MAYER

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 200705District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$789 k
Jul 2003 – May 2026
Value, last 12 filed months
$431
at the published price for each month
Months reported
275
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-07-22153644
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition38 bbl$1,855
GasProduction145,175 Mcf$786,780
Total$788,635

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6262, -100.8881. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.62623, -100.88813 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,885 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,885 ft.

Completions filed
Jul 2003
1 of 1 wells

1 well

42-43536295458,885 ftJul 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (275)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

275 months

May 202606106.413.05$18
Apr 20260998.932.87$26
Mar 20260989.753.15$28
Feb 20260963.503.75$34
Jan 202601359.138.00$104
Dec 20250956.664.41$40
Nov 202501058.593.93$39
Oct 20250759.383.30$23
Sep 20250862.743.08$25
Aug 202501163.933.01$33
Jul 20250966.743.32$30
Jun 202501066.483.13$31
May 202501260.553.23$39
Apr 20250962.363.54$32
Mar 20250467.704.27$17
Feb 20250370.884.34$13
Jan 20250474.324.28$17
Dec 20240268.993.12$6
Nov 20240169.052.20$2
Oct 20240171.372.28$2
Sep 20240269.612.36$5
Aug 20240475.632.06$8
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240384.451.66$5
Mar 202404580.301.55$70
Feb 2024015176.091.78$269
Jan 2024016173.023.30$531
Dec 2023016471.262.61$428
Nov 2023015977.892.81$446
Oct 2023016485.443.09$506
Sep 2023015989.042.74$435
Aug 2023017180.522.67$457
Jul 2023017374.852.64$457
Jun 2023016868.962.26$379
May 2023016970.622.23$376
Apr 2023017078.122.24$380
Mar 2023017572.852.39$419
Feb 2023015175.112.47$372
Jan 2023016876.533.39$569
Dec 2022016976.415.73$968
Nov 2022016585.005.65$932
Oct 2022017387.185.86$1,014
Sep 2022012684.888.16$1,029
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220881.844.54$36
Dec 202101771.323.90$66
Nov 202101777.435.24$89
Oct 202101779.795.71$97
Sep 202101569.865.35$80
Aug 202101666.024.22$68
Jul 202101870.783.98$72
Jun 202101369.493.38$44
May 202111363.483.02$103
Apr 202101760.362.76$47
Mar 202102561.302.72$68
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 202002844.642.68$75
Nov 202007038.772.71$189
Oct 202007436.972.48$183
Sep 2020018437.091.99$366
Aug 2020024139.982.39$575
Jul 2020024238.371.83$442
Jun 2020023934.901.69$404
May 2020024616.921.81$446
Apr 2020023914.751.80$431
Mar 2020024830.341.86$460
Feb 2020023449.881.98$463
Jan 2020025357.252.09$530
Dec 2019125659.012.30$649
Nov 2019025055.302.75$688
Oct 2019126053.472.42$682
Sep 2019026655.052.66$707
Aug 2019027853.112.30$641
Jul 2019127956.272.46$743
Jun 2019027152.782.49$675
May 2019028158.482.74$770
Apr 2019230262.632.75$956
Mar 2019025756.803.06$787
Feb 2019228750.852.79$903
Jan 2019231746.033.23$1,115
Dec 2018031746.594.19$1,327
Nov 2018130652.934.24$1,350
Oct 2018032161.443.40$1,091
Sep 2018031559.543.11$979
Aug 2018032559.403.07$997
Jul 2018032365.142.93$947
Jun 2018032060.183.08$985
May 2018132965.382.90$1,020
Apr 2018131863.842.90$986
Mar 2018128461.222.79$853
Feb 2018129461.782.77$875
Jan 2018032862.874.01$1,315
Dec 2017033357.272.92$973
Nov 2017132755.423.12$1,075
Oct 2017134049.292.98$1,064
Sep 2017033647.523.09$1,037
Aug 2017134745.373.00$1,088
Jul 2017034943.873.09$1,077
Jun 2017134242.493.09$1,098
May 2017133445.373.26$1,135
Apr 2017133447.933.21$1,121
Mar 2017134346.772.98$1,070
Feb 2017131450.452.95$978
Jan 2017135049.413.42$1,246
Dec 2016135148.763.72$1,355
Nov 2016034542.492.64$912
Oct 2016135346.193.09$1,137
Sep 2016135141.553.10$1,130
Aug 2016144041.442.92$1,328
Jul 2016036741.622.92$1,073
Jun 2016135745.352.69$1,004
May 2016037042.521.99$737
Apr 2016136036.561.99$753
Mar 2016136633.011.79$690
Feb 2016033926.472.06$700
Jan 2016136927.352.36$900
Dec 2015135732.362.00$747
Nov 2015134938.792.17$795
Oct 2015135443.552.43$903
Sep 2015135542.992.76$1,022
Aug 2015136040.162.87$1,074
Jul 2015135648.152.95$1,097
Jun 2015035056.152.88$1,009
May 2015036155.212.96$1,067
Apr 2015026849.822.71$725
Mar 2015026442.892.93$775
Feb 2015030144.662.98$896
Jan 2015033843.433.10$1,048
