DAVIS, G.H.

Operated by UPP OPERATING, LLC (P-5 875310) in the STEEN (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 204561District 7CField 85822500CondensateGasSaveExport
Value, all time
$717 k
Feb 2004 – May 2026
Value, last 12 filed months
$11 k
at the published price for each month
Months reported
268
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7 leases and 7 wells, and the rule below applies to all of them.

Discovered
1954-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 11/01/2003.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition128 bbl$7,352
GasProduction130,058 Mcf$709,200
Total$716,552

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6188, -100.6254. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.61881, -100.62544 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,950 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,950 ft.

Completions filed
Feb 2004
1 of 1 wells

1 well

42-4353403575,950 ftFeb 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (268)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

268 months

May 20260239106.413.05$728
Apr 2026025798.932.87$738
Mar 2026025889.753.15$813
Feb 2026022863.503.75$855
Jan 2026025359.138.00$2,023
Dec 2025024956.664.41$1,099
Nov 2025026658.593.93$1,044
Oct 2025025759.383.30$849
Sep 2025023762.743.08$729
Aug 2025024663.933.01$742
Jul 2025024866.743.32$822
Jun 2025023266.483.13$726
May 2025024660.553.23$795
Apr 2025022362.363.54$790
Mar 2025025467.704.27$1,084
Feb 2025021870.884.34$946
Jan 2025025874.324.28$1,104
Dec 2024025568.993.12$796
Nov 2024024969.052.20$547
Oct 2024024571.372.28$559
Sep 2024024369.612.36$575
Aug 2024023975.632.06$493
Jul 2024025379.932.15$543
Jun 2024024178.082.63$635
May 2024024878.812.20$545
Apr 2024025284.451.66$418
Mar 2024025780.301.55$397
Feb 2024025076.091.78$446
Jan 2024025973.023.30$854
Dec 2023025971.262.61$676
Nov 2023025577.892.81$716
Oct 2023026185.443.09$806
Sep 2023025289.042.74$689
Aug 2023027780.522.67$740
Jul 2023026874.852.64$708
Jun 2023027368.962.26$617
May 2023028870.622.23$641
Apr 2023028178.122.24$629
Mar 2023028972.852.39$692
Feb 2023025375.112.47$624
Jan 2023028176.533.39$952
Dec 2022028076.415.73$1,604
Nov 2022027885.005.65$1,570
Oct 2022029287.185.86$1,712
Sep 2022026884.888.16$2,188
Aug 2022028894.529.13$2,629
Jul 20220291101.587.54$2,195
Jun 20220264115.097.98$2,106
May 20220288109.378.43$2,429
Apr 20220278104.226.84$1,901
Mar 20220290108.885.08$1,472
Feb 2022025691.054.86$1,244
Jan 2022029381.844.54$1,330
Dec 2021029471.323.90$1,146
Nov 2021028677.435.24$1,498
Oct 2021029379.795.71$1,674
Sep 2021028269.865.35$1,509
Aug 2021029566.024.22$1,245
Jul 2021029070.783.98$1,155
Jun 2021025569.493.38$862
May 2021026963.483.02$812
Apr 2021024960.362.76$687
Mar 2021025061.302.72$679
Feb 2021019957.805.55$1,104
Jan 2021030250.412.81$849
Dec 2020021344.642.68$570
Nov 2020017038.772.71$460
Oct 2020018336.972.48$454
Sep 2020023637.091.99$470
