CANYON RANCH 115

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205030District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$947 k
Nov 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
271
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-06-08156872
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4 bbl$173
GasProduction145,724 Mcf$946,525
Total$946,698

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3156, -100.4771. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.31561, -100.47710 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,450 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,450 ft.

Completions filed
Nov 2003
1 of 1 wells

1 well

42-4353651912S5,450 ftNov 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (271)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

271 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230578.122.24$11
Mar 202301372.852.39$31
Feb 202301575.112.47$37
Jan 202301376.533.39$44
Dec 202201376.415.73$74
Nov 20220885.005.65$45
Oct 20220787.185.86$41
Sep 20220684.888.16$49
Aug 20220694.529.13$55
Jul 202207101.587.54$53
Jun 202208115.097.98$64
May 202209109.378.43$76
Apr 202209104.226.84$62
Mar 202207108.885.08$36
Feb 20220591.054.86$24
Jan 20220581.844.54$23
Dec 20210771.323.90$27
Nov 20210677.435.24$31
Oct 20210879.795.71$46
Sep 20210869.865.35$43
Aug 20210766.024.22$30
Jul 20210970.783.98$36
Jun 202101069.493.38$34
May 202101163.483.02$33
Apr 202101160.362.76$30
Mar 202101261.302.72$33
Feb 20210757.805.55$39
Jan 20210750.412.81$20
Dec 202001044.642.68$27
Nov 202001138.772.71$30
Oct 202001236.972.48$30
Sep 202001237.091.99$24
Aug 202001239.982.39$29
Jul 202001238.371.83$22
Jun 202001134.901.69$19
May 202001216.921.81$22
Apr 202001014.751.80$18
Mar 202001030.341.86$19
Feb 20200949.881.98$18
Jan 20200957.252.09$19
Dec 20190859.012.30$18
Nov 20190755.302.75$19
Oct 201901053.472.42$24
Sep 201901155.052.66$29
Aug 201901153.112.30$25
Jul 201901256.272.46$30
Jun 201901252.782.49$30
May 201901358.482.74$36
Apr 201901162.632.75$30
Mar 201901156.803.06$34
Feb 20190950.852.79$25
Jan 201901046.033.23$32
Dec 201801046.594.19$42
Nov 201801252.934.24$51
Oct 201801361.443.40$44
Sep 201801159.543.11$34
Aug 201801359.403.07$40
Jul 201801465.142.93$41
Jun 201801260.183.08$37
May 201801365.382.90$38
Apr 201801263.842.90$35
Mar 201801061.222.79$28
Feb 20180961.782.77$25
Jan 201801062.874.01$40
Dec 201701157.272.92$32
Nov 201701155.423.12$34
Oct 201701049.292.98$30
Sep 201701047.523.09$31
Aug 201701145.373.00$33
Jul 201701143.873.09$34
Jun 20170942.493.09$28
May 20170445.373.26$13
Apr 20170647.933.21$19
Mar 20170646.772.98$18
Feb 20170150.452.95$3
Jan 20170149.413.42$3
Dec 20160148.763.72$4
Nov 20160142.492.64$3
Oct 20160146.193.09$3
Sep 20160141.553.10$3
Aug 20160241.442.92$6
Jul 201602241.622.92$64
Jun 201604045.352.69$107
May 201606242.521.99$123
Apr 201608036.561.99$159
Mar 2016010833.011.79$194
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 201501756.152.88$49
May 201503055.212.96$89
Apr 201503049.822.71$81
Mar 201503242.892.93$94
Feb 201503344.662.98$98
Jan 201506843.433.10$211
Dec 20140054.693.59$0
Nov 20140370.464.25$13
Oct 201403078.303.90$117
Sep 201403186.164.05$125
Aug 201403289.394.04$129
Jul 201403496.564.18$142
Jun 201403398.164.74$156
May 201403594.734.73$165
Apr 201403395.944.81$159
Mar 201403495.895.06$172
Feb 201403297.406.19$198
Jan 201403890.404.86$185
Dec 201304091.824.35$174
Nov 201304088.853.74$150
Oct 201304397.423.78$163
Sep 2013044104.113.72$164
Aug 2013047104.253.52$166
Jul 2013051102.523.72$190
Jun 2013011494.403.93$448
May 20130094.834.15$0
Apr 201307393.964.28$313
Mar 201305293.623.91$203
