SHURLEY

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 201939District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.1 M
Jul 2003 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
275
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-09-07153868
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4 bbl$344
GasProduction191,102 Mcf$1,110,725
Total$1,111,069

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4849, -100.6492. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.48488, -100.64924 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,350 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,350 ft.

Completions filed
Jul 2003
1 of 1 wells

1 well

42-43536372896,350 ftJul 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (275)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

275 months

May 20260138106.413.05$420
Apr 2026012498.932.87$356
Mar 2026013689.753.15$428
Feb 2026012463.503.75$465
Jan 2026013659.138.00$1,088
Dec 2025013656.664.41$600
Nov 2025013358.593.93$522
Oct 2025013859.383.30$456
Sep 2025013362.743.08$409
Aug 2025013763.933.01$413
Jul 2025013966.743.32$461
Jun 2025013566.483.13$422
May 2025014060.553.23$453
Apr 2025013862.363.54$489
Mar 2025014367.704.27$610
Feb 2025013170.884.34$569
Jan 2025014474.324.28$616
Dec 2024014568.993.12$453
Nov 2024014169.052.20$310
Oct 2024014671.372.28$333
Sep 2024014269.612.36$336
Aug 2024014375.632.06$295
Jul 2024014479.932.15$309
Jun 2024014078.082.63$369
May 2024015178.812.20$332
Apr 2024014784.451.66$244
Mar 2024015380.301.55$236
Feb 2024014476.091.78$257
Jan 2024015573.023.30$511
Dec 2023015471.262.61$402
Nov 2023015177.892.81$424
Oct 2023015485.443.09$475
Sep 2023013089.042.74$356
Aug 2023013080.522.67$347
Jul 2023012774.852.64$336
Jun 2023013868.962.26$312
May 2023016370.622.23$363
Apr 2023015978.122.24$356
Mar 2023016772.852.39$400
Feb 2023015775.112.47$387
Jan 2023015876.533.39$535
Dec 2022017276.415.73$985
Nov 2022015685.005.65$881
Oct 2022013987.185.86$815
Sep 2022013584.888.16$1,102
Aug 2022013994.529.13$1,269
Jul 20220139101.587.54$1,048
Jun 20220137115.097.98$1,093
May 20220143109.378.43$1,206
Apr 20220140104.226.84$957
Mar 20220144108.885.08$731
Feb 2022013291.054.86$641
Jan 2022014881.844.54$672
Dec 2021014871.323.90$577
Nov 2021014377.435.24$749
Oct 2021014879.795.71$846
Sep 2021014469.865.35$771
Aug 2021015266.024.22$642
Jul 2021015270.783.98$605
Jun 2021014969.493.38$504
May 2021015663.483.02$471
Apr 2021015360.362.76$422
Mar 2021016261.302.72$440
Feb 2021013157.805.55$727
Jan 2021016250.412.81$455
Dec 2020016144.642.68$431
Nov 2020016338.772.71$441
Oct 2020017636.972.48$436
Sep 2020020237.091.99$402
Aug 2020011839.982.39$281
Jul 2020017138.371.83$312
Jun 2020016634.901.69$281
May 2020017116.921.81$310
Apr 2020016914.751.80$305
Mar 2020018430.341.86$342
Feb 2020019149.881.98$378
Jan 2020011157.252.09$233
Dec 2019011059.012.30$253
Nov 2019016655.302.75$457
Oct 2019020353.472.42$491
Sep 2019023255.052.66$616
Aug 2019018553.112.30$426
Jul 2019011756.272.46$288
Jun 2019010452.782.49$259
May 2019018258.482.74$499
Apr 2019011562.632.75$316
Mar 2019014856.803.06$453
Feb 2019016550.852.79$461
Jan 2019020946.033.23$675
Dec 2018022146.594.19$925
Nov 2018021052.934.24$890
Oct 2018021061.443.40$714
Sep 2018022659.543.11$702
Aug 2018023359.403.07$715
Jul 2018023965.142.93$701
Jun 2018023960.183.08$735
May 2018026465.382.90$766
Apr 2018025263.842.90$731
Mar 2018026361.222.79$733
Feb 2018024361.782.77$672
Jan 2018027562.874.01$1,103
Dec 2017028157.272.92$821
Nov 2017028055.423.12$873
Oct 2017029249.292.98$871
Sep 2017028847.523.09$889
Aug 2017029745.373.00$892
Jul 2017030743.873.09$948
Jun 2017030342.493.09$935
May 2017031945.373.26$1,041
Apr 2017032447.933.21$1,041
Mar 2017035546.772.98$1,059
Feb 2017033750.452.95$995
Jan 2017037449.413.42$1,279
Dec 2016043648.763.72$1,623
Nov 2016018142.492.64$479
Oct 2016021446.193.09$661
Sep 2016020341.553.10$629
Aug 2016020941.442.92$611
Jul 2016020541.622.92$599
Jun 2016019745.352.69$529
May 2016020742.521.99$412
Apr 2016020036.561.99$398
Mar 2016020433.011.79$366
Feb 2016017526.472.06$361
Jan 2016038127.352.36$901
Dec 2015021532.362.00$430
Nov 2015021238.792.17$459
Oct 2015021743.552.43$527
Sep 2015021242.992.76$585
Aug 2015021840.162.87$626
Jul 2015032148.152.95$945
Jun 2015022556.152.88$649
May 2015022955.212.96$677
