WILSON, DUKE

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 204845District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.2 M
Mar 2004 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
267
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-06-08156894
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition7 bbl$317
GasProduction216,389 Mcf$1,197,325
Total$1,197,642

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3802, -100.7185. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.38019, -100.71849 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,300 ft.

Completions filed
Mar 2004
1 of 1 wells

1 well

42-4353668815337,300 ftMar 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (267)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

267 months

May 2026063106.413.05$192
Apr 202605898.932.87$166
Mar 202605989.753.15$186
Feb 202605563.503.75$206
Jan 202605759.138.00$456
Dec 202505856.664.41$256
Nov 202505758.593.93$224
Oct 202505359.383.30$175
Sep 202505662.743.08$172
Aug 202505663.933.01$169
Jul 202505266.743.32$172
Jun 202504966.483.13$153
May 202505260.553.23$168
Apr 202505062.363.54$177
Mar 202505067.704.27$213
Feb 202504370.884.34$187
Jan 202505774.324.28$244
Dec 202406168.993.12$190
Nov 202405569.052.20$121
Oct 202405771.372.28$130
Sep 202405269.612.36$123
Aug 202405275.632.06$107
Jul 202405279.932.15$112
Jun 202404578.082.63$119
May 202404978.812.20$108
Apr 202405184.451.66$85
Mar 202404980.301.55$76
Feb 202404876.091.78$86
Jan 202404673.023.30$152
Dec 202303971.262.61$102
Nov 202304077.892.81$112
Oct 202304985.443.09$151
Sep 202302389.042.74$63
Aug 20230480.522.67$11
Jul 20230474.852.64$11
Jun 202304968.962.26$111
May 2023031970.622.23$711
Apr 2023031078.122.24$694
Mar 2023031672.852.39$756
Feb 2023029575.112.47$727
Jan 2023032276.533.39$1,091
Dec 2022031176.415.73$1,782
Nov 2022028285.005.65$1,592
Oct 2022026487.185.86$1,548
Sep 2022020284.888.16$1,649
Aug 2022030394.529.13$2,766
Jul 20220420101.587.54$3,168
Jun 20220403115.097.98$3,215
May 20220415109.378.43$3,500
Apr 20220399104.226.84$2,728
Mar 20220414108.885.08$2,102
Feb 2022039191.054.86$1,900
Jan 2022041981.844.54$1,901
Dec 2021041671.323.90$1,622
Nov 2021040477.435.24$2,116
Oct 2021042479.795.71$2,423
Sep 2021041269.865.35$2,205
Aug 2021043166.024.22$1,819
Jul 2021043270.783.98$1,720
Jun 2021044069.493.38$1,487
May 2021044163.483.02$1,331
Apr 2021042760.362.76$1,178
Mar 2021045861.302.72$1,244
Feb 2021042857.805.55$2,375
Jan 2021046250.412.81$1,298
Dec 2020048644.642.68$1,300
Nov 2020043238.772.71$1,169
Oct 2020045436.972.48$1,125
Sep 2020043837.091.99$872
Aug 2020046239.982.39$1,102
Jul 2020046738.371.83$852
Jun 2020045034.901.69$761
May 2020046816.921.81$849
Apr 2020045414.751.80$819
Mar 2020047330.341.86$878
Feb 2020045349.881.98$897
Jan 2020048657.252.09$1,018
Dec 2019048959.012.30$1,127
Nov 2019047055.302.75$1,293
