Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 199851District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.9 M
Oct 2003 – May 2026
Value, last 12 filed months
$84 k
at the published price for each month
Months reported
272
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-11-19154549
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition237 bbl$12,573
GasProduction1,008,162 Mcf$4,930,610
Total$4,943,184

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6492, -100.8902. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.64921, -100.89018 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,511 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,511 ft.

Completions filed
Oct 2003
1 of 1 wells

1 well

42-4353629338,511 ftOct 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (272)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

272 months

May 202601,742106.413.05$5,306
Apr 202601,72998.932.87$4,962
Mar 202601,75389.753.15$5,521
Feb 202601,56963.503.75$5,884
Jan 202601,91559.138.00$15,316
Dec 202501,78056.664.41$7,856
Nov 202501,85658.593.93$7,287
Oct 202501,94659.383.30$6,431
Sep 202501,64362.743.08$5,055
Aug 202501,97063.933.01$5,939
Jul 202502,00166.743.32$6,634
Jun 202502,59866.483.13$8,128
May 202501,33660.553.23$4,318
Apr 2025381,75862.363.54$8,598
Mar 202501,82067.704.27$7,768
Feb 202501,61570.884.34$7,010
Jan 202501,74374.324.28$7,458
Dec 202401,85268.993.12$5,781
Nov 202401,81869.052.20$3,997
Oct 202401,95971.372.28$4,469
Sep 202401,88569.612.36$4,457
Aug 202401,96775.632.06$4,059
Jul 202401,87979.932.15$4,033
Jun 202401,75078.082.63$4,609
May 202401,89578.812.20$4,166
Apr 202401,86384.451.66$3,091
Mar 202401,91380.301.55$2,956
Feb 202401,81176.091.78$3,230
Jan 202401,92373.023.30$6,341
Dec 202301,91571.262.61$5,000
Nov 202301,87777.892.81$5,270
Oct 202302,00885.443.09$6,199
Sep 202302,08689.042.74$5,705
Aug 202302,03380.522.67$5,434
Jul 202302,05274.852.64$5,421
Jun 202301,95168.962.26$4,406
May 202301,94570.622.23$4,332
Apr 202301,96578.122.24$4,397
Mar 202302,02572.852.39$4,846
Feb 202301,86275.112.47$4,591
Jan 202302,27776.533.39$7,714
Dec 202202,04376.415.73$11,705
Nov 202202,05985.005.65$11,626
Oct 202202,18887.185.86$12,830
Sep 202202,16784.888.16$17,691
Aug 202202,38894.529.13$21,796
Jul 202202,381101.587.54$17,958
Jun 202202,314115.097.98$18,459
May 202202,933109.378.43$24,734
Apr 202202,306104.226.84$15,768
Mar 202202,343108.885.08$11,894
Feb 202201,86391.054.86$9,052
Jan 202202,39181.844.54$10,850
Dec 202102,30671.323.90$8,991
Nov 202102,50177.435.24$13,097
Oct 202102,94779.795.71$16,839
Sep 202102,89069.865.35$15,464
Aug 202103,00166.024.22$12,666
Jul 202103,07570.783.98$12,245
Jun 202102,98469.493.38$10,088
May 202103,04563.483.02$9,189
Apr 202102,99760.362.76$8,267
Mar 2021303,21761.302.72$10,579
Feb 202103,15257.805.55$17,487
Jan 202103,02650.412.81$8,504
Dec 202003,08044.642.68$8,240
Nov 202003,02338.772.71$8,182
Oct 202003,11036.972.48$7,708
Sep 202002,83737.091.99$5,649
Aug 202002,86739.982.39$6,838
Jul 202002,91038.371.83$5,311
Jun 202002,83334.901.69$4,789
May 202002,93216.921.81$5,321
Apr 202002,82614.751.80$5,099
Mar 202003,16230.341.86$5,869
Feb 202003,05249.881.98$6,045
