MUDGE

Operated by CONCHO OILFIELD SERV & OPER CO. (P-5 170164) in the SHAJUMAR (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 199589District 7CField 82603333GasSaveExport
Value, all time
$1.5 M
Oct 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
272
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 22 leases and 22 wells, and the rule below applies to all of them.

Discovered
1963-07-12
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 320 acres. The field rule took effect on 1986-02-01.

The Commission's schedule remark for this field reads: OKIE CRUDE COMPANY REQUEST

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction248,957 Mcf$1,455,780
Total$1,455,780

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5287, -99.8904. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52875, -99.89036 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
1,605 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 1,605 ft.

Completions filed
Oct 2003
1 of 1 wells

1 well

42-2673039641,605 ftOct 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (272)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

272 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 20183059.403.07$92
Jul 20182965.142.93$85
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 20189363.842.90$270
Mar 201814261.222.79$396
Feb 201814961.782.77$412
Jan 2018062.874.01$0
Dec 20178057.272.92$234
Nov 20179455.423.12$293
Oct 201715549.292.98$462
Sep 201715047.523.09$463
Aug 201714945.373.00$448
Jul 201714943.873.09$460
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 201710746.772.98$319
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 20167048.763.72$261
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 20163241.553.10$99
Aug 20166141.442.92$178
Jul 20169341.622.92$272
Jun 20163545.352.69$94
May 201613542.521.99$269
Apr 201638636.561.99$769
Mar 201650633.011.79$908
Feb 201650026.472.06$1,032
Jan 201617627.352.36$416
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 20157843.552.43$189
Sep 201521642.992.76$596
Aug 201522040.162.87$632
Jul 201525148.152.95$739
Jun 201526356.152.88$758
May 201537055.212.96$1,094
Apr 201527849.822.71$752
Mar 201524342.892.93$713
Feb 201529544.662.98$878
Jan 201515443.433.10$478
Dec 201432354.693.59$1,160
Nov 201425470.464.25$1,080
Oct 201431178.303.90$1,213
Sep 201428586.164.05$1,153
Aug 201420489.394.04$823
Jul 201433996.564.18$1,417
Jun 201421998.164.74$1,037
May 201428794.734.73$1,357
Apr 201434795.944.81$1,669
Mar 201429795.895.06$1,502
Feb 20149497.406.19$582
Jan 20142490.404.86$117
Dec 201314091.824.35$610
Nov 201341188.853.74$1,536
Oct 201337597.423.78$1,417
Sep 2013403104.113.72$1,498
Aug 2013457104.253.52$1,610
Jul 2013524102.523.72$1,948
Jun 201344094.403.93$1,731
May 201356994.834.15$2,361
Apr 201362193.964.28$2,659
Mar 201358093.623.91$2,269
Feb 201358491.233.42$1,997
Jan 201365391.603.42$2,233
Dec 201263286.773.42$2,162
Nov 201270186.953.62$2,541
Oct 201268889.383.40$2,339
Sep 201270294.672.92$2,049
Aug 201277592.662.91$2,254
Jul 201282185.133.02$2,480
Jun 201283579.822.52$2,103
May 201262391.612.49$1,550
Apr 2012883101.652.00$1,763
Mar 2012905105.052.22$2,011
Feb 2012815101.102.57$2,095
Jan 201291498.092.73$2,499
Dec 201181896.873.24$2,650
Nov 201187695.723.31$2,901
Oct 201196684.983.65$3,524
Sep 201193383.623.99$3,719
Aug 20111,08283.404.15$4,490
Jul 201158494.144.52$2,638
Jun 201153292.904.64$2,468
May 201161198.134.40$2,691
Apr 2011791105.964.33$3,428
Mar 20111,08096.364.06$4,382
Feb 201192085.644.18$3,846
Jan 20111,02486.504.59$4,699
Dec 20101,12285.734.35$4,878
Nov 20101,16880.843.80$4,433
Oct 20101,19978.103.51$4,207
Sep 20101,09372.633.98$4,350
Aug 201077373.684.42$3,416
Jul 201088372.554.74$4,182
Jun 201088270.364.91$4,331
May 201092271.124.24$3,905
Apr 201092281.694.12$3,801
Mar 20101,01178.394.39$4,437
Feb 20101,02373.585.44$5,568
Jan 20101,04974.365.96$6,256
Dec 20091,16071.445.48$6,361
Nov 20091,13874.593.75$4,269
Oct 20091,19372.544.11$4,904
Sep 20091,22965.543.06$3,767
Aug 20091,32567.423.22$4,265
Jul 200982061.133.46$2,841
Jun 20091,22766.163.90$4,779
May 20091,42954.743.93$5,610
Apr 20091,29546.773.59$4,646
Mar 200965442.144.06$2,655
Feb 200912932.814.63$598
Jan 200972535.865.37$3,894
Dec 200845537.105.98$2,720
Nov 200854355.496.86$3,725
Oct 200856675.246.92$3,918
Sep 2008536101.767.88$4,222
Aug 2008534114.228.48$4,530
Jul 2008449131.0811.39$5,114
Jun 2008588131.3313.03$7,663
May 2008538123.1711.57$6,227
Apr 2008431110.3110.45$4,506
Mar 2008655101.909.66$6,330
Feb 200864092.538.77$5,613
Jan 200858690.388.21$4,809
Dec 200730988.337.30$2,256
Nov 200749291.677.29$3,588
Oct 200751582.856.92$3,565
Sep 200749375.846.24$3,078
Aug 200757669.066.39$3,679
Jul 200758170.906.39$3,711
Jun 200756862.007.55$4,288
May 200760258.747.85$4,723
Apr 200755059.617.81$4,293
Mar 200748456.927.30$3,534
Feb 200748455.108.22$3,977
Jan 200751250.306.73$3,444
Dec 200652156.656.92$3,605
Nov 200654354.207.62$4,136
Oct 200657954.906.01$3,482
Sep 200672760.085.04$3,662
Aug 200681368.717.34$5,967
Jul 200685669.376.34$5,429
Jun 200684266.286.38$5,375
May 200685566.016.42$5,493
Apr 200689864.397.36$6,610
Mar 200674556.707.08$5,277
Feb 200684157.597.75$6,519
Jan 200675960.598.93$6,780
Dec 200572854.9413.42$9,766
Nov 20051,10054.6910.59$11,647
Oct 200582858.3413.80$11,423
Sep 200585161.4512.08$10,279
Aug 200591461.519.80$8,954
Jul 200555055.697.84$4,314
Jun 20054652.337.38$340
May 20053,20945.226.65$21,344
Apr 20054,47949.207.36$32,968
Mar 20056,70050.377.15$47,938
Feb 20056,47345.226.31$40,857
Jan 20058,73043.166.32$55,193
Dec 200411,35939.866.75$76,686
Nov 20047,31745.286.33$46,320
Oct 200410,52549.706.52$68,571
Sep 200410,84843.245.28$57,320
Aug 20049,15742.375.55$50,827
Jul 20046,87438.286.08$41,823
Jun 20047,70936.106.43$49,592
May 200411,67437.486.49$75,818
Apr 200410,62434.475.86$62,240
Mar 200411,36134.365.53$62,828
Feb 200411,91432.455.51$65,642
Jan 200413,74132.036.30$86,563
Dec 200311,26830.266.30$71,007
Nov 2003028.804.60$0
Oct 2003028.174.76$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2018 — as filed, then multipliedworked
Gas                   30 Mcf  × $  3.07 =        $92

────────────────────────────────────────────────────
Month total                                      $92

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/199589 is the state's own key, not one this site invented.