LANCASTER 154

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 200521District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$324 k
Jul 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
275
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-07-22153643
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition197 bbl$16,238
GasProduction49,119 Mcf$307,820
Total$324,058

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6537, -100.7070. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.65366, -100.70704 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,655 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,655 ft.

Completions filed
Jul 2003
1 of 1 wells

1 well

42-4353639546,655 ftJul 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (275)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

275 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20211063.483.02$63
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150148.152.95$3
Jun 20150156.152.88$3
May 20150155.212.96$3
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20141078.303.90$78
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 2013026091.233.42$889
Jan 2013037491.603.42$1,279
Dec 20120186.773.42$3
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201205105.052.22$11
Feb 20120309101.102.57$794
Jan 20120198.092.73$3
Dec 20110096.873.24$0
Nov 20110195.723.31$3
Oct 2011015084.983.65$547
Sep 201103283.623.99$128
Aug 201108383.404.15$344
Jul 201102594.144.52$113
Jun 201103592.904.64$162
May 201104598.134.40$198
Apr 2011035105.964.33$152
Mar 201104896.364.06$195
Feb 201105285.644.18$217
Jan 201106986.504.59$317
Dec 201008385.734.35$361
Nov 201009280.843.80$349
Oct 2010011378.103.51$397
Sep 2010013072.633.98$517
Aug 2010615573.684.42$1,127
Jul 2010017472.554.74$824
Jun 2010019570.364.91$958
May 2010020671.124.24$872
Apr 2010023481.694.12$965
Mar 2010026478.394.39$1,159
Feb 2010029073.585.44$1,578
Jan 2010235674.365.96$2,272
Dec 2009034371.445.48$1,881
Nov 2009137774.593.75$1,489
Oct 2009257272.544.11$2,496
Sep 20090065.543.06$0
Aug 2009037467.423.22$1,204
Jul 2009040961.133.46$1,417
Jun 2009034466.163.90$1,340
May 2009040654.743.93$1,594
Apr 2009039146.773.59$1,403
Mar 2009040942.144.06$1,660
Feb 2009039232.814.63$1,816
Jan 2009041435.865.37$2,224
Dec 2008447637.105.98$2,994
Nov 2008047255.496.86$3,238
Oct 2008054875.246.92$3,793
Sep 20080470101.767.88$3,702
Aug 20080490114.228.48$4,157
Jul 20080517131.0811.39$5,888
Jun 20080559131.3313.03$7,285
May 20080607123.1711.57$7,026
Apr 20080614110.3110.45$6,419
Mar 20080659101.909.66$6,369
Feb 20084966592.538.77$10,366
Jan 20083073390.388.21$8,726
Dec 20072679988.337.30$8,131
Nov 20073884891.677.29$9,667
Oct 2007094882.856.92$6,562
Sep 20071891475.846.24$7,072
Aug 2007064869.066.39$4,139
Jul 200706670.906.39$422
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070755.108.22$58
Jan 20070050.306.73$0
Dec 20061056.656.92$57
Nov 20060054.207.62$0
Oct 200602654.906.01$156
Sep 20061260.085.04$70
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 200602466.286.38$153
May 200603766.016.42$238
Apr 200604464.397.36$324
Mar 200603856.707.08$269
Feb 2006013057.597.75$1,008
Jan 2006021160.598.93$1,885
Dec 2005032854.9413.42$4,400
Nov 2005342454.6910.59$4,654
Oct 2005034858.3413.80$4,801
Sep 2005046861.4512.08$5,653
Aug 2005051761.519.80$5,065
Jul 2005032055.697.84$2,510
Jun 2005045752.337.38$3,373
May 2005051445.226.65$3,419
Apr 2005047449.207.36$3,489
Mar 2005058350.377.15$4,171
Feb 2005066145.226.31$4,172
Jan 2005053943.166.32$3,408
Dec 2004330739.866.75$2,192
Nov 2004042545.286.33$2,690
Oct 2004071849.706.52$4,678
Sep 2004095543.245.28$5,046
Aug 2004081442.375.55$4,518
Jul 2004077238.286.08$4,697
Jun 2004049436.106.43$3,178
May 2004093437.486.49$6,066
Apr 2004390134.475.86$5,382
Mar 200401,10334.365.53$6,100
Feb 200401,16932.455.51$6,441
Jan 200441,46932.036.30$9,382
Dec 200301,56630.266.30$9,868
Nov 200341,79228.804.60$8,350
Oct 200302,08328.174.76$9,914
Sep 200303,02626.314.75$14,372
Aug 200304,08829.765.13$20,970
Jul 200301,06729.415.17$5,517

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2021 — as filed, then multipliedworked
Condensate             1 bbl  × $ 63.48 =        $63
Gas                    0 Mcf  × $  3.02 =         $0

────────────────────────────────────────────────────
Month total                                      $63

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/200521 is the state's own key, not one this site invented.