SAWYER - JONES

Operated by GREAT WESTERN DRILLING COMPANY (P-5 328780) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 197870District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$496 k
May 2003 – Mar 2017
Value, last 12 filed months
$0
at the published price for each month
Months reported
167
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-11-29166461
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition152 bbl$4,717
GasProduction74,049 Mcf$491,200
Total$495,917

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4600, -100.7749. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.46000, -100.77488 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,327 ft
1 wells filed one
Completion to plug
13.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,327 ft.

Completions filed
May 2003
1 of 1 wells
Plug dates filed
Mar 2017
1 of 1 wells

Last completion to plug: a median of 13.8 years across the 1 well that filed both dates, with the middle half between 13.8 years and 13.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4353620119027,327 ftMay 2003Mar 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (167)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

167 months

Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 201608426.472.06$173
Jan 201603427.352.36$80
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150340.162.87$9
Jul 20150748.152.95$21
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140196.564.18$4
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 2012014105.052.22$31
Feb 201200101.102.57$0
Jan 201201798.092.73$46
Dec 201103796.873.24$120
Nov 201102395.723.31$76
Oct 201101484.983.65$51
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 201103894.144.52$172
Jun 201106492.904.64$297
May 201107698.134.40$335
Apr 20110103105.964.33$446
Mar 2011029296.364.06$1,185
Feb 2011070885.644.18$2,959
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 2010026671.124.24$1,127
Apr 2010041781.694.12$1,719
Mar 2010044778.394.39$1,962
Feb 2010054273.585.44$2,950
Jan 2010028774.365.96$1,712
Dec 2009034971.445.48$1,914
Nov 2009038974.593.75$1,459
Oct 2009033872.544.11$1,389
Sep 2009041865.543.06$1,281
Aug 2009043067.423.22$1,384
Jul 2009043061.133.46$1,490
Jun 2009044266.163.90$1,722
May 2009050854.743.93$1,994
Apr 2009042546.773.59$1,525
Mar 2009046842.144.06$1,900
Feb 2009037532.814.63$1,737
Jan 2009053335.865.37$2,863
Dec 2008054437.105.98$3,252
Nov 2008085455.496.86$5,859
Oct 2008057575.246.92$3,980
Sep 20080528101.767.88$4,159
Aug 20080500114.228.48$4,242
Jul 20080475131.0811.39$5,410
Jun 20080422131.3313.03$5,500
May 20080484123.1711.57$5,602
Apr 20080626110.3110.45$6,545
Mar 20080695101.909.66$6,717
Feb 2008073192.538.77$6,411
Jan 2008093790.388.21$7,689
Dec 2007062988.337.30$4,593
Nov 2007073491.677.29$5,352
Oct 2007060582.856.92$4,188
Sep 2007049275.846.24$3,072
Aug 2007084669.066.39$5,404
Jul 2007082470.906.39$5,264
Jun 2007060962.007.55$4,597
May 2007170658.747.85$5,598
Apr 2007046859.617.81$3,653
Mar 2007086956.927.30$6,345
Feb 2007087255.108.22$7,164
Jan 2007064950.306.73$4,366
Dec 2006090656.656.92$6,268
Nov 2006059154.207.62$4,502
Oct 2006084054.906.01$5,052
Sep 2006071260.085.04$3,586
Aug 2006066068.717.34$4,844
Jul 2006087169.376.34$5,525
Jun 2006090366.286.38$5,765
May 200601,06466.016.42$6,836
Apr 2006091864.397.36$6,757
Mar 2006082556.707.08$5,843
Feb 2006068457.597.75$5,302
Jan 2006259960.598.93$5,472
Dec 2005043054.9413.42$5,769
Nov 200501,15754.6910.59$12,251
Oct 200521,07458.3413.80$14,933
Sep 200501,26661.4512.08$15,292
Aug 2005077661.519.80$7,602
Jul 2005061355.697.84$4,808
Jun 2005046052.337.38$3,395
May 2005071845.226.65$4,776
Apr 2005081149.207.36$5,969
Mar 200501,14050.377.15$8,157
Feb 200521,01645.226.31$6,503
Jan 200521,06543.166.32$6,819
Dec 2004053839.866.75$3,632
Nov 2004378245.286.33$5,086
Oct 2004198449.706.52$6,461
Sep 200411,13443.245.28$6,035
Aug 200421,21142.375.55$6,807
Jul 200401,22138.286.08$7,429
Jun 200421,02236.106.43$6,647
May 200431,43837.486.49$9,452
Apr 200401,19134.475.86$6,977
Mar 200401,23834.365.53$6,846
Feb 200411,31532.455.51$7,278
Jan 200401,56732.036.30$9,872
Dec 200301,61430.266.30$10,171
Nov 200301,45628.804.60$6,691
Oct 200301,55728.174.76$7,411
Sep 200301,94126.314.75$9,219
Aug 200301,98729.765.13$10,193
Jul 200302,44229.415.17$12,627
Jun 20031303,63628.565.98$25,467
May 200301,42326.595.97$8,499

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2016 — as filed, then multipliedworked
Condensate             0 bbl  × $ 26.47 =         $0
Gas                   84 Mcf  × $  2.06 =       $173

────────────────────────────────────────────────────
Month total                                     $173

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/197870 is the state's own key, not one this site invented.