Feb 201304491.233.42$150
Jan 201306191.603.42$209
Dec 2012022986.773.42$783
Nov 2012056586.953.62$2,048
Oct 2012059989.383.40$2,036
Sep 2012059394.672.92$1,731
Aug 2012061592.662.91$1,789
Jul 2012049285.133.02$1,486
Jun 2012021279.822.52$534
May 2012066991.612.49$1,665
Apr 20120653101.652.00$1,304
Mar 20120757105.052.22$1,682
Feb 20120481101.102.57$1,236
Jan 2012031398.092.73$856
Dec 2011044196.873.24$1,429
Nov 2011074995.723.31$2,480
Oct 2011025184.983.65$916
Sep 2011016883.623.99$670
Aug 2011085083.404.15$3,527
Jul 2011037394.144.52$1,685
Jun 2011019892.904.64$919
May 2011097398.134.40$4,286
Apr 201104105.964.33$17
Mar 20110296.364.06$8
Feb 201102885.644.18$117
Jan 20110686.504.59$28
Dec 2010033185.734.35$1,439
Nov 2010063580.843.80$2,410
Oct 2010064978.103.51$2,277
Sep 2010084472.633.98$3,359
Aug 201001,01773.684.42$4,494
Jul 2010090272.554.74$4,272
Jun 2010089770.364.91$4,405
May 2010089171.124.24$3,774
Apr 2010087581.694.12$3,607
Mar 201001,09078.394.39$4,784
Feb 2010020873.585.44$1,132
Jan 201004674.365.96$274
Dec 20090471.445.48$22
Nov 2009046374.593.75$1,737
Oct 2009093072.544.11$3,823
Sep 2009090365.543.06$2,767
Aug 2009093967.423.22$3,022
Jul 2009094861.133.46$3,284
Jun 2009093366.163.90$3,634
May 200901,05354.743.93$4,134
Apr 2009075046.773.59$2,691
Mar 2009048242.144.06$1,956
Feb 2009047232.814.63$2,187
Jan 2009063235.865.37$3,394
Dec 2008066337.105.98$3,963
Nov 2008083655.496.86$5,735
Oct 2008094675.246.92$6,548
Sep 20080743101.767.88$5,853
Aug 20080433114.228.48$3,673
Jul 20080840131.0811.39$9,567
Jun 20080896131.3313.03$11,677
May 200801,062123.1711.57$12,292
Apr 200801,187110.3110.45$12,410
Mar 20080272101.909.66$2,629
Feb 2008080192.538.77$7,025
Jan 2008073190.388.21$5,998
Dec 200701,22288.337.30$8,923
Nov 200706791.677.29$489
Oct 2007059082.856.92$4,084
Sep 2007077175.846.24$4,814
Aug 2007088669.066.39$5,660
Jul 2007093670.906.39$5,979
Jun 2007079762.007.55$6,016
May 200701,13058.747.85$8,866
Apr 2007082859.617.81$6,463
Mar 200701,20456.927.30$8,792
Feb 200701,15455.108.22$9,481
Jan 200701,34250.306.73$9,027
Dec 200601,56256.656.92$10,807
Nov 200601,47054.207.62$11,198
Oct 200601,53254.906.01$9,213
Sep 200601,48960.085.04$7,500
Aug 200601,42168.717.34$10,430
Jul 200601,43269.376.34$9,083
Jun 200601,27766.286.38$8,152
May 200601,57366.016.42$10,107
Apr 200601,65364.397.36$12,167
Mar 200601,89356.707.08$13,408
Feb 200601,67857.597.75$13,006
Jan 200602,01460.598.93$17,992
Dec 200502,09754.9413.42$28,132
Nov 200501,98254.6910.59$20,986
Oct 200502,02558.3413.80$27,936
Sep 200502,05361.4512.08$24,798
Aug 200502,12461.519.80$20,808
Jul 200502,19055.697.84$17,178
Jun 200502,33852.337.38$17,257
May 200502,56545.226.65$17,060
Apr 200502,56949.207.36$18,909
Mar 200502,74250.377.15$19,619
Feb 200502,55545.226.31$16,127
Jan 200542,94043.166.32$18,760
Dec 200402,86339.866.75$19,328
Nov 200402,20445.286.33$13,952
Oct 200402,93249.706.52$19,102
Sep 200403,11643.245.28$16,465
Aug 200403,04742.375.55$16,913
Jul 200402,11138.286.08$12,844
Jun 200403,08436.106.43$19,839
May 200403,24937.486.49$21,101
Apr 200403,56234.475.86$20,868
Mar 200403,85334.365.53$21,308
Feb 200404,11632.455.51$22,678
Jan 200404,51432.036.30$28,437
Dec 200306,09930.266.30$38,434
Nov 200304,15228.804.60$19,079

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2023 — as filed, then multipliedworked
Condensate             0 bbl  × $ 78.12 =         $0
Gas                    5 Mcf  × $  2.24 =        $11

────────────────────────────────────────────────────
Month total                                      $11

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/205030 is the state's own key, not one this site invented.