Dec 2014032654.693.59$1,171
Nov 2014033570.464.25$1,424
Oct 2014039078.303.90$1,521
Sep 2014038586.164.05$1,557
Aug 2014038889.394.04$1,566
Jul 2014036796.564.18$1,534
Jun 2014032498.164.74$1,535
May 2014028594.734.73$1,347
Apr 2014028595.944.81$1,371
Mar 2014033995.895.06$1,714
Feb 2014031797.406.19$1,963
Jan 2014031290.404.86$1,517
Dec 2013037191.824.35$1,616
Nov 2013037388.853.74$1,394
Oct 2013043197.423.78$1,629
Sep 20130428104.113.72$1,591
Aug 20130333104.253.52$1,173
Jul 20130395102.523.72$1,469
Jun 2013036794.403.93$1,444
May 2013040394.834.15$1,672
Apr 2013041293.964.28$1,764
Mar 2013044493.623.91$1,737
Feb 2013037591.233.42$1,282
Jan 2013039991.603.42$1,365
Dec 2012041986.773.42$1,433
Nov 2012042086.953.62$1,522
Oct 2012043289.383.40$1,469
Sep 2012041894.672.92$1,220
Aug 2012043792.662.91$1,271
Jul 2012043685.133.02$1,317
Jun 2012042179.822.52$1,061
May 2012043991.612.49$1,092
Apr 20120434101.652.00$867
Mar 20120451105.052.22$1,002
Feb 20120428101.102.57$1,100
Jan 2012045698.092.73$1,247
Dec 2011046696.873.24$1,510
Nov 2011044795.723.31$1,480
Oct 2011047484.983.65$1,729
Sep 2011046483.623.99$1,849
Aug 2011048383.404.15$2,004
Jul 2011048394.144.52$2,182
Jun 2011046592.904.64$2,158
May 2011047498.134.40$2,088
Apr 20110464105.964.33$2,011
Mar 2011049096.364.06$1,988
Feb 2011043585.644.18$1,818
Jan 2011049586.504.59$2,271
Dec 2010049685.734.35$2,156
Nov 2010047980.843.80$1,818
Oct 2010047478.103.51$1,663
Sep 2010049072.633.98$1,950
Aug 2010049873.684.42$2,201
Jul 2010051672.554.74$2,444
Jun 2010050570.364.91$2,480
May 2010051871.124.24$2,194
Apr 2010047081.694.12$1,938
Mar 2010053778.394.39$2,357
Feb 2010048173.585.44$2,618
Jan 2010053574.365.96$3,191
Dec 2009054571.445.48$2,989
Nov 2009053274.593.75$1,996
Oct 2009055472.544.11$2,277
Sep 2009053665.543.06$1,643
Aug 2009055167.423.22$1,773
Jul 2009055061.133.46$1,905
Jun 2009054266.163.90$2,111
May 2009054454.743.93$2,136
Apr 2009054546.773.59$1,955
Mar 2009057542.144.06$2,334
Feb 2009053032.814.63$2,455
Jan 2009060735.865.37$3,260
Dec 2008062337.105.98$3,724
Nov 2008061355.496.86$4,205
Oct 2008055975.246.92$3,869
Sep 20080609101.767.88$4,797
Aug 20080639114.228.48$5,421
Jul 20080650131.0811.39$7,403
Jun 20080589131.3313.03$7,676
May 20080641123.1711.57$7,419
Apr 20080604110.3110.45$6,315
Mar 20080644101.909.66$6,224
Feb 2008060892.538.77$5,333
Jan 2008064090.388.21$5,252
Dec 2007064688.337.30$4,717
Nov 2007064091.677.29$4,667
Oct 2007070782.856.92$4,894
Sep 2007069975.846.24$4,365
Aug 2007072669.066.39$4,638
Jul 2007072570.906.39$4,631
Jun 2007069662.007.55$5,254
May 2007073058.747.85$5,728
Apr 2007071259.617.81$5,557
Mar 2007073556.927.30$5,367
Feb 2007068755.108.22$5,644
Jan 2007077950.306.73$5,240
Dec 2006082056.656.92$5,673
Nov 2006076854.207.62$5,850
Oct 2006076954.906.01$4,625
Sep 2006078660.085.04$3,959
Aug 2006082568.717.34$6,055
Jul 2006076869.376.34$4,871
Jun 2006072266.286.38$4,609
May 2006080066.016.42$5,140
Apr 2006072164.397.36$5,307
Mar 2006066556.707.08$4,710
Feb 2006064957.597.75$5,030
Jan 2006086360.598.93$7,709
Dec 2005098254.9413.42$13,174
Nov 200501,04754.6910.59$11,086
Oct 200501,19458.3413.80$16,472
Sep 200501,25361.4512.08$15,135
Aug 200501,33361.519.80$13,059
Jul 200501,22655.697.84$9,616
Jun 200501,33352.337.38$9,839
May 200501,34045.226.65$8,913
Apr 200501,51349.207.36$11,136
Mar 200501,34550.377.15$9,623
Feb 200501,33445.226.31$8,420
Jan 200501,51543.166.32$9,578
Dec 200401,66039.866.75$11,207
Nov 200401,48345.286.33$9,388
Oct 200401,46449.706.52$9,538
Sep 200401,50943.245.28$7,973
Aug 200401,36642.375.55$7,582
Jul 200401,53038.286.08$9,309
Jun 200401,37836.106.43$8,865
May 200401,64537.486.49$10,684
Apr 200401,93334.475.86$11,324
Mar 200401,78834.365.53$9,888
Feb 200401,74332.455.51$9,603
Jan 200402,27432.036.30$14,325
Dec 200302,99130.266.30$18,848
Nov 200304,35128.804.60$19,994
Oct 200304,03128.174.76$19,186
Sep 200305,50226.314.75$26,131
Aug 200305,31829.765.13$27,280
Jul 200305,38829.415.17$27,860

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    6 Mcf  × $  3.05 =        $18

────────────────────────────────────────────────────
Month total                                      $18

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/200705 is the state's own key, not one this site invented.