Oct 2019047653.472.42$1,151
Sep 2019048155.052.66$1,278
Aug 2019050753.112.30$1,168
Jul 2019052656.272.46$1,294
Jun 2019050452.782.49$1,256
May 2019052958.482.74$1,450
Apr 2019050462.632.75$1,386
Mar 2019051656.803.06$1,580
Feb 2019047650.852.79$1,329
Jan 2019053646.033.23$1,730
Dec 2018047946.594.19$2,005
Nov 2018054652.934.24$2,314
Oct 2018057561.443.40$1,954
Sep 2018054659.543.11$1,697
Aug 2018057359.403.07$1,757
Jul 2018060165.142.93$1,762
Jun 2018061260.183.08$1,883
May 2018078565.382.90$2,277
Apr 2018049163.842.90$1,424
Mar 2018050861.222.79$1,416
Feb 2018043261.782.77$1,195
Jan 2018049662.874.01$1,989
Dec 2017049057.272.92$1,432
Nov 2017149155.423.12$1,587
Oct 2017051949.292.98$1,549
Sep 2017051747.523.09$1,596
Aug 2017156445.373.00$1,740
Jul 2017058843.873.09$1,815
Jun 2017155142.493.09$1,744
May 2017055045.373.26$1,795
Apr 2017053447.933.21$1,715
Mar 2017156646.772.98$1,736
Feb 2017152550.452.95$1,601
Jan 2017059749.413.42$2,041
Dec 2016056248.763.72$2,092
Nov 2016055242.492.64$1,460
Oct 2016056646.193.09$1,749
Sep 2016055441.553.10$1,718
Aug 2016058241.442.92$1,702
Jul 2016057941.622.92$1,693
Jun 2016055145.352.69$1,480
May 2016060242.521.99$1,199
Apr 2016058436.561.99$1,163
Mar 2016161433.011.79$1,135
Feb 2016059926.472.06$1,236
Jan 2016064027.352.36$1,513
Dec 2015055532.362.00$1,111
Nov 2015053938.792.17$1,168
Oct 2015056343.552.43$1,366
Sep 2015153842.992.76$1,527
Aug 2015058740.162.87$1,686
Jul 2015055848.152.95$1,643
Jun 2015055056.152.88$1,586
May 2015058855.212.96$1,738
Apr 2015057749.822.71$1,562
Mar 2015057642.892.93$1,690
Feb 2015057044.662.98$1,696
Jan 2015065643.433.10$2,034
Dec 2014059854.693.59$2,148
Nov 2014058070.464.25$2,466
Oct 2014067778.303.90$2,641
Sep 2014067386.164.05$2,723
Aug 2014062789.394.04$2,530
Jul 2014062996.564.18$2,629
Jun 2014064098.164.74$3,032
May 2014064794.734.73$3,058
Apr 2014059995.944.81$2,881
Mar 2014065695.895.06$3,317
Feb 2014060697.406.19$3,752
Jan 2014063790.404.86$3,096
Dec 2013069291.824.35$3,013
Nov 2013070888.853.74$2,647
Oct 2013072797.423.78$2,748
Sep 20130651104.113.72$2,420
Aug 20130633104.253.52$2,230
Jul 20130587102.523.72$2,182
Jun 2013053194.403.93$2,089
May 2013062394.834.15$2,585
Apr 2013066793.964.28$2,856
Mar 2013067693.623.91$2,645
Feb 2013061191.233.42$2,090
Jan 2013070991.603.42$2,425
Dec 2012069786.773.42$2,384
Nov 2012067286.953.62$2,436
Oct 2012064089.383.40$2,176
Sep 2012061194.672.92$1,783
Aug 2012066392.662.91$1,928
Jul 2012065585.133.02$1,979
Jun 2012068079.822.52$1,713
May 2012073291.612.49$1,821
Apr 20120734101.652.00$1,466
Mar 20120750105.052.22$1,667
Feb 20120721101.102.57$1,853
Jan 2012081498.092.73$2,226
Dec 2011081996.873.24$2,653
Nov 2011074595.723.31$2,467
Oct 2011075484.983.65$2,751
Sep 2011072483.623.99$2,886
Aug 2011073783.404.15$3,058
Jul 2011072594.144.52$3,275
Jun 2011069292.904.64$3,211
May 2011082598.134.40$3,634
Apr 20110809105.964.33$3,506