Aug 2020022939.982.39$546
Jul 2020025038.371.83$456
Jun 2020023034.901.69$389
May 2020022016.921.81$399
Apr 202007814.751.80$141
Mar 2020012930.341.86$239
Feb 2020011749.881.98$232
Jan 2020011457.252.09$239
Dec 2019011259.012.30$258
Nov 2019010855.302.75$297
Oct 2019013253.472.42$319
Sep 2019020955.052.66$555
Aug 2019021853.112.30$502
Jul 2019019656.272.46$482
Jun 2019021052.782.49$523
May 2019026258.482.74$718
Apr 2019023462.632.75$644
Mar 2019024356.803.06$744
Feb 2019021250.852.79$592
Jan 2019024246.033.23$781
Dec 2018023646.594.19$988
Nov 2018024052.934.24$1,017
Oct 2018027961.443.40$948
Sep 2018026259.543.11$814
Aug 2018028659.403.07$877
Jul 2018029165.142.93$853
Jun 2018027960.183.08$858
May 2018028265.382.90$818
Apr 2018026363.842.90$763
Mar 2018028161.222.79$783
Feb 2018024861.782.77$686
Jan 2018026462.874.01$1,058
Dec 2017028157.272.92$821
Nov 2017027855.423.12$867
Oct 2017029649.292.98$883
Sep 2017029647.523.09$914
Aug 2017031345.373.00$940
Jul 2017032343.873.09$997
Jun 2017030742.493.09$948
May 2017032745.373.26$1,067
Apr 2017031947.933.21$1,025
Mar 2017033146.772.98$988
Feb 2017029750.452.95$877
Jan 2017032449.413.42$1,108
Dec 2016032548.763.72$1,210
Nov 20161042.492.64$42
Oct 2016044046.193.09$1,360
Sep 2016044041.553.10$1,364
Aug 2016044041.442.92$1,287
Jul 2016049541.622.92$1,448
Jun 2016046845.352.69$1,257
May 2016048742.521.99$970
Apr 2016045736.561.99$910
Mar 2016048933.011.79$877
Feb 2016047626.472.06$982
Jan 2016052027.352.36$1,229
Dec 2015054732.362.00$1,095
Nov 2015049338.792.17$1,068
Oct 2015053243.552.43$1,291
Sep 2015058642.992.76$1,616
Aug 2015053940.162.87$1,548
Jul 2015038348.152.95$1,128
Jun 2015039456.152.88$1,136
May 2015040855.212.96$1,206
Apr 2015037649.822.71$1,018
Mar 2015038942.892.93$1,142
Feb 2015035944.662.98$1,068
Jan 2015041643.433.10$1,290
Dec 2014044654.693.59$1,602
Nov 2014038970.464.25$1,654
Oct 2014043278.303.90$1,685
Sep 2014040786.164.05$1,646
Aug 2014043389.394.04$1,747
Jul 2014051696.564.18$2,157
Jun 2014038798.164.74$1,833
May 2014041194.734.73$1,943
Apr 2014048495.944.81$2,328
Mar 2014040495.895.06$2,043
Feb 2014041697.406.19$2,576
Jan 2014039790.404.86$1,930
Dec 2013036091.824.35$1,568
Nov 2013034788.853.74$1,297
Oct 2013045197.423.78$1,704
Sep 20130490104.113.72$1,822
Aug 20130540104.253.52$1,902
Jul 20130487102.523.72$1,811
Jun 2013052394.403.93$2,057
May 2013047994.834.15$1,987
Apr 2013045993.964.28$1,966
Mar 2013028393.623.91$1,107
Feb 2013034991.233.42$1,194
Jan 2013043191.603.42$1,474
Dec 2012041686.773.42$1,423
Nov 2012045186.953.62$1,635
Oct 2012038089.383.40$1,292
Sep 2012036894.672.92$1,074
Aug 2012038192.662.91$1,108
Jul 2012036285.133.02$1,094
Jun 2012034879.822.52$877
May 2012038791.612.49$963
Apr 20120365101.652.00$729
Mar 20120327105.052.22$727
Feb 20120330101.102.57$848
Jan 2012033798.092.73$921
Dec 2011037396.873.24$1,208
Nov 2011037895.723.31$1,252
Oct 2011036384.983.65$1,324
Sep 2011044583.623.99$1,774
