SUGG "A"

Operated by TRIPLE CROWN RESOURCES, LLC (P-5 870372) in the ELA SUGG (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205142District 7CField 28251700CondensateGasSaveExport
Value, all time
$202 k
Jun 2004 – Aug 2025
Value, last 12 filed months
$0
at the published price for each month
Months reported
255
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 75 leases and 80 wells, and the rule below applies to all of them.

Discovered
1976-06-16
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2002-01-08.

The Commission's schedule remark for this field reads: EL SUGG (WOLFCAMP) FIELD

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition687 bbl$47,154
GasProduction33,318 Mcf$155,230
Total$202,384

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.3588, -101.0831. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.35882, -101.08312 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,200 ft
1 wells filed one
Completion to plug
21.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,200 ft.

Completions filed
Jun 2004
1 of 1 wells
Plug dates filed
Aug 2025
1 of 1 wells

Last completion to plug: a median of 21.2 years across the 1 well that filed both dates, with the middle half between 21.2 years and 21.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2353077038,200 ftJun 2004Aug 2025Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (255)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

255 months

Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 2024140078.082.63$10,931
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20182252.934.24$114
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 201702645.373.00$78
Jul 201707543.873.09$232
Jun 201704242.493.09$130
May 201704845.373.26$157
Apr 201706847.933.21$218
Mar 201704846.772.98$143
Feb 201704550.452.95$133
Jan 201707049.413.42$239
Dec 201604648.763.72$171
Nov 201603942.492.64$103
Oct 201609146.193.09$281
Sep 201606241.553.10$192
Aug 201608241.442.92$240
Jul 201606141.622.92$178
Jun 201607345.352.69$196
May 201605542.521.99$110
Apr 201607236.561.99$143
Mar 201608533.011.79$152
Feb 201605326.472.06$109
Jan 201605627.352.36$132
Dec 201507332.362.00$146
Nov 201507538.792.17$163
Oct 201502443.552.43$58
Sep 20150542.992.76$14
Aug 201504540.162.87$129
Jul 201506448.152.95$188
Jun 201507456.152.88$213
May 201506055.212.96$177
Apr 201507149.822.71$192
Mar 201506342.892.93$185
Feb 201505444.662.98$161
Jan 201505743.433.10$177
Dec 201406954.693.59$248
Nov 201407470.464.25$315
Oct 201407478.303.90$289
Sep 201408586.164.05$344
Aug 201407989.394.04$319
Jul 201406896.564.18$284
Jun 201406298.164.74$294
May 2014010394.734.73$487
Apr 201408495.944.81$404
Mar 20141703895.895.06$16,493
Feb 201404797.406.19$291
Jan 201406490.404.86$311
Dec 201307191.824.35$309
Nov 201308488.853.74$314
Oct 201306697.423.78$249
Sep 2013071104.113.72$264
Aug 2013081104.253.52$285
Jul 2013074102.523.72$275
Jun 201307694.403.93$299
May 201306094.834.15$249
Apr 201307793.964.28$330
Mar 20130993.623.91$35
Feb 201305091.233.42$171
Jan 201308891.603.42$301
Dec 201203986.773.42$133
Nov 201204986.953.62$178
Oct 201205489.383.40$184
Sep 201205994.672.92$172
Aug 201207692.662.91$221
Jul 201208085.133.02$242
Jun 201208379.822.52$209
May 201206191.612.49$152
Apr 2012051101.652.00$102
Mar 20120121105.052.22$269
Feb 20120166101.102.57$427
Jan 2012019898.092.73$541
Dec 2011021096.873.24$680
Nov 2011027995.723.31$924
Oct 2011045084.983.65$1,642
Sep 2011053183.623.99$2,116
Aug 2011058283.404.15$2,415
Jul 2011057494.144.52$2,593
Jun 2011055692.904.64$2,580
May 2011058698.134.40$2,581
Apr 20110563105.964.33$2,440
Mar 2011059596.364.06$2,414
Feb 2011053385.644.18$2,228
Jan 2011049586.504.59$2,271
Dec 2010062885.734.35$2,730
Nov 2010062680.843.80$2,376
Oct 2010065978.103.51$2,312
Sep 2010064172.633.98$2,551
Aug 2010067373.684.42$2,974
Jul 2010068472.554.74$3,240
Jun 2010065170.364.91$3,197
May 2010067071.124.24$2,838
Apr 2010068681.694.12$2,828
Mar 2010071478.394.39$3,134
Feb 2010066273.585.44$3,603
Jan 201016370674.365.96$16,331
Dec 2009073271.445.48$4,014
Nov 2009072974.593.75$2,735
Oct 2009076872.544.11$3,157
Sep 2009076065.543.06$2,329
Aug 2009079467.423.22$2,555
Jul 2009080061.133.46$2,772
Jun 2009079266.163.90$3,085
May 2009083354.743.93$3,270
Apr 2009078446.773.59$2,813
Mar 2009080542.144.06$3,268
Feb 200917772032.814.63$9,143
Jan 2009075935.865.37$4,077
Dec 2008070337.105.98$4,202
Nov 2008060355.496.86$4,137
Oct 2008056975.246.92$3,939
Sep 20080469101.767.88$3,694
Aug 20080265114.228.48$2,248
Jul 20080249131.0811.39$2,836
Jun 20080244131.3313.03$3,180
May 20080183123.1711.57$2,118
Apr 20080129110.3110.45$1,349
Mar 20080168101.909.66$1,624
Feb 200802392.538.77$202
Jan 200803690.388.21$295
Dec 200709888.337.30$716
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060254.207.62$15
Oct 20060354.906.01$18
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060869.376.34$51
Jun 20060066.286.38$0
May 200603266.016.42$206
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060157.597.75$8
Jan 20060160.598.93$9
Dec 20050154.9413.42$13
Nov 20051154.6910.59$65
Oct 20059158.3413.80$539
Sep 200506961.4512.08$833
Aug 20050061.519.80$0
Jul 20050955.697.84$71
Jun 2005252052.337.38$1,456
May 200503845.226.65$253
Apr 200505149.207.36$375
Mar 2005015450.377.15$1,102
Feb 200506845.226.31$429
Jan 2005012743.166.32$803
Dec 200406439.866.75$432
Nov 200407145.286.33$449
Oct 200409549.706.52$619
Sep 2004035743.245.28$1,886
Aug 2004010942.375.55$605
Jul 2004022338.286.08$1,357
Jun 2004028936.106.43$1,859

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2024 — as filed, then multipliedworked
Condensate           140 bbl  × $ 78.08 =    $10,931
Gas                    0 Mcf  × $  2.63 =         $0

────────────────────────────────────────────────────
Month total                                  $10,931

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/205142 is the state's own key, not one this site invented.