MAYER 37

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205097District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$999 k
Sep 2003 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
273
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-03-14156112
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition249 bbl$16,447
GasProduction183,915 Mcf$982,723
Total$999,169

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6167, -100.8008. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.61667, -100.80076 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,250 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,250 ft.

Completions filed
Sep 2003
1 of 1 wells

1 well

42-4353646168,250 ftSep 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (273)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

273 months

May 2026076106.413.05$231
Apr 202609398.932.87$267
Mar 2026010089.753.15$315
Feb 202609163.503.75$341
Jan 2026010259.138.00$816
Dec 2025010956.664.41$481
Nov 2025010558.593.93$412
Oct 2025011359.383.30$373
Sep 2025010462.743.08$320
Aug 2025012263.933.01$368
Jul 2025010966.743.32$361
Jun 2025010566.483.13$329
May 2025010760.553.23$346
Apr 2025010562.363.54$372
Mar 2025010867.704.27$461
Feb 2025010070.884.34$434
Jan 2025010574.324.28$449
Dec 2024010868.993.12$337
Nov 2024010769.052.20$235
Oct 2024011571.372.28$262
Sep 2024010969.612.36$258
Aug 2024011075.632.06$227
Jul 2024110779.932.15$310
Jun 2024010678.082.63$279
May 2024011178.812.20$244
Apr 2024011384.451.66$187
Mar 2024016980.301.55$261
Feb 2024016076.091.78$285
Jan 2024021073.023.30$693
Dec 2023013671.262.61$355
Nov 2023011777.892.81$328
Oct 2023015985.443.09$491
Sep 2023038889.042.74$1,061
Aug 20231683580.522.67$3,520
Jul 202301,06474.852.64$2,811
Jun 202391,14168.962.26$3,198
May 2023045770.622.23$1,018
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 202301775.112.47$42
Jan 2023033576.533.39$1,135
Dec 2022084276.415.73$4,824
Nov 20222682385.005.65$6,857
Oct 2022289187.185.86$5,399
Sep 2022087684.888.16$7,151
Aug 2022493594.529.13$8,912
Jul 20220999101.587.54$7,535
Jun 202201,017115.097.98$8,113
May 20220846109.378.43$7,134
Apr 20220540104.226.84$3,692
Mar 20222254108.885.08$1,507
Feb 2022015291.054.86$739
Jan 2022012881.844.54$581
Dec 2021112171.323.90$543
Nov 2021012177.435.24$634
Oct 2021913279.795.71$1,472
Sep 2021018169.865.35$969
Aug 2021056266.024.22$2,372
Jul 2021079170.783.98$3,150
Jun 2021073969.493.38$2,498
May 2021075763.483.02$2,284
Apr 2021067460.362.76$1,859
Mar 2021027461.302.72$744
Feb 2021047357.805.55$2,624
Jan 2021064150.412.81$1,801
Dec 2020067244.642.68$1,798
Nov 2020064938.772.71$1,757
Oct 2020066636.972.48$1,651
Sep 2020060637.091.99$1,207
Aug 2020066439.982.39$1,584
Jul 2020065438.371.83$1,194
Jun 2020065834.901.69$1,112
May 2020056016.921.81$1,016
Apr 20201114914.751.80$431
Mar 2020011330.341.86$210
Feb 2020024549.881.98$485
Jan 2020033257.252.09$695
Dec 2019057559.012.30$1,325
Nov 2019053555.302.75$1,472
Oct 2019053553.472.42$1,294
Sep 2019068055.052.66$1,807
Aug 2019079253.112.30$1,825
Jul 2019078456.272.46$1,929
Jun 2019063452.782.49$1,579
May 2019068258.482.74$1,869
Apr 2019060962.632.75$1,675
Mar 2019034656.803.06$1,059
Feb 201906850.852.79$190
Jan 201908546.033.23$274
Dec 2018022946.594.19$958
Nov 201806652.934.24$280
Oct 201807661.443.40$258
Sep 201808059.543.11$249
Aug 201808559.403.07$261
Jul 201808765.142.93$255
Jun 201808660.183.08$265
May 201808065.382.90$232
Apr 201806263.842.90$180
Mar 201808861.222.79$245
Feb 201807361.782.77$202
Jan 201808062.874.01$321
Dec 201709157.272.92$266
Nov 201708655.423.12$268
Oct 201708849.292.98$263
Sep 201708447.523.09$259
Aug 201709345.373.00$279
Jul 201709043.873.09$278
Jun 201707042.493.09$216
May 201709245.373.26$300
Apr 201709447.933.21$302
Mar 2017010846.772.98$322
Feb 2017010350.452.95$304
Jan 2017010549.413.42$359
Dec 2016010648.763.72$395
Nov 201609842.492.64$259
Oct 2016010246.193.09$315
Sep 201608641.553.10$267
Aug 201608041.442.92$234
Jul 2016016841.622.92$491
Jun 2016010845.352.69$290
May 2016011442.521.99$227
Apr 2016011136.561.99$221
Mar 2016011533.011.79$206
Feb 2016010226.472.06$210
Jan 2016011227.352.36$265
Dec 2015024432.362.00$488
Nov 2015021538.792.17$466
Oct 201509543.552.43$231
Sep 2015012042.992.76$331
Aug 2015011740.162.87$336
Jul 2015114648.152.95$478
Jun 2015013556.152.88$389