Aug 2011054983.404.15$2,278
Jul 2011049094.144.52$2,213
Jun 2011045292.904.64$2,097
May 2011037698.134.40$1,656
Apr 20110368105.964.33$1,595
Mar 2011026196.364.06$1,059
Feb 2011022685.644.18$945
Jan 201108786.504.59$399
Dec 2010028685.734.35$1,243
Nov 2010058180.843.80$2,205
Oct 201006678.103.51$232
Sep 2010065172.633.98$2,591
Aug 2010063873.684.42$2,820
Jul 2010064072.554.74$3,031
Jun 2010056670.364.91$2,779
May 2010064071.124.24$2,711
Apr 2010057181.694.12$2,354
Mar 2010064078.394.39$2,809
Feb 2010056273.585.44$3,059
Jan 2010055374.365.96$3,298
Dec 2009061271.445.48$3,356
Nov 2009064374.593.75$2,412
Oct 2009063672.544.11$2,614
Sep 2009063665.543.06$1,949
Aug 20091265967.423.22$2,930
Jul 2009072361.133.46$2,505
Jun 2009067466.163.90$2,625
May 2009076654.743.93$3,007
Apr 2009069846.773.59$2,504
Mar 2009080942.144.06$3,284
Feb 2009064232.814.63$2,974
Jan 2009059335.865.37$3,185
Dec 2008065537.105.98$3,915
Nov 2008063055.496.86$4,322
Oct 2008059575.246.92$4,119
Sep 20080513101.767.88$4,041
Aug 20080469114.228.48$3,979
Jul 200801,005131.0811.39$11,446
Jun 20080994131.3313.03$12,954
May 200801,116123.1711.57$12,917
Apr 20080859110.3110.45$8,981
Mar 20080876101.909.66$8,466
Feb 20082383092.538.77$9,408
Jan 2008087390.388.21$7,164
Dec 2007089088.337.30$6,499
Nov 2007089391.677.29$6,511
Oct 200701,25282.856.92$8,666
Sep 200701,10375.846.24$6,887
Aug 200701,03369.066.39$6,599
Jul 2007093870.906.39$5,992
Jun 2007095962.007.55$7,239
May 200701,34258.747.85$10,530
Apr 2007087259.617.81$6,806
Mar 200701,09556.927.30$7,996
Feb 2007095455.108.22$7,838
Jan 2007221,08150.306.73$8,378
Dec 200601,11956.656.92$7,742
Nov 200601,14754.207.62$8,737
Oct 200601,00754.906.01$6,056
Sep 200601,04660.085.04$5,269
Aug 200601,13168.717.34$8,301
Jul 200601,13369.376.34$7,186
Jun 200601,08266.286.38$6,907
May 200601,15466.016.42$7,414
Apr 200601,16864.397.36$8,597
Mar 2006161,18156.707.08$9,272
Feb 200601,06157.597.75$8,224
Jan 200601,04460.598.93$9,326
Dec 200501,04454.9413.42$14,006
Nov 200501,07554.6910.59$11,383
Oct 200501,32158.3413.80$18,224
Sep 200501,22361.4512.08$14,773
Aug 200501,16661.519.80$11,423
Jul 2005131,15055.697.84$9,744
Jun 200501,11352.337.38$8,215
May 200501,08745.226.65$7,230
Apr 200501,08449.207.36$7,979
Mar 200501,01550.377.15$7,262
Feb 2005055045.226.31$3,472
Jan 2005058443.166.32$3,692
Dec 20044154439.866.75$5,307
Nov 2004070245.286.33$4,444
Oct 2004080849.706.52$5,264
Sep 2004088143.245.28$4,655
Aug 2004090542.375.55$5,023
Jul 200401,12238.286.08$6,826
Jun 200401,04236.106.43$6,703
May 2004079437.486.49$5,157
Apr 2004077434.475.86$4,534
Mar 200401,31334.365.53$7,261
Feb 200401,09932.455.51$6,055

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  239 Mcf  × $  3.05 =       $728

────────────────────────────────────────────────────
Month total                                     $728

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/204561 is the state's own key, not one this site invented.