SIMMONS RANCH

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 203020District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.6 M
Sep 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
273
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-03-11156107
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition78 bbl$6,109
GasProduction268,083 Mcf$1,553,623
Total$1,559,732

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6347, -100.7500. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.63474, -100.75002 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,242 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,242 ft.

Completions filed
Sep 2003
1 of 1 wells

1 well

42-43536444488,242 ftSep 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (273)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

273 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240471.372.28$9
Sep 202401569.612.36$35
Aug 202404275.632.06$87
Jul 202404379.932.15$92
Jun 202405278.082.63$137
May 202405378.812.20$117
Apr 202404784.451.66$78
Mar 202404980.301.55$76
Feb 202404676.091.78$82
Jan 202403873.023.30$125
Dec 202305071.262.61$131
Nov 202305577.892.81$154
Oct 202306385.443.09$195
Sep 202305689.042.74$153
Aug 202305980.522.67$158
Jul 2023014174.852.64$372
Jun 202305068.962.26$113
May 202307970.622.23$176
Apr 202309978.122.24$222
Mar 2023010172.852.39$242
Feb 202308775.112.47$215
Jan 202306276.533.39$210
Dec 202205376.415.73$304
Nov 202205585.005.65$311
Oct 202205887.185.86$340
Sep 202205884.888.16$473
Aug 202205994.529.13$539
Jul 2022059101.587.54$445
Jun 2022058115.097.98$463
May 2022060109.378.43$506
Apr 2022061104.226.84$417
Mar 2022063108.885.08$320
Feb 202205391.054.86$258
Jan 202207381.844.54$331
Dec 2021020171.323.90$784
Nov 2021018277.435.24$953
Oct 2021019879.795.71$1,131
Sep 2021020169.865.35$1,076
Aug 2021021566.024.22$907
Jul 2021021870.783.98$868
Jun 2021021669.493.38$730
May 2021022363.483.02$673
Apr 2021021560.362.76$593
Mar 2021022161.302.72$600
Feb 2021018557.805.55$1,026
Jan 202108150.412.81$228
Dec 202009044.642.68$241
Nov 202008238.772.71$222
Oct 202008436.972.48$208
Sep 202008737.091.99$173
Aug 202007639.982.39$181
Jul 202007738.371.83$141
Jun 202007734.901.69$130
May 202007416.921.81$134
Apr 202007714.751.80$139
Mar 202007930.341.86$147
Feb 202007249.881.98$143
Jan 202007657.252.09$159
Dec 201907759.012.30$177
Nov 2019018755.302.75$514
Oct 2019015353.472.42$370
Sep 2019017555.052.66$465
Aug 2019010553.112.30$242
Jul 2019018456.272.46$453
Jun 2019016852.782.49$419
May 2019018658.482.74$510
Apr 2019024962.632.75$685
Mar 2019031156.803.06$952
Feb 2019051150.852.79$1,427
Jan 2019058246.033.23$1,879
Dec 2018057446.594.19$2,402
Nov 2018053652.934.24$2,271
Oct 2018042161.443.40$1,431
Sep 2018052959.543.11$1,644
Aug 2018064759.403.07$1,984
Jul 2018170665.142.93$2,135
Jun 2018125960.183.08$857
May 2018030565.382.90$885
Apr 2018058163.842.90$1,685
Mar 2018064261.222.79$1,789
Feb 2018045061.782.77$1,245
Jan 2018053362.874.01$2,137
Dec 2017060857.272.92$1,776
Nov 2017062055.423.12$1,933
Oct 2017061949.292.98$1,847
Sep 2017059847.523.09$1,846
Aug 2017064545.373.00$1,938
Jul 2017064643.873.09$1,994
Jun 2017066342.493.09$2,047
May 2017068345.373.26$2,229
Apr 2017067647.933.21$2,171
Mar 2017070446.772.98$2,101
Feb 2017064250.452.95$1,896
Jan 2017070449.413.42$2,407
Dec 2016269948.763.72$2,700
Nov 2016167342.492.64$1,822
Oct 2016072146.193.09$2,228
Sep 2016071341.553.10$2,211
Aug 2016075941.442.92$2,220
Jul 2016078441.622.92$2,293
Jun 2016078745.352.69$2,114
May 2016177542.521.99$1,586
Apr 2016176636.561.99$1,562
Mar 2016079133.011.79$1,419
Feb 2016076126.472.06$1,570
Jan 2016081527.352.36$1,927
Dec 2015077832.362.00$1,557
Nov 2015077238.792.17$1,673
Oct 2015079843.552.43$1,936
Sep 2015072942.992.76$2,011
Aug 2015177240.162.87$2,258
Jul 2015487848.152.95$2,778
Jun 2015095056.152.88$2,739
May 2015335955.212.96$1,227
Apr 20150049.822.71$0
Mar 20150142.892.93$3
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 201401186.164.05$45
Aug 201409089.394.04$363
Jul 2014012896.564.18$535
Jun 2014047098.164.74$2,226