Jan 202003,35457.252.09$7,026
Dec 201903,17559.012.30$7,316
Nov 201903,06155.302.75$8,420
Oct 201903,29353.472.42$7,964
Sep 201903,36255.052.66$8,934
Aug 201903,38053.112.30$7,789
Jul 201903,02556.272.46$7,442
Jun 201902,87752.782.49$7,167
May 201902,79558.482.74$7,659
Apr 201902,93762.632.75$8,079
Mar 201903,09556.803.06$9,477
Feb 201902,78150.852.79$7,765
Jan 201903,13246.033.23$10,111
Dec 201803,06146.594.19$12,812
Nov 2018182,70652.934.24$12,419
Oct 201803,11961.443.40$10,599
Sep 201802,88159.543.11$8,954
Aug 201803,19659.403.07$9,801
Jul 201803,26065.142.93$9,558
Jun 201803,13660.183.08$9,649
May 201803,23865.382.90$9,393
Apr 201803,16563.842.90$9,181
Mar 201803,19361.222.79$8,898
Feb 201802,96161.782.77$8,190
Jan 201803,25762.874.01$13,058
Dec 201703,14957.272.92$9,200
Nov 201703,05255.423.12$9,517
Oct 2017173,22749.292.98$10,466
Sep 201703,18347.523.09$9,827
Aug 201703,29045.373.00$9,884
Jul 201703,34443.873.09$10,324
Jun 201703,25742.493.09$10,055
May 201703,13345.373.26$10,224
Apr 201703,11947.933.21$10,017
Mar 201703,31046.772.98$9,876
Feb 201703,05550.452.95$9,020
Jan 201703,38549.413.42$11,573
Dec 201603,36648.763.72$12,531
Nov 201603,17742.492.64$8,401
Oct 2016483,35346.193.09$12,579
Sep 201603,21241.553.10$9,959
Aug 201603,25241.442.92$9,510
Jul 201603,18541.622.92$9,314
Jun 201603,15645.352.69$8,476
May 201603,31742.521.99$6,604
Apr 201613,20436.561.99$6,416
Mar 201603,32533.011.79$5,965
Feb 201603,11326.472.06$6,424
Jan 201603,30027.352.36$7,802
Dec 201503,25832.362.00$6,521
Nov 201503,29138.792.17$7,133
Oct 201503,59043.552.43$8,711
Sep 201503,24842.992.76$8,959
Aug 201503,25340.162.87$9,344
Jul 2015763,28848.152.95$13,343
Jun 201503,05156.152.88$8,796
May 201503,22455.212.96$9,528
Apr 201503,13749.822.71$8,491
Mar 201543,33542.892.93$9,959
Feb 201503,03744.662.98$9,039
Jan 201503,37743.433.10$10,471
Dec 201403,41554.693.59$12,264
Nov 201403,25470.464.25$13,835
Oct 201403,43678.303.90$13,404
Sep 201403,34286.164.05$13,520
Aug 201403,31189.394.04$13,360
Jul 201413,43096.564.18$14,433
Jun 201403,31498.164.74$15,698
May 201403,43494.734.73$16,231
Apr 201403,38995.944.81$16,298
Mar 201403,30495.895.06$16,708
Feb 201403,12297.406.19$19,331
Jan 201403,39690.404.86$16,507
Dec 201303,51891.824.35$15,319
Nov 201303,32588.853.74$12,430
Oct 201303,26397.423.78$12,332
Sep 201303,304104.113.72$12,283
Aug 201303,421104.253.52$12,051
Jul 201303,255102.523.72$12,101
Jun 201303,23694.403.93$12,729
May 201303,28694.834.15$13,634
Apr 201303,42593.964.28$14,668
Mar 201303,53993.623.91$13,848
Feb 201303,41891.233.42$11,689
Jan 201303,74291.603.42$12,797
Dec 201203,68386.773.42$12,596
Nov 201203,69986.953.62$13,409
Oct 201213,66089.383.40$12,532
Sep 201203,60494.672.92$10,518
Aug 201203,81392.662.91$11,089
Jul 201203,81485.133.02$11,521
Jun 201203,76079.822.52$9,472
May 201203,72091.612.49$9,257
Apr 201203,584101.652.00$7,157
Mar 201203,766105.052.22$8,368
Feb 201233,422101.102.57$9,099
Jan 201203,67698.092.73$10,050
Dec 201103,81096.873.24$12,343
Nov 201103,71595.723.31$12,301
Oct 201103,87484.983.65$14,134
Sep 201103,85483.623.99$15,361
Aug 201104,06783.404.15$16,875
Jul 201103,99194.144.52$18,028
Jun 201103,62692.904.64$16,824