Mar 2011091796.364.06$3,721
Feb 2011078785.644.18$3,290
Jan 2011087086.504.59$3,992
Dec 2010088485.734.35$3,843
Nov 2010084880.843.80$3,218
Oct 2010081578.103.51$2,860
Sep 2010088272.633.98$3,510
Aug 2010091873.684.42$4,057
Jul 2010089172.554.74$4,220
Jun 2010088070.364.91$4,321
May 2010093871.124.24$3,973
Apr 2010089381.694.12$3,682
Mar 2010091078.394.39$3,994
Feb 2010084473.585.44$4,593
Jan 2010099974.365.96$5,958
Dec 200901,01371.445.48$5,555
Nov 200901,10874.593.75$4,157
Oct 2009088472.544.11$3,633
Sep 2009079965.543.06$2,449
Aug 2009083667.423.22$2,691
Jul 2009083761.133.46$2,900
Jun 2009086566.163.90$3,369
May 2009095754.743.93$3,757
Apr 200901,01846.773.59$3,652
Mar 200901,03742.144.06$4,209
Feb 2009097832.814.63$4,531
Jan 200901,12035.865.37$6,016
Dec 200801,12037.105.98$6,694
Nov 200801,09555.496.86$7,512
Oct 200801,12175.246.92$7,760
Sep 200801,124101.767.88$8,854
Aug 200801,134114.228.48$9,620
Jul 200801,181131.0811.39$13,451
Jun 200801,110131.3313.03$14,466
May 200801,150123.1711.57$13,310
Apr 200801,131110.3110.45$11,824
Mar 200801,179101.909.66$11,394
Feb 200801,16992.538.77$10,253
Jan 200801,26590.388.21$10,380
Dec 200701,33188.337.30$9,719
Nov 200701,27891.677.29$9,319
Oct 200701,34382.856.92$9,296
Sep 200701,31875.846.24$8,230
Aug 200701,39669.066.39$8,918
Jul 200701,44070.906.39$9,199
Jun 200701,35662.007.55$10,236
May 200701,44558.747.85$11,338
Apr 200701,43159.617.81$11,169
Mar 200701,53056.927.30$11,172
Feb 200701,36555.108.22$11,215
Jan 200701,61350.306.73$10,850
Dec 200601,48256.656.92$10,253
Nov 200601,39154.207.62$10,596
Oct 200601,48154.906.01$8,906
Sep 200601,44660.085.04$7,284
Aug 200601,53268.717.34$11,245
Jul 200601,50769.376.34$9,559
Jun 200601,54066.286.38$9,831
May 200601,58066.016.42$10,152
Apr 200601,58764.397.36$11,681
Mar 200601,72656.707.08$12,225
Feb 200601,66457.597.75$12,898
Jan 200601,70260.598.93$15,205
Dec 200501,64654.9413.42$22,082
Nov 200501,83354.6910.59$19,409
Oct 200501,90958.3413.80$26,336
Sep 200501,90161.4512.08$22,962
Aug 200502,03761.519.80$19,956
Jul 200502,01355.697.84$15,789
Jun 200502,06352.337.38$15,227
May 200502,26745.226.65$15,078
Apr 200502,06149.207.36$15,170
Mar 200502,37150.377.15$16,964
Feb 200502,20645.226.31$13,924
Jan 200502,63243.166.32$16,640
Dec 200402,63539.866.75$17,789
Nov 200402,42745.286.33$15,364
Oct 200402,65649.706.52$17,304
Sep 200403,06043.245.28$16,169
Aug 200403,29942.375.55$18,312
Jul 200403,99738.286.08$24,318
Jun 200403,91236.106.43$25,166
May 200404,50237.486.49$29,239
Apr 200405,33634.475.86$31,261
Mar 200403,82734.365.53$21,164

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   63 Mcf  × $  3.05 =       $192

────────────────────────────────────────────────────
Month total                                     $192

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/204845 is the state's own key, not one this site invented.