May 2014036694.734.73$1,730
Apr 2014029595.944.81$1,419
Mar 2014962095.895.06$3,998
Feb 201409697.406.19$594
Jan 2014012290.404.86$593
Dec 2013024491.824.35$1,062
Nov 2013052288.853.74$1,951
Oct 2013033997.423.78$1,281
Sep 20130543104.113.72$2,019
Aug 20130956104.253.52$3,368
Jul 20130429102.523.72$1,595
Jun 2013067394.403.93$2,647
May 2013093794.834.15$3,888
Apr 2013076393.964.28$3,268
Mar 2013089893.623.91$3,514
Feb 2013090591.233.42$3,095
Jan 201301,01291.603.42$3,461
Dec 201201,09486.773.42$3,742
Nov 201201,38786.953.62$5,028
Oct 201203089.383.40$102
Sep 201203994.672.92$114
Aug 2012011392.662.91$329
Jul 2012043085.133.02$1,299
Jun 2012073579.822.52$1,851
May 201201,09791.612.49$2,730
Apr 201201,068101.652.00$2,133
Mar 20120725105.052.22$1,611
Feb 20120873101.102.57$2,244
Jan 201201,15098.092.73$3,144
Dec 201101,20096.873.24$3,888
Nov 201101,16595.723.31$3,858
Oct 201101,24184.983.65$4,528
Sep 201101,34583.623.99$5,361
Aug 20115482083.404.15$7,906
Jul 201109494.144.52$425
Jun 2011014292.904.64$659
May 201109498.134.40$414
Apr 20110173105.964.33$750
Mar 2011016896.364.06$682
Feb 2011014385.644.18$598
Jan 201109286.504.59$422
Dec 201004685.734.35$200
Nov 201004480.843.80$167
Oct 2010011578.103.51$404
Sep 2010011272.633.98$446
Aug 2010010373.684.42$455
Jul 2010013172.554.74$620
Jun 2010011270.364.91$550
May 201008771.124.24$368
Apr 2010011381.694.12$466
Mar 2010014578.394.39$636
Feb 2010011273.585.44$610
Jan 2010015374.365.96$913
Dec 2009020671.445.48$1,130
Nov 200909674.593.75$360
Oct 2009012572.544.11$514
Sep 2009012965.543.06$395
Aug 2009022367.423.22$718
Jul 2009012061.133.46$416
Jun 2009019566.163.90$760
May 2009015054.743.93$589
Apr 2009013946.773.59$499
Mar 2009018742.144.06$759
Feb 2009012532.814.63$579
Jan 2009019135.865.37$1,026
Dec 2008027037.105.98$1,614
Nov 2008041855.496.86$2,868
Oct 2008075575.246.92$5,226
Sep 20080757101.767.88$5,963
Aug 20080704114.228.48$5,972
Jul 20080692131.0811.39$7,881
Jun 20080981131.3313.03$12,785
May 200801,097123.1711.57$12,697
Apr 200801,223110.3110.45$12,786
Mar 200801,247101.909.66$12,051
Feb 200801,16892.538.77$10,244
Jan 200801,24890.388.21$10,241
Dec 200701,27388.337.30$9,295
Nov 200701,26191.677.29$9,195
Oct 200701,33682.856.92$9,248
Sep 200701,32875.846.24$8,292
Aug 200701,39169.066.39$8,886
Jul 200701,43170.906.39$9,141
Jun 200701,42462.007.55$10,749
May 200701,49158.747.85$11,699
Apr 200701,42559.617.81$11,122
Mar 200701,53656.927.30$11,216
Feb 200701,41955.108.22$11,659
Jan 200701,60950.306.73$10,824
Dec 200601,65356.656.92$11,436
Nov 200601,65954.207.62$12,637
Oct 200601,76254.906.01$10,596
Sep 200601,78460.085.04$8,986
Aug 200601,90968.717.34$14,012
Jul 200601,75869.376.34$11,151
Jun 200601,80866.286.38$11,542
May 200602,15066.016.42$13,814
Apr 200601,80164.397.36$13,256
Mar 200602,32256.707.08$16,447
Feb 200602,39757.597.75$18,579
Jan 200602,40060.598.93$21,440
Dec 200502,99954.9413.42$40,233
Nov 200502,91854.6910.59$30,897
Oct 200501,51458.3413.80$20,887
Sep 200501,83461.4512.08$22,153
Aug 200502,76661.519.80$27,098
Jul 200503,09855.697.84$24,300
Jun 200503,07852.337.38$22,719
May 200503,47045.226.65$23,080
Apr 200503,25849.207.36$23,980
Mar 200503,63050.377.15$25,972
Feb 200504,12945.226.31$26,062
Jan 200503,23643.166.32$20,459
Dec 200403,35439.866.75$22,643
Nov 200403,54645.286.33$22,448
Oct 200403,87049.706.52$25,213
Sep 200404,21143.245.28$22,251
Aug 200404,68942.375.55$26,027
Jul 200404,87738.286.08$29,673
Jun 200405,26936.106.43$33,896
May 200406,07637.486.49$39,461
Apr 200406,98634.475.86$40,927
Mar 200407,61134.365.53$42,090
Feb 200407,75032.455.51$42,700
Jan 200408,85732.036.30$55,796
Dec 200309,74330.266.30$61,397
Nov 2003010,76128.804.60$49,449
Oct 2003013,84028.174.76$65,873
Sep 2003013,56226.314.75$64,411

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 71.37 =         $0
Gas                    4 Mcf  × $  2.28 =         $9

────────────────────────────────────────────────────
Month total                                       $9

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/203020 is the state's own key, not one this site invented.