J. WILEY GREEN -A-

Operated by COMPASS OPERATING, L.L.C. (P-5 169750) in the SUSAN PEAK (CISCO CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 200189District 7CField 87334142GasSaveExport
Value, all time
$1.5 M
Jul 2003 – Apr 2018
Value, last 12 filed months
$43
at the published price for each month
Months reported
178
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 33 leases and 57 wells, and the rule below applies to all of them.

Discovered
1948-12-10
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 09/01/97.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction248,901 Mcf$1,490,908
Total$1,490,908

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.2664, -100.2977. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.26645, -100.29767 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,912 ft
1 wells filed one
Completion to plug
14.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,912 ft.

Completions filed
Oct 2003
1 of 1 wells
Plug dates filed
Apr 2018
1 of 1 wells

Last completion to plug: a median of 14.5 years across the 1 well that filed both dates, with the middle half between 14.5 years and 14.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4510078124,912 ftOct 2003Apr 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (178)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

178 months

Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017357.272.92$9
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 20171143.873.09$34
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 201733149.413.42$1,132
Dec 201634048.763.72$1,266
Nov 201634242.492.64$904
Oct 201635546.193.09$1,097
Sep 201627941.553.10$865
Aug 201630541.442.92$892
Jul 201634141.622.92$997
Jun 201627845.352.69$747
May 201627542.521.99$548
Apr 201631036.561.99$617
Mar 201623633.011.79$423
Feb 201628526.472.06$588
Jan 201638327.352.36$906
Dec 201542732.362.00$855
Nov 201532338.792.17$700
Oct 201532943.552.43$798
Sep 201530842.992.76$850
Aug 201532240.162.87$925
Jul 201533548.152.95$987
Jun 201531756.152.88$914
May 201532055.212.96$946
Apr 201532949.822.71$890
Mar 201534242.892.93$1,004
Feb 201529344.662.98$872
Jan 201533543.433.10$1,039
Dec 201437854.693.59$1,358
Nov 201437670.464.25$1,599
Oct 201445878.303.90$1,787
Sep 201447086.164.05$1,901
Aug 201447989.394.04$1,933
Jul 201462196.564.18$2,596
Jun 201449098.164.74$2,321
May 201447194.734.73$2,226
Apr 201438395.944.81$1,842
Mar 201431195.895.06$1,573
Feb 201435897.406.19$2,217
Jan 201443890.404.86$2,129
Dec 201347191.824.35$2,051
Nov 201340288.853.74$1,503
Oct 201342397.423.78$1,599
Sep 2013540104.113.72$2,008
Aug 2013410104.253.52$1,444
Jul 2013540102.523.72$2,008
Jun 201356794.403.93$2,230
May 201340194.834.15$1,664
Apr 201353693.964.28$2,295
Mar 201335493.623.91$1,385
Feb 201349991.233.42$1,707
Jan 201353691.603.42$1,833
Dec 201248186.773.42$1,645
Nov 201250286.953.62$1,820
Oct 201260589.383.40$2,057
Sep 201247194.672.92$1,375
Aug 201299492.662.91$2,891
Jul 20121,07385.133.02$3,241
Jun 201294979.822.52$2,391
May 20121,16991.612.49$2,909
Apr 20121,186101.652.00$2,368
Mar 20121,191105.052.22$2,647
Feb 2012999101.102.57$2,568
Jan 201295098.092.73$2,597
Dec 201197096.873.24$3,143
Nov 201195495.723.31$3,159
Oct 201126884.983.65$978
