PIERCE

Operated by EXTEX OPERATING COMPANY (P-5 257062) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 199337District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.2 M
Aug 2003 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
274
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-03-05153886
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition35 bbl$1,327
GasProduction555,371 Mcf$3,205,504
Total$3,206,830

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4061, -101.3810. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.40609, -101.38100 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,567 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,567 ft.

Completions filed
Aug 2003
1 of 1 wells

1 well

42-1053903666,567 ftAug 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (274)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

274 months

May 202600106.413.05$0
Apr 202601698.932.87$46
Mar 20260089.753.15$0
Feb 202604763.503.75$176
Jan 202609559.138.00$760
Dec 2025012856.664.41$565
Nov 202504258.593.93$165
Oct 2025012259.383.30$403
Sep 202504662.743.08$142
Aug 2025018563.933.01$558
Jul 2025014766.743.32$487
Jun 202502366.483.13$72
May 2025715260.553.23$915
Apr 2025017562.363.54$620
Mar 2025011667.704.27$495
Feb 2025019770.884.34$855
Jan 2025016474.324.28$702
Dec 2024021868.993.12$680
Nov 202409469.052.20$207
Oct 202405671.372.28$128
Sep 202409869.612.36$232
Aug 202401475.632.06$29
Jul 202409879.932.15$210
Jun 202402478.082.63$63
May 2024017078.812.20$374
Apr 20240084.451.66$0
Mar 2024011680.301.55$179
Feb 2024019576.091.78$348
Jan 2024018873.023.30$620
Dec 2023021071.262.61$548
Nov 2023020077.892.81$562
Oct 2023019585.443.09$602
Sep 2023021089.042.74$574
Aug 2023023280.522.67$620
Jul 2023023374.852.64$616
Jun 2023026268.962.26$592
May 2023034270.622.23$762
Apr 2023044278.122.24$989
Mar 2023041572.852.39$993
Feb 2023030275.112.47$745
Jan 2023035876.533.39$1,213
Dec 2022035876.415.73$2,051
Nov 2022050685.005.65$2,857
Oct 2022048887.185.86$2,862
Sep 2022047684.888.16$3,886
Aug 2022051394.529.13$4,682
Jul 20220497101.587.54$3,748
Jun 20220578115.097.98$4,611
May 20220514109.378.43$4,335
Apr 20220480104.226.84$3,282
Mar 20220358108.885.08$1,817
Feb 2022027291.054.86$1,322
Jan 2022037581.844.54$1,702
Dec 2021045371.323.90$1,766
Nov 2021045277.435.24$2,367
Oct 2021043779.795.71$2,497
Sep 2021012869.865.35$685
Aug 2021019366.024.22$815
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 2020078214.751.80$1,411
Mar 2020071230.341.86$1,322
Feb 2020063649.881.98$1,260
Jan 2020082357.252.09$1,724
Dec 2019092559.012.30$2,132
Nov 2019096255.302.75$2,646
Oct 2019074253.472.42$1,795
Sep 2019057855.052.66$1,536
Aug 2019065453.112.30$1,507
Jul 2019062456.272.46$1,535
Jun 2019059152.782.49$1,472
May 2019067958.482.74$1,861
Apr 2019048862.632.75$1,342
Mar 2019068456.803.06$2,094
Feb 2019070450.852.79$1,966
Jan 2019091746.033.23$2,960
Dec 2018088446.594.19$3,700
