THOMAS, J. K.

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CLEAR FORK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 200854District 7CField 67995400CondensateGasSaveExport
Value, all time
$64 k
Jul 2003 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
275
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 44 leases and 61 wells, and the rule below applies to all of them.

Discovered
1971-03-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: PER OPERATOR REQUEST

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1 bbl$64
GasProduction12,376 Mcf$63,632
Total$63,696

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4247, -101.6083. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42475, -101.60826 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,525 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,525 ft.

Completions filed
Feb 2003
1 of 1 wells

1 well

42-1053351310167,525 ftFeb 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (275)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

275 months

May 2026024106.413.05$73
Apr 202601998.932.87$55
Mar 20260089.753.15$0
Feb 202612163.503.75$142
Jan 202602659.138.00$208
Dec 202502756.664.41$119
Nov 202502958.593.93$114
Oct 202502259.383.30$73
Sep 202503362.743.08$102
Aug 202502163.933.01$63
Jul 202502166.743.32$70
Jun 202502266.483.13$69
May 202502260.553.23$71
Apr 202502462.363.54$85
Mar 202502267.704.27$94
Feb 202502270.884.34$96
Jan 20250074.324.28$0
Dec 202402368.993.12$72
Nov 202401769.052.20$37
Oct 202401271.372.28$27
Sep 202401469.612.36$33
Aug 202401675.632.06$33
Jul 202401779.932.15$36
Jun 202401878.082.63$47
May 202401878.812.20$40
Apr 202401984.451.66$32
Mar 202401780.301.55$26
Feb 202401676.091.78$29
Jan 202401873.023.30$59
Dec 202301571.262.61$39
Nov 202302277.892.81$62
Oct 202302585.443.09$77
Sep 202302089.042.74$55
Aug 202302480.522.67$64
Jul 202302774.852.64$71
Jun 202302968.962.26$66
May 202302170.622.23$47
Apr 202302878.122.24$63
Mar 202303072.852.39$72
Feb 202302375.112.47$57
Jan 202303376.533.39$112
Dec 202201576.415.73$86
Nov 202201885.005.65$102
Oct 202201987.185.86$111
Sep 20220184.888.16$8
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210179.795.71$6
Sep 20210869.865.35$43
Aug 20210566.024.22$21
Jul 20210270.783.98$8
Jun 20210369.493.38$10
May 20210263.483.02$6
Apr 20210560.362.76$14
Mar 20210661.302.72$16
Feb 20210457.805.55$22
Jan 20210650.412.81$17
Dec 20200644.642.68$16
Nov 20200638.772.71$16
Oct 20200736.972.48$17
Sep 20200537.091.99$10
Aug 20200639.982.39$14
Jul 20200638.371.83$11
Jun 20200634.901.69$10
May 20200716.921.81$13
Apr 20200814.751.80$14
Mar 20200730.341.86$13
Feb 20200849.881.98$16
Jan 20200757.252.09$15
Dec 201901159.012.30$25
Nov 201901255.302.75$33
Oct 201901553.472.42$36
Sep 201902155.052.66$56
Aug 201902953.112.30$67
Jul 201903556.272.46$86
Jun 201903652.782.49$90
May 201903258.482.74$88
Apr 201901262.632.75$33
Mar 201903256.803.06$98
Feb 201903050.852.79$84
Jan 201903846.033.23$123
Dec 201805346.594.19$222
Nov 201805152.934.24$216
Oct 201808661.443.40$292
Sep 201804059.543.11$124
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180365.382.90$9
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180861.782.77$22
Jan 20180562.874.01$20
Dec 201701057.272.92$29
Nov 201701555.423.12$47
Oct 201701449.292.98$42
Sep 201701747.523.09$52
Aug 201702245.373.00$66
Jul 201702543.873.09$77
Jun 2017011442.493.09$352
May 2017015145.373.26$493
Apr 20170947.933.21$29
Mar 201701346.772.98$39
Feb 201701650.452.95$47
Jan 201701849.413.42$62
Dec 201602048.763.72$74
Nov 201602042.492.64$53
Oct 201602246.193.09$68
Sep 201602241.553.10$68
Aug 201602541.442.92$73
Jul 201602641.622.92$76
Jun 201602745.352.69$73
May 201603142.521.99$62
Apr 201603336.561.99$66
Mar 201602533.011.79$45
Feb 201601926.472.06$39
Jan 201601127.352.36$26
Dec 201501032.362.00$20
Nov 201501738.792.17$37
Oct 201502243.552.43$53
Sep 201502742.992.76$74
