.085.04$3,828
Aug 2006099568.717.34$7,303
Jul 2006078469.376.34$4,973
Jun 2006093066.286.38$5,937
May 2006075466.016.42$4,844
Apr 2006058764.397.36$4,321
Mar 2006073156.707.08$5,178
Feb 2006168357.597.75$5,352
Jan 200601,35860.598.93$12,131
Dec 200501,20654.9413.42$16,179
Nov 200511,11954.6910.59$11,903
Oct 200501,04058.3413.80$14,348
Sep 200501,08161.4512.08$13,057
Aug 200501,11961.519.80$10,963
Jul 200501,09855.697.84$8,612
Jun 200511,12052.337.38$8,319
May 200501,06945.226.65$7,110
Apr 2005087449.207.36$6,433
Mar 2005194650.377.15$6,819
Feb 200501,10545.226.31$6,975
Jan 200511,05943.166.32$6,738
Dec 200401,02539.866.75$6,920
Nov 200401,31945.286.33$8,350
Oct 200411,33949.706.52$8,773
Sep 200401,34743.245.28$7,117
Aug 200401,44242.375.55$8,004
Jul 200401,57338.286.08$9,570
Jun 200401,53736.106.43$9,888
May 200411,54637.486.49$10,078
Apr 200401,32534.475.86$7,762
Mar 200411,99334.365.53$11,056
Feb 200402,33832.455.51$12,881
Jan 200411,80032.036.30$11,371
Dec 200301,87830.266.30$11,834
Nov 200312,09628.804.60$9,660
Oct 200312,43528.174.76$11,618
Sep 200301,96426.314.75$9,328
Aug 200302,12129.765.13$10,880
Jul 200312,30329.415.17$11,938
Jun 200312,09328.565.98$12,551
May 200322,57626.595.97$15,439
Apr 200303,78326.675.41$20,456

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  137 Mcf  × $  3.05 =       $417

────────────────────────────────────────────────────
Month total                                     $417

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/197559 is the state's own key, not one this site invented.