Nov 2018097452.934.24$4,127
Oct 201801,04761.443.40$3,558
Sep 201801,07259.543.11$3,332
Aug 2018060559.403.07$1,855
Jul 2018070565.142.93$2,067
Jun 2018070160.183.08$2,157
May 2018077965.382.90$2,260
Apr 2018098863.842.90$2,866
Mar 201801,04461.222.79$2,909
Feb 2018095061.782.77$2,628
Jan 2018097662.874.01$3,913
Dec 201701,00957.272.92$2,948
Nov 2017095655.423.12$2,981
Oct 201701,22949.292.98$3,667
Sep 2017095647.523.09$2,951
Aug 2017092045.373.00$2,764
Jul 2017091243.873.09$2,816
Jun 2017089642.493.09$2,766
May 201701,00245.373.26$3,270
Apr 2017099747.933.21$3,202
Mar 2017087646.772.98$2,614
Feb 201701,01950.452.95$3,009
Jan 201701,12149.413.42$3,832
Dec 201601,36848.763.72$5,093
Nov 2016083742.492.64$2,213
Oct 2016098846.193.09$3,053
Sep 2016085741.553.10$2,657
Aug 201601,06041.442.92$3,100
Jul 201601,09941.622.92$3,214
Jun 201601,11445.352.69$2,992
May 201601,09742.521.99$2,184
Apr 201601,06836.561.99$2,126
Mar 201601,08833.011.79$1,952
Feb 201601,03726.472.06$2,140
Jan 201601,15627.352.36$2,733
Dec 201501,23132.362.00$2,464
Nov 2015096738.792.17$2,096
Oct 201501,08643.552.43$2,635
Sep 201501,03842.992.76$2,863
Aug 201501,17040.162.87$3,361
Jul 201501,40948.152.95$4,150
Jun 201501,21456.152.88$3,500
May 201501,18455.212.96$3,499
Apr 201501,67349.822.71$4,528
Mar 201501,03642.892.93$3,040
Feb 2015098244.662.98$2,923
Jan 201501,36643.433.10$4,235
Dec 2014088454.693.59$3,175
Nov 2014096670.464.25$4,107
Oct 2014057278.303.90$2,231
Sep 201401,07186.164.05$4,333
Aug 201401,19389.394.04$4,814
Jul 201401,13996.564.18$4,761
Jun 201401,08398.164.74$5,130
May 201401,14894.734.73$5,426
Apr 201401,04895.944.81$5,040
Mar 201401,10695.895.06$5,593
Feb 201401,23797.406.19$7,660
Jan 201401,44890.404.86$7,038
Dec 201301,42691.824.35$6,209
Nov 201301,48188.853.74$5,536
Oct 201301,86597.423.78$7,049
Sep 20130430104.113.72$1,599
Aug 201301,041104.253.52$3,667
Jul 201301,020102.523.72$3,792
Jun 2013099994.403.93$3,929
May 201301,44894.834.15$6,008
Apr 201301,49593.964.28$6,402
Mar 201301,50093.623.91$5,869
Feb 201301,46591.233.42$5,010
Jan 201301,54591.603.42$5,284
Dec 201201,43886.773.42$4,918
Nov 201201,57386.953.62$5,702
Oct 201201,54289.383.40$5,242
Sep 201201,61994.672.92$4,725
Aug 201201,58292.662.91$4,601
Jul 201201,59685.133.02$4,821
Jun 201201,62679.822.52$4,096
May 201201,65491.612.49$4,116
Apr 201201,626101.652.00$3,247
Mar 201201,711105.052.22$3,802
Feb 201201,607101.102.57$4,130
Jan 201201,70198.092.73$4,651
Dec 201101,70596.873.24$5,524
Nov 201101,72395.723.31$5,705
Oct 201101,73384.983.65$6,323
Sep 201101,79183.623.99$7,139
Aug 201101,90083.404.15$7,884
Jul 201101,92794.144.52$8,705
Jun 201101,89192.904.64$8,774
May 201102,02498.134.40$8,915
Apr 201101,580105.964.33$6,847
Mar 201101,92396.364.06$7,802
Feb 201101,76185.644.18$7,361
Jan 201102,01186.504.59$9,228
Dec 201001,95585.734.35$8,500
Nov 201002,01880.843.80$7,659
Oct 201002,02078.103.51$7,088
Sep 201001,94472.633.98$7,736
