Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 204690District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.5 M
Aug 2003 – May 2026
Value, last 12 filed months
$43 k
at the published price for each month
Months reported
274
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-12-20172034
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition130 bbl$7,841
GasProduction643,465 Mcf$3,510,274
Total$3,518,115

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4349, -100.7661. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.43486, -100.76610 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,700 ft.

Completions filed
Aug 2003
1 of 1 wells

1 well

42-4353635817388,700 ftAug 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (274)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

274 months

May 20261930106.413.05$2,939
Apr 2026389998.932.87$2,877
Mar 2026393089.753.15$3,198
Feb 2026384063.503.75$3,341
Jan 2026092059.138.00$7,358
Dec 2025494156.664.41$4,380
Nov 2025191258.593.93$3,640
Oct 2025391259.383.30$3,192
Sep 2025089762.743.08$2,760
Aug 2025392063.933.01$2,965
Jul 2025192366.743.32$3,127
Jun 2025090566.483.13$2,831
May 2025194260.553.23$3,105
Apr 2025491762.363.54$3,498
Mar 2025294267.704.27$4,156
Feb 2025184170.884.34$3,722
Jan 2025292674.324.28$4,111
Dec 2024193368.993.12$2,981
Nov 2024190469.052.20$2,056
Oct 2024190871.372.28$2,143
Sep 2024289069.612.36$2,244
Aug 2024161475.632.06$1,343
Jul 2024299579.932.15$2,296
Jun 2024181178.082.63$2,214
May 2024195978.812.20$2,187
Apr 2024491284.451.66$1,851
Mar 2024193180.301.55$1,519
Feb 2024294976.091.78$1,845
Jan 202421,01173.023.30$3,480
Dec 202321,01471.262.61$2,790
Nov 2023197377.892.81$2,810
Oct 2023199685.443.09$3,160
Sep 2023095889.042.74$2,620
Aug 2023098280.522.67$2,625
Jul 2023097274.852.64$2,568
Jun 2023092368.962.26$2,085
May 2023093670.622.23$2,085
Apr 2023087578.122.24$1,958
Mar 202301,16972.852.39$2,798
Feb 2023089375.112.47$2,202
Jan 202301,02776.533.39$3,479
Dec 202201,02176.415.73$5,849
Nov 202201,11085.005.65$6,267
Oct 202201,18387.185.86$6,937
Sep 202201,17384.888.16$9,576
Aug 202201,24194.529.13$11,327
Jul 202201,239101.587.54$9,345
Jun 202201,053115.097.98$8,400
May 20220998109.378.43$8,416
Apr 202201,179104.226.84$8,062
Mar 202201,281108.885.08$6,503
Feb 2022090091.054.86$4,373
Jan 202201,16681.844.54$5,291
Dec 202101,14871.323.90$4,476
Nov 202101,10477.435.24$5,781
Oct 202101,10379.795.71$6,302
Sep 202101,06769.865.35$5,709
Aug 202101,15066.024.22$4,854
Jul 202101,13170.783.98$4,504
Jun 202101,19469.493.38$4,036
May 202101,36363.483.02$4,113
Apr 202101,11460.362.76$3,073
Mar 202101,33861.302.72$3,635
Feb 202101,25057.805.55$6,935
Jan 202101,42150.412.81$3,993
Dec 202001,44644.642.68$3,869
Nov 202001,49338.772.71$4,041
Oct 202001,89236.972.48$4,689
Sep 202001,16537.091.99$2,320
Aug 2020219039.982.39$533
Jul 2020030738.371.83$560
Jun 202001,07434.901.69$1,815
May 2020063816.921.81$1,158
Apr 2020049114.751.80$886
Mar 2020095130.341.86$1,765
Feb 2020188249.881.98$1,797
Jan 202031,24457.252.09$2,778
Dec 201931,51659.012.30$3,670
Nov 201921,00955.302.75$2,886
Oct 201901,13353.472.42$2,740