May 2015010755.212.96$316
Apr 201509649.822.71$260
Mar 201509042.892.93$264
Feb 2015111044.662.98$372
Jan 2015022843.433.10$707
Dec 2014019654.693.59$704
Nov 2014010970.464.25$463
Oct 2014010878.303.90$421
Sep 2014012486.164.05$502
Aug 2014011789.394.04$472
Jul 2014011596.564.18$481
Jun 2014011198.164.74$526
May 2014012494.734.73$586
Apr 2014011995.944.81$572
Mar 2014011295.895.06$566
Feb 2014011697.406.19$718
Jan 2014117890.404.86$956
Dec 2013023291.824.35$1,010
Nov 2013019188.853.74$714
Oct 2013015397.423.78$578
Sep 20130147104.113.72$547
Aug 20130156104.253.52$550
Jul 20130156102.523.72$580
Jun 2013015294.403.93$598
May 2013015694.834.15$647
Apr 2013014793.964.28$630
Mar 2013116193.623.91$724
Feb 2013016691.233.42$568
Jan 2013016891.603.42$575
Dec 2012016286.773.42$554
Nov 2012632686.953.62$1,703
Oct 201221,21089.383.40$4,292
Sep 201211,19694.672.92$3,585
Aug 201201,19792.662.91$3,481
Jul 201201,17885.133.02$3,559
Jun 201271,09079.822.52$3,304
May 201201,13091.612.49$2,812
Apr 20120894101.652.00$1,785
Mar 20120808105.052.22$1,795
Feb 20123520101.102.57$1,640
Jan 2012329798.092.73$1,106
Dec 2011015896.873.24$512
Nov 2011162695.723.31$2,169
Oct 2011074284.983.65$2,707
Sep 201101,29583.623.99$5,162
Aug 201131,01083.404.15$4,441
Jul 2011289994.144.52$4,249
Jun 2011063792.904.64$2,956
May 2011440298.134.40$2,163
Apr 20110344105.964.33$1,491
Mar 2011058396.364.06$2,365
Feb 2011036085.644.18$1,505
Jan 2011038986.504.59$1,785
Dec 2010448885.734.35$2,465
Nov 201001,14680.843.80$4,349
Oct 201071,35178.103.51$5,287
Sep 201061,26172.633.98$5,454
Aug 201021,19373.684.42$5,420
Jul 2010193372.554.74$4,492
Jun 2010442370.364.91$2,359
May 201001,14271.124.24$4,837
Apr 201001,44881.694.12$5,970
Mar 201001,09378.394.39$4,797
Feb 201001,03873.585.44$5,649
Jan 2010562274.365.96$4,081
Dec 2009030571.445.48$1,673
Nov 200901,14374.593.75$4,288
Oct 200931,28272.544.11$5,487
Sep 200921,19865.543.06$3,803
Aug 200901,15967.423.22$3,730
Jul 200901,19661.133.46$4,144
Jun 200931,07466.163.90$4,382
May 200901,04454.743.93$4,098
Apr 2009075946.773.59$2,723
Mar 200901,08642.144.06$4,408
Feb 2009090632.814.63$4,198
Jan 2009290335.865.37$4,922
Dec 2008042137.105.98$2,516
Nov 2008083555.496.86$5,728
Oct 2008381075.246.92$5,833
Sep 200801,220101.767.88$9,610
Aug 200801,170114.228.48$9,925
Jul 20081988131.0811.39$11,384
Jun 20080794131.3313.03$10,348
May 20080221123.1711.57$2,558
Apr 20080215110.3110.45$2,248
Mar 20081217101.909.66$2,199
Feb 2008023992.538.77$2,096
Jan 2008036990.388.21$3,028
Dec 2007231788.337.30$2,491
Nov 200752,04991.677.29$15,399
Oct 200702,39282.856.92$16,557
Sep 200702,50275.846.24$15,623
Aug 200721,91569.066.39$12,371
Jul 2007043770.906.39$2,792
Jun 2007359362.007.55$4,662
May 200701,87958.747.85$14,743
Apr 200742,07459.617.81$16,426
Mar 200701,69556.927.30$12,377
Feb 200701,24555.108.22$10,229
Jan 200742,06950.306.73$14,119
Dec 200602,18156.656.92$15,089
Nov 200611,65054.207.62$12,623
Oct 2006031354.906.01$1,882
Sep 2006022760.085.04$1,143
Aug 2006026068.717.34$1,908
Jul 2006020469.376.34$1,294
Jun 2006018866.286.38$1,200
May 2006019766.016.42$1,266
Apr 2006018864.397.36$1,384
Mar 2006022156.707.08$1,565
Feb 2006020057.597.75$1,550
Jan 2006023060.598.93$2,055
Dec 2005131554.9413.42$4,281
Nov 2005041154.6910.59$4,352
Oct 200531,07558.3413.80$15,005
Sep 200501,07561.4512.08$12,985
Aug 200501,17461.519.80$11,501
Jul 200521,04355.697.84$8,292
Jun 200501,19652.337.38$8,828
May 2005098545.226.65$6,551
Apr 2005172349.207.36$5,371
Mar 2005080850.377.15$5,781
Feb 2005183745.226.31$5,328
Jan 200531,60243.166.32$10,258
Dec 200452,70539.866.75$18,461
Nov 200472,58245.286.33$16,662
Oct 200403,13349.706.52$20,412
Sep 200483,10743.245.28$16,763
Aug 200403,85342.375.55$21,387
Jul 200454,01838.286.08$24,638
Jun 200403,09436.106.43$19,904
May 200473,17837.486.49$20,902
Apr 200473,49934.475.86$20,740
Mar 200403,72534.365.53$20,600
Feb 200463,56032.455.51$19,809
Jan 200403,73832.036.30$23,548
Dec 200372,96730.266.30$18,909
Nov 200303,66228.804.60$16,827
Oct 200345,66928.174.76$27,095
Sep 200303,10526.314.75$14,747

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   76 Mcf  × $  3.05 =       $231

────────────────────────────────────────────────────
Month total                                     $231

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/205097 is the state's own key, not one this site invented.