May 201103,80698.134.40$16,765
Apr 201103,839105.964.33$16,635
Mar 201103,98096.364.06$16,148
Feb 201103,62985.644.18$15,169
Jan 201104,04386.504.59$18,552
Dec 201004,32685.734.35$18,808
Nov 201004,00180.843.80$15,185
Oct 201004,11178.103.51$14,425
Sep 201004,02072.633.98$15,997
Aug 201004,13973.684.42$18,292
Jul 201003,75672.554.74$17,790
Jun 201003,96470.364.91$19,465
May 201004,06671.124.24$17,220
Apr 201003,96081.694.12$16,326
Mar 201004,23778.394.39$18,595
Feb 201003,82673.585.44$20,822
Jan 201003,96574.365.96$23,648
Dec 200903,96271.445.48$21,727
Nov 200903,90874.593.75$14,661
Oct 200904,21272.544.11$17,312
Sep 200904,10465.543.06$12,578
Aug 200904,26367.423.22$13,720
Jul 200904,27161.133.46$14,797
Jun 200903,94066.163.90$15,346
May 200904,23454.743.93$16,622
Apr 200904,01146.773.59$14,389
Mar 200904,01342.144.06$16,289
Feb 200903,70232.814.63$17,151
Jan 200903,85435.865.37$20,700
Dec 200804,41937.105.98$26,413
Nov 200804,11555.496.86$28,230
Oct 200804,41975.246.92$30,588
Sep 200804,305101.767.88$33,911
Aug 200804,367114.228.48$37,045
Jul 200804,494131.0811.39$51,184
Jun 200804,619131.3313.03$60,198
May 200804,775123.1711.57$55,267
Apr 200804,644110.3110.45$48,552
Mar 200804,617101.909.66$44,619
Feb 200804,38392.538.77$38,441
Jan 200804,57890.388.21$37,566
Dec 200704,68688.337.30$34,217
Nov 200704,59891.677.29$33,527
Oct 200704,82082.856.92$33,364
Sep 200704,78575.846.24$29,878
Aug 200704,99169.066.39$31,882
Jul 200705,02070.906.39$32,067
Jun 200704,69862.007.55$35,463
May 200704,31658.747.85$33,865
Apr 200704,44259.617.81$34,671
Mar 200705,11356.927.30$37,335
Feb 200703,46255.108.22$28,444
Jan 200703,67850.306.73$24,741
Dec 200603,93856.656.92$27,245
Nov 200603,78354.207.62$28,817
Oct 200603,88054.906.01$23,334
Sep 200603,86460.085.04$19,464
Aug 200604,28768.717.34$31,466
Jul 200604,14069.376.34$26,259
Jun 200604,23766.286.38$27,049
May 200604,80766.016.42$30,885
Apr 200604,57764.397.36$33,689
Mar 200604,78656.707.08$33,899
Feb 200604,48257.597.75$34,741
Jan 200605,43160.598.93$48,517
Dec 200505,22854.9413.42$70,136
Nov 200505,20454.6910.59$55,102
Oct 200505,29358.3413.80$73,021
Sep 200504,81761.4512.08$58,185
Aug 200505,21261.519.80$51,061
Jul 200505,61755.697.84$44,058
Jun 200505,70552.337.38$42,109
May 200506,16145.226.65$40,978
Apr 200505,91349.207.36$43,523
Mar 200506,41950.377.15$45,927
Feb 200506,87645.226.31$43,401
Jan 200508,29043.166.32$52,411
Dec 200406,97139.866.75$47,062
Nov 200406,33645.286.33$40,110
Oct 200407,36249.706.52$47,964
Sep 200407,22343.245.28$38,166
Aug 200407,25142.375.55$40,248
Jul 200408,50138.286.08$51,722
Jun 200407,63236.106.43$49,097
May 200408,46537.486.49$54,977
Apr 200408,75234.475.86$51,273
Mar 200409,52634.365.53$52,680
Feb 200409,51832.455.51$52,441
Jan 2004011,49132.036.30$72,389
Dec 2003012,02530.266.30$75,777
Nov 2003014,51428.804.60$66,694
Oct 2003016,71828.174.76$79,572

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,742 Mcf  × $  3.05 =     $5,306

────────────────────────────────────────────────────
Month total                                   $5,306

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/199851 is the state's own key, not one this site invented.