Sep 2019698155.052.66$2,937
Aug 201931,16353.112.30$2,839
Jul 201901,40356.272.46$3,451
Jun 201971,22152.782.49$3,411
May 201931,21858.482.74$3,513
Apr 201901,25262.632.75$3,444
Mar 201961,32156.803.06$4,386
Feb 201901,26550.852.79$3,532
Jan 201921,41146.033.23$4,647
Dec 201801,42946.594.19$5,981
Nov 201801,39152.934.24$5,894
Oct 201811,43861.443.40$4,948
Sep 201801,41459.543.11$4,395
Aug 201801,50259.403.07$4,606
Jul 201811,52965.142.93$4,548
Jun 201801,55160.183.08$4,772
May 201801,29165.382.90$3,745
Apr 201811,26463.842.90$3,730
Mar 201811,33961.222.79$3,793
Feb 201801,13261.782.77$3,131
Jan 201801,33462.874.01$5,348
Dec 201711,89157.272.92$5,582
Nov 201711,58055.423.12$4,982
Oct 201711,45549.292.98$4,391
Sep 201711,47047.523.09$4,586
Aug 201721,09945.373.00$3,393
Jul 201701,45343.873.09$4,486
Jun 201741,47842.493.09$4,733
May 201711,49545.373.26$4,924
Apr 201711,23347.933.21$4,008
Mar 201731,59346.772.98$4,893
Feb 201721,35450.452.95$4,099
Jan 201711,42349.413.42$4,914
Dec 201611,42048.763.72$5,335
Nov 201611,27942.492.64$3,425
Oct 201611,19146.193.09$3,727
Sep 2016095541.553.10$2,961
Aug 201611,48741.442.92$4,390
Jul 201601,81541.622.92$5,308
Jun 201611,61045.352.69$4,370
May 201601,78042.521.99$3,544
Apr 201601,79436.561.99$3,572
Mar 201632,06633.011.79$3,805
Feb 201601,69826.472.06$3,504
Jan 201601,34427.352.36$3,178
Dec 2015152932.362.00$1,091
Nov 201511,41738.792.17$3,110
Oct 2015196943.552.43$2,395
Sep 2015184242.992.76$2,366
Aug 201511,22840.162.87$3,568
Jul 201511,49748.152.95$4,457
Jun 201501,83856.152.88$5,299
May 201501,23455.212.96$3,647
Apr 201501,51249.822.71$4,092
Mar 201501,58542.892.93$4,652
Feb 201501,49544.662.98$4,449
Jan 201501,50743.433.10$4,673
Dec 201401,68154.693.59$6,037
Nov 201401,69670.464.25$7,211
Oct 201401,76878.303.90$6,897
Sep 201401,66386.164.05$6,728
Aug 201401,75489.394.04$7,078
Jul 201411,69396.564.18$7,173
Jun 201401,70898.164.74$8,091
May 201401,78294.734.73$8,423
Apr 201401,53895.944.81$7,396
Mar 201401,50495.895.06$7,605
Feb 201401,37197.406.19$8,489
Jan 201401,58890.404.86$7,719
Dec 201301,53791.824.35$6,693
Nov 201301,70888.853.74$6,385
Oct 201301,85997.423.78$7,026
Sep 201301,770104.113.72$6,580
Aug 201301,806104.253.52$6,362
Jul 201301,853102.523.72$6,889
Jun 201301,78594.403.93$7,021
May 201301,89194.834.15$7,846
Apr 201301,87693.964.28$8,034
Mar 201301,87593.623.91$7,337
Feb 201301,68391.233.42$5,756
Jan 201301,88291.603.42$6,436
Dec 201201,90886.773.42$6,526
Nov 201201,86786.953.62$6,768
Oct 201201,95389.383.40$6,640
Sep 201201,90694.672.92$5,562
Aug 201202,02792.662.91$5,895
Jul 201202,02485.133.02$6,114
Jun 201202,03979.822.52$5,136
May 201202,13391.612.49$5,308
Apr 201202,176101.652.00$4,345
Mar 201202,380105.052.22$5,289
Feb 201201,784101.102.57$4,585
Jan 201201,95898.092.73$5,353
Dec 201101,97096.873.24$6,382
Nov 201101,93695.723.31$6,411
Oct 201102,00884.983.65$7,326
Sep 201101,99583.623.99$7,952
Aug 201102,00883.404.15$8,332
Jul 201101,96894.144.52$8,890
Jun 201102,01692.904.64$9,354
May 201102,10698.134.40$9,277
Apr 201102,045105.964.33$8,862
Mar 201102,22196.364.06$9,011
Feb 201101,83085.644.18$7,649
