VANDERSTUCKEN 51

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 198353District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$215 k
Jan 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
281
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-03-01152638
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition156 bbl$7,135
GasProduction31,832 Mcf$208,312
Total$215,447

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4702, -100.5853. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.47016, -100.58528 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,850 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,850 ft.

Completions filed
Jan 2003
1 of 1 wells

1 well

42-4353609185,850 ftJan 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (281)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

281 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180361.443.40$10
Sep 20180359.543.11$9
Aug 20180159.403.07$3
Jul 20180265.142.93$6
Jun 20180260.183.08$6
May 20180565.382.90$15
Apr 20180563.842.90$15
Mar 20180461.222.79$11
Feb 20180361.782.77$8
Jan 20180562.874.01$20
Dec 20170457.272.92$12
Nov 20170355.423.12$9
Oct 20170549.292.98$15
Sep 20170547.523.09$15
Aug 20170645.373.00$18
Jul 20170643.873.09$19
Jun 20170642.493.09$19
May 20170645.373.26$20
Apr 20170747.933.21$22
Mar 20170746.772.98$21
Feb 20170750.452.95$21
Jan 20170749.413.42$24
Dec 20160748.763.72$26
Nov 20160642.492.64$16
Oct 20160746.193.09$22
Sep 20160741.553.10$22
Aug 20160841.442.92$23
Jul 20160841.622.92$23
Jun 20160845.352.69$21
May 20160942.521.99$18
Apr 20160936.561.99$18
Mar 20160933.011.79$16
Feb 20160926.472.06$19
Jan 20160927.352.36$21
Dec 20150932.362.00$18
Nov 20150938.792.17$20
Oct 20150843.552.43$19
Sep 20150642.992.76$17
Aug 201501040.162.87$29
Jul 201501248.152.95$35
Jun 20150756.152.88$20
May 201501155.212.96$33
Apr 201501149.822.71$30
Mar 201501242.892.93$35
Feb 201501144.662.98$33
Jan 201501243.433.10$37
Dec 201401454.693.59$50
Nov 201401370.464.25$55
Oct 201401578.303.90$59
Sep 201401486.164.05$57
Aug 201401489.394.04$56
Jul 201401796.564.18$71
Jun 201401898.164.74$85
May 201401994.734.73$90
Apr 201401995.944.81$91
Mar 201401995.895.06$96
Feb 201402397.406.19$142
Jan 201402590.404.86$122
Dec 201302391.824.35$100
Nov 201302388.853.74$86
Oct 201302497.423.78$91
Sep 2013022104.113.72$82
Aug 2013025104.253.52$88
Jul 2013027102.523.72$100
Jun 201302894.403.93$110
May 201302994.834.15$120
Apr 201302893.964.28$120
Mar 201303093.623.91$117
Feb 201302991.233.42$99
Jan 201303291.603.42$109
Dec 201203286.773.42$109
Nov 201203386.953.62$120
Oct 201203489.383.40$116
Sep 201203294.672.92$93
Aug 201203192.662.91$90
Jul 201203485.133.02$103
Jun 201203579.822.52$88
May 201203691.612.49$90
Apr 201208101.652.00$16
Mar 2012024105.052.22$53
Feb 2012038101.102.57$98
Jan 201204198.092.73$112
Dec 201104296.873.24$136
Nov 201104395.723.31$142
Oct 201104484.983.65$161
Sep 201104183.623.99$163
Aug 201104383.404.15$178
Jul 201104494.144.52$199
Jun 201104492.904.64$204
May 201104798.134.40$207
Apr 2011046105.964.33$199
Mar 201104196.364.06$166