Aug 201502840.162.87$80
Jul 201503348.152.95$97
Jun 201503756.152.88$107
May 201503455.212.96$100
Apr 201502949.822.71$78
Mar 201502542.892.93$73
Feb 201503744.662.98$110
Jan 201504143.433.10$127
Dec 201402454.693.59$86
Nov 201402270.464.25$94
Oct 201403278.303.90$125
Sep 201404086.164.05$162
Aug 201407389.394.04$295
Jul 201407696.564.18$318
Jun 201406998.164.74$327
May 201407594.734.73$354
Apr 201407795.944.81$370
Mar 201404395.895.06$217
Feb 201406797.406.19$415
Jan 201407290.404.86$350
Dec 201308891.824.35$383
Nov 201309688.853.74$359
Oct 201305397.423.78$200
Sep 2013074104.113.72$275
Aug 2013087104.253.52$306
Jul 2013047102.523.72$175
Jun 201308894.403.93$346
May 201305794.834.15$237
Apr 201305393.964.28$227
Mar 201301993.623.91$74
Feb 201301691.233.42$55
Jan 201303991.603.42$133
Dec 201204386.773.42$147
Nov 201205186.953.62$185
Oct 201208089.383.40$272
Sep 201209694.672.92$280
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201207101.652.00$14
Mar 2012035105.052.22$78
Feb 2012060101.102.57$154
Jan 20120098.092.73$0
Dec 201102496.873.24$78
Nov 201105895.723.31$192
Oct 201107584.983.65$274
Sep 201105483.623.99$215
Aug 201107483.404.15$307
Jul 2011010094.144.52$452
Jun 2011011192.904.64$515
May 201109098.134.40$396
Apr 2011058105.964.33$251
Mar 201107796.364.06$312
Feb 20110085.644.18$0
Jan 201105386.504.59$243
Dec 201005485.734.35$235
Nov 201005880.843.80$220
Oct 201006478.103.51$225
Sep 201006572.633.98$259
Aug 201006373.684.42$278
Jul 201007472.554.74$351
Jun 201004770.364.91$231
May 201003571.124.24$148
Apr 201002181.694.12$87
Mar 201002178.394.39$92
Feb 201002273.585.44$120
Jan 201002474.365.96$143
Dec 200903871.445.48$208
Nov 200905274.593.75$195
Oct 200905872.544.11$238
Sep 200902965.543.06$89
Aug 200904267.423.22$135
Jul 200904161.133.46$142
Jun 200904366.163.90$167
May 200904954.743.93$192
Apr 200905646.773.59$201
Mar 200906342.144.06$256
Feb 200906432.814.63$297
Jan 200901735.865.37$91
Dec 200803337.105.98$197
Nov 200809555.496.86$652
Oct 2008011675.246.92$803
Sep 2008021101.767.88$165
Aug 2008042114.228.48$356
Jul 2008056131.0811.39$638
Jun 2008042131.3313.03$547
May 2008044123.1711.57$509
Apr 2008039110.3110.45$408
Mar 2008047101.909.66$454
Feb 200805392.538.77$465
Jan 200805790.388.21$468
Dec 200706188.337.30$445
Nov 200706191.677.29$445
Oct 200706382.856.92$436
Sep 200707975.846.24$493
Aug 200709769.066.39$620
Jul 200709470.906.39$600
Jun 200708962.007.55$672
May 200707658.747.85$596
Apr 200709559.617.81$741
Mar 2007011356.927.30$825
Feb 2007010555.108.22$863
Jan 2007013550.306.73$908
Dec 2006012456.656.92$858
Nov 2006010954.207.62$830
Oct 200609554.906.01$571
Sep 2006010060.085.04$504
Aug 200607868.717.34$573
Jul 200606369.376.34$400
Jun 200607866.286.38$498
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 200603656.707.08$255
Feb 2006017457.597.75$1,349
Jan 2006012060.598.93$1,072
Dec 20050954.9413.42$121
Nov 20050054.6910.59$0
Oct 200502758.3413.80$372
Sep 200501261.4512.08$145
Aug 200503961.519.80$382
Jul 2005010855.697.84$847
Jun 200509052.337.38$664
May 200504845.226.65$319
Apr 2005010249.207.36$751
Mar 200506950.377.15$494
Feb 2005012645.226.31$795
Jan 200504243.166.32$266
Dec 200404239.866.75$284
Nov 200409645.286.33$608
Oct 200405449.706.52$352
Sep 2004012043.245.28$634
Aug 2004012342.375.55$683
Jul 200408738.286.08$529
Jun 2004014436.106.43$926
May 2004013837.486.49$896
Apr 2004017434.475.86$1,019
Mar 2004021334.365.53$1,178
Feb 2004017732.455.51$975
Jan 2004021032.036.30$1,323
Dec 2003017730.266.30$1,115
Nov 2003019828.804.60$910
Oct 2003019828.174.76$942
Sep 2003019826.314.75$940
Aug 2003022229.765.13$1,139
Jul 2003018529.415.17$957

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   24 Mcf  × $  3.05 =        $73

────────────────────────────────────────────────────
Month total                                      $73

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/200854 is the state's own key, not one this site invented.