Jan 201102,14586.504.59$9,843
Dec 201002,13185.734.35$9,265
Nov 201002,22380.843.80$8,437
Oct 201002,28678.103.51$8,021
Sep 201002,05772.633.98$8,186
Aug 201002,29673.684.42$10,147
Jul 201002,35872.554.74$11,169
Jun 201002,28470.364.91$11,215
May 201002,08771.124.24$8,839
Apr 201002,04981.694.12$8,447
Mar 201002,12678.394.39$9,330
Feb 201002,10673.585.44$11,462
Jan 201001,71574.365.96$10,228
Dec 200901,93171.445.48$10,589
Nov 200901,58074.593.75$5,927
Oct 200901,74572.544.11$7,172
Sep 200902,55965.543.06$7,843
Aug 200902,01767.423.22$6,492
Jul 200902,78461.133.46$9,645
Jun 200902,79966.163.90$10,902
May 200902,93854.743.93$11,534
Apr 200902,86846.773.59$10,289
Mar 200903,04142.144.06$12,343
Feb 200902,61432.814.63$12,111
Jan 200903,05035.865.37$16,382
Dec 200803,19837.105.98$19,115
Nov 200802,88055.496.86$19,758
Oct 200803,16175.246.92$21,880
Sep 200803,233101.767.88$25,467
Aug 200803,157114.228.48$26,781
Jul 200803,232131.0811.39$36,811
Jun 200803,150131.3313.03$41,053
May 200803,299123.1711.57$38,184
Apr 200803,307110.3110.45$34,574
Mar 200803,516101.909.66$33,979
Feb 200803,41392.538.77$29,934
Jan 200803,90890.388.21$32,068
Dec 200703,19688.337.30$23,337
Nov 200703,40091.677.29$24,792
Oct 200703,83282.856.92$26,525
Sep 200703,79275.846.24$23,678
Aug 200704,01369.066.39$25,635
Jul 200704,28070.906.39$27,340
Jun 200703,90162.007.55$29,447
May 200703,79358.747.85$29,761
Apr 200703,44759.617.81$26,905
Mar 200703,51256.927.30$25,645
Feb 200703,02355.108.22$24,837
Jan 200703,37350.306.73$22,690
Dec 200602,81456.656.92$19,468
Nov 200603,30654.207.62$25,183
Oct 200603,78954.906.01$22,786
Sep 200603,66560.085.04$18,461
Aug 200603,97368.717.34$29,162
Jul 200604,24269.376.34$26,906
Jun 200604,21966.286.38$26,934
May 200604,57366.016.42$29,382
Apr 200604,64664.397.36$34,197
Mar 200603,79456.707.08$26,873
Feb 200604,19757.597.75$32,531
Jan 200604,88160.598.93$43,604
Dec 200504,78954.9413.42$64,246
Nov 200504,79254.6910.59$50,740
Oct 200505,18658.3413.80$71,545
Sep 200505,16161.4512.08$62,340
Aug 200505,61161.519.80$54,970
Jul 200505,70055.697.84$44,709
Jun 200505,66952.337.38$41,843
May 200506,02845.226.65$40,093
Apr 200506,02749.207.36$44,362
Mar 200506,37950.377.15$45,641
Feb 200506,15945.226.31$38,875
Jan 200506,65643.166.32$42,081
Dec 200408,39039.866.75$56,642
Nov 200407,74845.286.33$49,048
Oct 200406,13349.706.52$39,957
Sep 200407,16143.245.28$37,838
Aug 200407,59442.375.55$42,152
Jul 200407,22638.286.08$43,964
Jun 200407,97236.106.43$51,284
May 200408,54937.486.49$55,522
Apr 200408,75334.475.86$51,279
Mar 200409,96334.365.53$55,097
Feb 200409,96332.455.51$54,892
Jan 2004010,97532.036.30$69,139
Dec 2003011,97630.266.30$75,468
Nov 2003012,00428.804.60$55,160
Oct 2003013,61328.174.76$64,793
Sep 20030026.314.75$0
Aug 20030029.765.13$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             1 bbl  × $106.41 =       $106
Gas                  930 Mcf  × $  3.05 =     $2,833

────────────────────────────────────────────────────
Month total                                   $2,939

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/204690 is the state's own key, not one this site invented.