Feb 201104385.644.18$180
Jan 201105286.504.59$239
Dec 201005385.734.35$230
Nov 201005480.843.80$205
Oct 201005578.103.51$193
Sep 201005372.633.98$211
Aug 201005673.684.42$247
Jul 201005672.554.74$265
Jun 201005470.364.91$265
May 201005871.124.24$246
Apr 201005881.694.12$239
Mar 201005978.394.39$259
Feb 201005673.585.44$305
Jan 201006474.365.96$382
Dec 200906371.445.48$345
Nov 200906374.593.75$236
Oct 200906572.544.11$267
Sep 200906165.543.06$187
Aug 200906767.423.22$216
Jul 200907061.133.46$243
Jun 200906966.163.90$269
May 200907954.743.93$310
Apr 200906546.773.59$233
Mar 200907742.144.06$313
Feb 200907032.814.63$324
Jan 200907935.865.37$424
Dec 200807937.105.98$472
Nov 200807755.496.86$528
Oct 200808475.246.92$581
Sep 2008081101.767.88$638
Aug 2008089114.228.48$755
Jul 2008091131.0811.39$1,036
Jun 2008190131.3313.03$1,304
May 2008194123.1711.57$1,211
Apr 2008092110.3110.45$962
Mar 2008197101.909.66$1,039
Feb 200818992.538.77$873
Jan 2008010090.388.21$821
Dec 2007010088.337.30$730
Nov 200719991.677.29$814
Oct 2007111282.856.92$858
Sep 2007011775.846.24$731
Aug 200709069.066.39$575
Jul 200718870.906.39$633
Jun 2007013862.007.55$1,042
May 200706958.747.85$541
Apr 200718559.617.81$723
Mar 2007020256.927.30$1,475
Feb 2007031455.108.22$2,580
Jan 2007125450.306.73$1,759
Dec 2006130056.656.92$2,132
Nov 2006120254.207.62$1,593
Oct 2006120254.906.01$1,270
Sep 2006119960.085.04$1,062
Aug 2006020468.717.34$1,497
Jul 2006120669.376.34$1,376
Jun 2006119366.286.38$1,298
May 2006120766.016.42$1,396
Apr 2006020064.397.36$1,472
Mar 2006120656.707.08$1,516
Feb 2006119757.597.75$1,585
Jan 2006123860.598.93$2,187
Dec 2005123854.9413.42$3,248
Nov 2005125354.6910.59$2,734
Oct 2005126958.3413.80$3,769
Sep 2005326161.4512.08$3,337
Aug 2005027361.519.80$2,675
Jul 2005226355.697.84$2,174
Jun 2005324552.337.38$1,965
May 2005627345.226.65$2,087
Apr 2005936349.207.36$3,115
Mar 20051090250.377.15$6,957
Feb 20051075545.226.31$5,218
Jan 2005085843.166.32$5,424
Dec 20041287239.866.75$6,365
Nov 20041185545.286.33$5,911
Oct 2004111,00149.706.52$7,068
Sep 200401,02143.245.28$5,395
Aug 200461,07042.375.55$6,193
Jul 2004678038.286.08$4,975
Jun 2004039236.106.43$2,522
May 200461,03137.486.49$6,921
Apr 2004330934.475.86$1,914
Mar 2004418534.365.53$1,161
Feb 2004850232.455.51$3,025
Jan 2004663232.036.30$4,174
Dec 2003045730.266.30$2,880
Nov 200306328.804.60$290
Oct 2003111328.174.76$566
Sep 2003013626.314.75$646
Aug 2003016329.765.13$836
Jul 2003133329.415.17$1,751
Jun 2003118328.565.98$1,123
May 2003228826.595.97$1,773
Apr 2003730726.675.41$1,847
Mar 2003692131.146.10$5,801
Feb 200303,52233.487.93$27,915
Jan 200303,20030.315.58$17,863

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2018 — as filed, then multipliedworked
Condensate             0 bbl  × $ 61.44 =         $0
Gas                    3 Mcf  × $  3.40 =        $10

────────────────────────────────────────────────────
Month total                                      $10

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/198353 is the state's own key, not one this site invented.