Aug 201002,09673.684.42$9,263
Jul 201002,19172.554.74$10,378
Jun 201001,93170.364.91$9,482
May 201002,10771.124.24$8,924
Apr 201001,86481.694.12$7,685
Mar 201002,30178.394.39$10,098
Feb 201001,62073.585.44$8,817
Jan 201002,31474.365.96$13,801
Dec 200902,10371.445.48$11,532
Nov 200902,22374.593.75$8,340
Oct 200902,38272.544.11$9,791
Sep 200902,27265.543.06$6,963
Aug 200902,32967.423.22$7,496
Jul 200902,48761.133.46$8,616
Jun 200902,44366.163.90$9,515
May 200902,67754.743.93$10,509
Apr 200902,55146.773.59$9,152
Mar 200902,63742.144.06$10,704
Feb 200902,42232.814.63$11,221
Jan 200902,78135.865.37$14,937
Dec 200802,81137.105.98$16,802
Nov 200802,80455.496.86$19,236
Oct 200803,27375.246.92$22,656
Sep 200801,770101.767.88$13,942
Aug 200803,073114.228.48$26,068
Jul 200802,988131.0811.39$34,032
Jun 200802,830131.3313.03$36,882
May 200803,019123.1711.57$34,943
Apr 200803,034110.3110.45$31,720
Mar 200803,207101.909.66$30,993
Feb 200803,04492.538.77$26,698
Jan 200803,47790.388.21$28,531
Dec 200702,91688.337.30$21,293
Nov 200703,15591.677.29$23,005
Oct 200703,27282.856.92$22,649
Sep 200702,97475.846.24$18,570
Aug 200703,32869.066.39$21,259
Jul 200703,41770.906.39$21,828
Jun 200703,37062.007.55$25,438
May 200703,29158.747.85$25,822
Apr 200703,05959.617.81$23,876
Mar 200703,34456.927.30$24,418
Feb 200702,88755.108.22$23,720
Jan 200703,62150.306.73$24,358
Dec 200603,80656.656.92$26,332
Nov 200603,45954.207.62$26,349
Oct 200603,69654.906.01$22,227
Sep 200603,62660.085.04$18,265
Aug 200604,07668.717.34$29,918
Jul 200604,08769.376.34$25,923
Jun 200604,23766.286.38$27,049
May 200604,38466.016.42$28,167
Apr 200604,32364.397.36$31,819
Mar 200604,48156.707.08$31,739
Feb 200604,00357.597.75$31,028
Jan 200604,64360.598.93$41,477
Dec 200504,79954.9413.42$64,381
Nov 200504,43654.6910.59$46,970
Oct 200505,18658.3413.80$71,545
Sep 200504,63161.4512.08$55,938
Aug 200505,70461.519.80$55,881
Jul 200504,89255.697.84$38,371
Jun 200505,24152.337.38$38,684
May 200505,74045.226.65$38,178
Apr 200506,31949.207.36$46,511
Mar 200507,29650.377.15$52,202
Feb 200507,64345.226.31$48,242
Jan 200506,11543.166.32$38,660
Dec 200406,62339.866.75$44,712
Nov 200406,14245.286.33$38,881
Oct 200406,64149.706.52$43,267
Sep 200406,44943.245.28$34,076
Aug 200407,69042.375.55$42,685
Jul 200407,63038.286.08$46,422
Jun 200407,98836.106.43$51,387
May 200408,93537.486.49$58,029
Apr 200409,51234.475.86$55,726
Mar 2004010,59534.365.53$58,592
Feb 20041410,69932.455.51$59,402
Jan 20041412,98132.036.30$82,224
Dec 2003014,71030.266.30$92,697
Nov 2003015,68528.804.60$72,075
Oct 2003018,78628.174.76$89,415
Sep 2003015,34726.314.75$72,888
Aug 20030029.765.13$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   16 Mcf  × $  2.87 =        $46

────────────────────────────────────────────────────
Month total                                      $46

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/199337 is the state's own key, not one this site invented.