Sep 20111,08583.623.99$4,325
Aug 20111,10883.404.15$4,597
Jul 20111,07694.144.52$4,861
Jun 20111,10892.904.64$5,141
May 20111,17898.134.40$5,189
Apr 20111,053105.964.33$4,563
Mar 20111,23996.364.06$5,027
Feb 201195185.644.18$3,975
Jan 20111,21786.504.59$5,585
Dec 20101,68385.734.35$7,317
Nov 20101,67180.843.80$6,342
Oct 20101,74178.103.51$6,109
Sep 201077372.633.98$3,076
Aug 20101,28873.684.42$5,692
Jul 20101,73172.554.74$8,199
Jun 20101,68370.364.91$8,264
May 20101,63171.124.24$6,908
Apr 20101,76081.694.12$7,256
Mar 20101,88478.394.39$8,268
Feb 20101,60173.585.44$8,713
Jan 20101,60074.365.96$9,543
Dec 20091,52471.445.48$8,357
Nov 20091,40774.593.75$5,278
Oct 20091,51072.544.11$6,206
Sep 20091,57565.543.06$4,827
Aug 20091,44667.423.22$4,654
Jul 20091,52761.133.46$5,290
Jun 20091,50966.163.90$5,878
May 20091,52254.743.93$5,975
Apr 20091,36946.773.59$4,911
Mar 20091,48242.144.06$6,015
Feb 20091,36232.814.63$6,310
Jan 20091,33435.865.37$7,165
Dec 20081,51137.105.98$9,031
Nov 20081,79155.496.86$12,287
Oct 200872575.246.92$5,018
Sep 20081,290101.767.88$10,161
Aug 20081,719114.228.48$14,582
Jul 20081,660131.0811.39$18,906
Jun 20081,517131.3313.03$19,771
May 20081,715123.1711.57$19,850
Apr 20081,622110.3110.45$16,958
Mar 20081,732101.909.66$16,738
Feb 20081,83992.538.77$16,129
Jan 20081,87790.388.21$15,402
Dec 20072,14388.337.30$15,648
Nov 20072,12491.677.29$15,488
Oct 20072,15082.856.92$14,882
Sep 20072,18575.846.24$13,643
Aug 20071,92669.066.39$12,303
Jul 20071,75270.906.39$11,192
Jun 20071,13762.007.55$8,583
May 20072,04058.747.85$16,006
Apr 20071,83659.617.81$14,330
Mar 20071,98256.927.30$14,473
Feb 200793555.108.22$7,682
Jan 200781450.306.73$5,476
Dec 20061,92856.656.92$13,339
Nov 20061,81154.207.62$13,795
Oct 20062,09554.906.01$12,599
Sep 20062,12660.085.04$10,709
Aug 20062,06268.717.34$15,135
Jul 20062,08369.376.34$13,212
Jun 20061,95566.286.38$12,480
May 20061,93066.016.42$12,400
Apr 20061,96064.397.36$14,427
Mar 20062,04756.707.08$14,499
Feb 20064,43457.597.75$34,368
Jan 20062,02360.598.93$18,072
Dec 20051,59354.9413.42$21,371
Nov 200597454.6910.59$10,313
Oct 20051,00258.3413.80$13,823
Sep 200561261.4512.08$7,392
Aug 20052,81261.519.80$27,549
Jul 20052,90855.697.84$22,809
Jun 20053,10252.337.38$22,896
May 20054,09845.226.65$27,256
Apr 20054,04249.207.36$29,751
Mar 20054,08550.377.15$29,228
Feb 20054,01745.226.31$25,355
Jan 20054,06143.166.32$25,674
Dec 20043,69739.866.75$24,959
Nov 20044,29245.286.33$27,170
Oct 20043,37649.706.52$21,995
Sep 20045,20543.245.28$27,503
Aug 20045,47942.375.55$30,412
Jul 20045,40038.286.08$32,855
Jun 20045,37236.106.43$34,558
May 20045,53037.486.49$35,915
Apr 20044,92134.475.86$28,829
Mar 20044,50734.365.53$24,924
Feb 20044,80632.455.51$26,479
Jan 20044,07632.036.30$25,677
Dec 20034,96130.266.30$31,262
Nov 20034,53528.804.60$20,839
Oct 20034,60628.174.76$21,923
Sep 2003026.314.75$0
Aug 2003029.765.13$0
Jul 2003029.415.17$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2017 — as filed, then multipliedworked
Gas                    3 Mcf  × $  2.92 =         $9

────────────────────────────────────────────────────
Month total                                       $9

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/200189 is the state's own key, not one this site invented.