Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205029District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$872 k
Nov 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
271
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-06-08156907
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4 bbl$173
GasProduction133,185 Mcf$871,699
Total$871,872

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3355, -100.4907. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.33552, -100.49070 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,555 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,555 ft.

Completions filed
Nov 2003
1 of 1 wells

1 well

42-435365161069S5,555 ftNov 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (271)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

271 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240179.932.15$2
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230185.443.09$3
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230172.852.39$2
Feb 20230075.112.47$0
Jan 20230176.533.39$3
Dec 20220076.415.73$0
Nov 20220185.005.65$6
Oct 20220787.185.86$41
Sep 20220284.888.16$16
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220181.844.54$5
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190158.482.74$3
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180361.443.40$10
Sep 20180059.543.11$0
Aug 20180259.403.07$6
Jul 20180365.142.93$9
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180763.842.90$20
Mar 20180061.222.79$0
Feb 20180961.782.77$25
Jan 2018016362.874.01$654
Dec 20170557.272.92$15
Nov 2017015155.423.12$471
Oct 201701949.292.98$57
Sep 2017013147.523.09$404
Aug 2017017045.373.00$511
Jul 2017017043.873.09$525
Jun 201702342.493.09$71
May 2017053345.373.26$1,739
Apr 2017015447.933.21$495
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160146.193.09$3
Sep 20160441.553.10$12
Aug 20160441.442.92$12
Jul 20160241.622.92$6
Jun 2016028445.352.69$763
May 201606642.521.99$131
Apr 2016010536.561.99$209
Mar 20160333.011.79$5
Feb 2016011626.472.06$239
Jan 201604127.352.36$97
Dec 2015017032.362.00$340
Nov 20150038.792.17$0
Oct 20150143.552.43$2
Sep 20150142.992.76$3
Aug 20150040.162.87$0
Jul 20150148.152.95$3
Jun 20150456.152.88$12
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 201502944.662.98$86
Jan 201507643.433.10$236
Dec 201407854.693.59$280
Nov 201407770.464.25$327
Oct 201407978.303.90$308
Sep 201407986.164.05$320
Aug 201408089.394.04$323
Jul 201408096.564.18$334
Jun 201407898.164.74$369
May 201408294.734.73$388
Apr 201408095.944.81$385
Mar 201408495.895.06$425
Feb 201407397.406.19$452
Jan 201408490.404.86$408
Dec 201308391.824.35$361
Nov 201308488.853.74$314
Oct 201308897.423.78$333
Sep 2013086104.113.72$320
Aug 2013089104.253.52$314
Jul 2013090102.523.72$335
Jun 201308794.403.93$342
May 201309194.834.15$378
Apr 201308893.964.28$377
Mar 201309393.623.91$364
Feb 201308591.233.42$291
Jan 201309591.603.42$325
Dec 2012010286.773.42$349
Nov 2012012086.953.62$435
Oct 2012017589.383.40$595
Sep 2012014694.672.92$426
Aug 201206692.662.91$192
Jul 2012029585.133.02$891
Jun 201206379.822.52$159
May 201205791.612.49$142
Apr 2012036101.652.00$72
Mar 2012043105.052.22$96
Feb 2012027101.102.57$69
Jan 201206398.092.73$172
Dec 201105596.873.24$178
Nov 201104095.723.31$132
Oct 20110084.983.65$0
Sep 201106383.623.99$251
Aug 2011015083.404.15$622
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201106105.964.33$26
Mar 201104396.364.06$174
Feb 201101085.644.18$42
Jan 201103886.504.59$174
Dec 20100385.734.35$13
Nov 201003380.843.80$125
Oct 20100178.103.51$4
Sep 20100072.633.98$0
Aug 2010034273.684.42$1,511
Jul 2010030172.554.74$1,426
Jun 2010071970.364.91$3,531
May 2010076071.124.24$3,219
Apr 2010086181.694.12$3,550
Mar 2010090978.394.39$3,989
Feb 2010070373.585.44$3,826
Jan 2010088074.365.96$5,248
Dec 2009090771.445.48$4,974
Nov 2009080574.593.75$3,020
Oct 2009097772.544.11$4,016
Sep 200901,16565.543.06$3,570
Aug 200901,16667.423.22$3,753
Jul 200901,00961.133.46$3,496
Jun 2009096266.163.90$3,747
May 200901,06354.743.93$4,173
Apr 2009084746.773.59$3,039
Mar 2009087642.144.06$3,556
Feb 2009079932.814.63$3,702
Jan 2009066435.865.37$3,566
Dec 20080037.105.98$0
Nov 20080155.496.86$7
Oct 2008016775.246.92$1,156
Sep 200801,250101.767.88$9,846
Aug 20080901114.228.48$7,643
Jul 20080404131.0811.39$4,601
Jun 200801,137131.3313.03$14,818
May 20080194123.1711.57$2,245
Apr 200805110.3110.45$52
Mar 200807101.909.66$68
Feb 200801592.538.77$132
Jan 2008042090.388.21$3,446
Dec 200701,12688.337.30$8,222
Nov 200701,63491.677.29$11,915
Oct 2007099082.856.92$6,853
Sep 200701,02875.846.24$6,419
Aug 2007039569.066.39$2,523
Jul 2007068870.906.39$4,395
Jun 2007076062.007.55$5,737
May 200701,53258.747.85$12,021
Apr 200701,68159.617.81$13,121
Mar 200701,49256.927.30$10,895
Feb 2007094655.108.22$7,772
Jan 200701,46550.306.73$9,855
Dec 200601,56256.656.92$10,807
Nov 2006099754.207.62$7,595
Oct 200601,19054.906.01$7,156
Sep 2006047960.085.04$2,413
Aug 200601,07868.717.34$7,912
Jul 2006072469.376.34$4,592
Jun 200601,06066.286.38$6,767
May 200601,27366.016.42$8,179
Apr 200601,18964.397.36$8,752
Mar 200601,35756.707.08$9,612
Feb 200601,36157.597.75$10,549
Jan 200601,74160.598.93$15,553
Dec 200501,98554.9413.42$26,630
Nov 200502,01454.6910.59$21,325
Oct 200502,06758.3413.80$28,516
Sep 200502,22361.4512.08$26,852
Aug 200502,27261.519.80$22,258
Jul 200502,05155.697.84$16,087
Jun 200501,70252.337.38$12,563
May 200502,41045.226.65$16,029
Apr 200501,63649.207.36$12,042
Mar 200502,52950.377.15$18,095
Feb 200501,94845.226.31$12,296
Jan 200543,00343.166.32$19,158
Dec 200401,34039.866.75$9,046
Nov 200401,02345.286.33$6,476
Oct 200401,97749.706.52$12,880
Sep 200402,15443.245.28$11,382
Aug 200402,43842.375.55$13,533
Jul 200402,77338.286.08$16,871
Jun 200402,76236.106.43$17,768
May 200403,18937.486.49$20,711
Apr 200403,48334.475.86$20,405
Mar 200403,94434.365.53$21,811
Feb 200404,47832.455.51$24,672
Jan 200405,89632.036.30$37,143
Dec 200308,54530.266.30$53,848
Nov 200308,26428.804.60$37,974

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 79.93 =         $0
Gas                    1 Mcf  × $  2.15 =         $2

────────────────────────────────────────────────────
Month total                                       $2

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.