Apr 2015022649.822.71$612
Mar 2015025442.892.93$745
Feb 2015021944.662.98$652
Jan 2015023943.433.10$741
Dec 2014025854.693.59$927
Nov 2014025770.464.25$1,093
Oct 2014026278.303.90$1,022
Sep 2014025386.164.05$1,024
Aug 2014026589.394.04$1,069
Jul 2014026696.564.18$1,112
Jun 2014026598.164.74$1,255
May 2014022994.734.73$1,082
Apr 20140095.944.81$0
Mar 201407495.895.06$374
Feb 2014022997.406.19$1,418
Jan 2014025790.404.86$1,249
Dec 2013025091.824.35$1,089
Nov 2013026088.853.74$972
Oct 2013024797.423.78$934
Sep 20130241104.113.72$896
Aug 20130267104.253.52$941
Jul 20130223102.523.72$829
Jun 2013018094.403.93$708
May 2013021894.834.15$905
Apr 2013020793.964.28$887
Mar 2013021793.623.91$849
Feb 2013020091.233.42$684
Jan 2013021891.603.42$746
Dec 2012022486.773.42$766
Nov 2012021986.953.62$794
Oct 2012021589.383.40$731
Sep 2012020794.672.92$604
Aug 2012021792.662.91$631
Jul 2012021385.133.02$643
Jun 2012020779.822.52$521
May 2012021291.612.49$528
Apr 20120201101.652.00$401
Mar 20120204105.052.22$453
Feb 20120146101.102.57$375
Jan 201206198.092.73$167
Dec 201106096.873.24$194
Nov 201105795.723.31$189
Oct 201116984.983.65$337
Sep 201107983.623.99$315
Aug 2011011083.404.15$456
Jul 201106694.144.52$298
Jun 201103392.904.64$153
May 2011011998.134.40$524
Apr 20110181105.964.33$784
Mar 201101196.364.06$45
Feb 201107285.644.18$301
Jan 2011321786.504.59$1,255
Dec 2010045285.734.35$1,965
Nov 2010035880.843.80$1,359
Oct 2010039178.103.51$1,372
Sep 2010041572.633.98$1,651
Aug 201003473.684.42$150
Jul 2010038172.554.74$1,805
Jun 2010041070.364.91$2,013
May 2010048471.124.24$2,050
Apr 2010045081.694.12$1,855
Mar 2010050778.394.39$2,225
Feb 2010046973.585.44$2,552
Jan 2010051774.365.96$3,083
Dec 2009051471.445.48$2,819
Nov 2009051474.593.75$1,928
Oct 2009049672.544.11$2,039
Sep 2009048765.543.06$1,493
Aug 2009055667.423.22$1,789
Jul 2009059761.133.46$2,068
Jun 2009039966.163.90$1,554
May 2009052354.743.93$2,053
Apr 2009056346.773.59$2,020
Mar 2009060242.144.06$2,444
Feb 2009055032.814.63$2,548
Jan 2009064335.865.37$3,454
Dec 2008061137.105.98$3,652
Nov 2008059455.496.86$4,075
Oct 2008061075.246.92$4,222
Sep 20080583101.767.88$4,592
Aug 20080624114.228.48$5,293
Jul 20080718131.0811.39$8,178
Jun 20080727131.3313.03$9,475
May 20080765123.1711.57$8,854
Apr 20080799110.3110.45$8,353
Mar 20080863101.909.66$8,340
Feb 2008081492.538.77$7,139
Jan 2008091390.388.21$7,492
Dec 2007092588.337.30$6,754
Nov 2007095691.677.29$6,971
Oct 200701,01782.856.92$7,040
Sep 200701,00475.846.24$6,269
Aug 200701,05069.066.39$6,707
Jul 200701,06270.906.39$6,784
Jun 200701,05462.007.55$7,956
May 200701,13958.747.85$8,937
Apr 200701,10859.617.81$8,648
Mar 200701,16356.927.30$8,492
Feb 200701,04155.108.22$8,553
Jan 200701,18450.306.73$7,965
Dec 200601,26856.656.92$8,773
Nov 200601,29654.207.62$9,872
Oct 200601,37454.906.01$8,263
Sep 200601,35360.085.04$6,815
Aug 200601,41268.717.34$10,364
Jul 200601,45469.376.34$9,222
Jun 200601,46566.286.38$9,352
May 200601,59166.016.42$10,222
Apr 200601,30964.397.36$9,635
Mar 200601,59256.707.08$11,276
Feb 200601,46657.597.75$11,363
Jan 200601,65660.598.93$14,794
Dec 200501,68754.9413.42$22,632
Nov 200501,68554.6910.59$17,841
Oct 200501,81458.3413.80$25,026
Sep 200501,80661.4512.08$21,815
Aug 200501,61461.519.80$15,812
Jul 200501,42555.697.84$11,177
Jun 200501,48652.337.38$10,968
May 200501,46345.226.65$9,731
Apr 200501,84349.207.36$13,565
Mar 200502,17350.377.15$15,548
Feb 200502,01745.226.31$12,731
Jan 200502,18143.166.32$13,789
Dec 200402,38139.866.75$16,074
Nov 200402,71345.286.33$17,174
Oct 200402,65149.706.52$17,272
Sep 200402,83443.245.28$14,975
Aug 200403,05642.375.55$16,963
Jul 200403,11938.286.08$18,977
Jun 200402,93036.106.43$18,849
May 200402,92837.486.49$19,016
Apr 200403,15934.475.86$18,507
Mar 200403,28234.365.53$18,150
Feb 200403,40032.455.51$18,733
Jan 200403,51332.036.30$22,131
Dec 200302,93330.266.30$18,483
Nov 200306,29428.804.60$28,922
Oct 200308,08228.174.76$38,467
Sep 200309,36026.314.75$44,454
Aug 2003013,02529.765.13$66,815
Jul 2003010,11529.415.17$52,303

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  138 Mcf  × $  3.05 =       $420

────────────────────────────────────────────────────
Month total                                     $420

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/201939 is the state's own key, not one this site invented.