SAWYER 129

Operated by ROBERT C. BROWER, LLC (P-5 100445) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205233District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$947 k
Jan 2004 – May 2026
Value, last 12 filed months
$20 k
at the published price for each month
Months reported
269
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-05-09160583
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition409 bbl$25,431
GasProduction188,214 Mcf$922,067
Total$947,498

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5108, -100.7501. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.51077, -100.75013 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,775 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,775 ft.

Completions filed
Jan 2004
1 of 1 wells

1 well

42-43536578126,775 ftJan 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (269)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

269 months

May 202600106.413.05$0
Apr 2026143598.932.87$1,347
Mar 2026150889.753.15$1,690
Feb 2026143563.503.75$1,695
Jan 2026143159.138.00$3,506
Dec 2025148056.664.41$2,175
Nov 2025152258.593.93$2,108
Oct 2025136559.383.30$1,266
Sep 2025138762.743.08$1,254
Aug 2025151563.933.01$1,617
Jul 2025145666.743.32$1,578
Jun 2025148266.483.13$1,575
May 2025151460.553.23$1,722
Apr 2025146362.363.54$1,703
Mar 2025149467.704.27$2,176
Feb 2025145970.884.34$2,063
Jan 2025153274.324.28$2,351
Dec 2024154568.993.12$1,770
Nov 2024150869.052.20$1,186
Oct 2024150671.372.28$1,226
Sep 2024144269.612.36$1,115
Aug 2024145575.632.06$1,015
Jul 2024151779.932.15$1,190
Jun 2024149278.082.63$1,374
May 2024247778.812.20$1,206
Apr 2024247384.451.66$954
Mar 2024549180.301.55$1,160
Feb 2024246176.091.78$974
Jan 2024551173.023.30$2,050
Dec 2023452071.262.61$1,643
Nov 2023241177.892.81$1,310
Oct 2023241585.443.09$1,452
Sep 2023243889.042.74$1,376
Aug 2023244280.522.67$1,342
Jul 2023240774.852.64$1,225
Jun 2023234168.962.26$908
May 2023037870.622.23$842
Apr 2023232078.122.24$872
Mar 2023539772.852.39$1,314
Feb 2023053275.112.47$1,312
Jan 20236076.533.39$459
Dec 2022449576.415.73$3,142
Nov 2022476085.005.65$4,631
Oct 2022477587.185.86$4,893
Sep 2022575284.888.16$6,563
Aug 202251,40894.529.13$13,324
Jul 202241,070101.587.54$8,476
Jun 20224965115.097.98$8,158
May 20228926109.378.43$8,684
Apr 20224888104.226.84$6,489
Mar 20228986108.885.08$5,876
Feb 2022377891.054.86$4,053
Jan 2022035381.844.54$1,602
Dec 2021211371.323.90$583
Nov 2021432877.435.24$2,027
Oct 2021245679.795.71$2,765
Sep 2021248069.865.35$2,708
Aug 2021343366.024.22$2,026
Jul 2021242270.783.98$1,822
Jun 2021241769.493.38$1,549
May 2021253963.483.02$1,753
Apr 2021462960.362.76$1,976
Mar 2021787861.302.72$2,815
Feb 2021084757.805.55$4,699
Jan 2021022750.412.81$638
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 2020450414.751.80$968
Mar 2020569430.341.86$1,440
Feb 2020466349.881.98$1,513
Jan 2020243757.252.09$1,030
Dec 2019120959.012.30$541
Nov 2019116355.302.75$504
Oct 2019117853.472.42$484
Sep 2019220655.052.66$658
Aug 2019268653.112.30$1,687
Jul 2019268456.272.46$1,795
Jun 2019265652.782.49$1,740
May 2019269358.482.74$2,016
Apr 2019168962.632.75$1,958
Mar 2019063356.803.06$1,938
Feb 2019052650.852.79$1,469
Jan 2019159746.033.23$1,973
Dec 2018067646.594.19$2,829
Nov 2018250652.934.24$2,250
Oct 2018036661.443.40$1,244
Sep 2018144359.543.11$1,436
Aug 2018064959.403.07$1,990
Jul 2018060165.142.93$1,762
Jun 2018065060.183.08$2,000
May 2018071165.382.90$2,062
Apr 2018065163.842.90$1,888
Mar 2018051561.222.79$1,435
Feb 2018049361.782.77$1,364
Jan 2018041662.874.01$1,668
Dec 2017058057.272.92$1,694
Nov 2017050055.423.12$1,559
Oct 2017048049.292.98$1,432
Sep 2017147047.523.09$1,499
Aug 2017151445.373.00$1,590
Jul 2017053443.873.09$1,649
Jun 2017151442.493.09$1,629
May 2017061845.373.26$2,017
Apr 2017034847.933.21$1,118
Mar 2017034846.772.98$1,038
Feb 2017027050.452.95$797
Jan 2017031549.413.42$1,077
Dec 2016047348.763.72$1,761
Nov 2016032642.492.64$862
Oct 2016040846.193.09$1,261
Sep 2016039541.553.10$1,225
Aug 2016038341.442.92$1,120
Jul 2016037841.622.92$1,105
Jun 2016038145.352.69$1,023
May 2016030842.521.99$613
Apr 2016018936.561.99$376
Mar 2016063433.011.79$1,137
Feb 2016061126.472.06$1,261
Jan 2016068427.352.36$1,617
Dec 2015072032.362.00$1,441
Nov 2015069438.792.17$1,504
Oct 2015067643.552.43$1,640
Sep 2015090242.992.76$2,488
Aug 2015085040.162.87$2,442
Jul 2015077148.152.95$2,271
Jun 2015090156.152.88$2,597
May 2015095955.212.96$2,834
Apr 2015093949.822.71$2,541
Mar 201501,01142.892.93$2,967
Feb 2015089644.662.98$2,667
Jan 2015085543.433.10$2,651
Dec 2014081254.693.59$2,916
Nov 2014090870.464.25$3,861
Oct 2014076678.303.90$2,988
Sep 2014068486.164.05$2,767
Aug 2014077389.394.04$3,119
Jul 2014075996.564.18$3,172
Jun 2014066198.164.74$3,131
May 2014083494.734.73$3,942
Apr 2014082295.944.81$3,953
Mar 2014085195.895.06$4,303
Feb 2014075597.406.19$4,675
Jan 2014072390.404.86$3,514
Dec 2013072291.824.35$3,144
Nov 2013078088.853.74$2,916
Oct 2013091297.423.78$3,447
Sep 20130566104.113.72$2,104
Aug 20130823104.253.52$2,899
Jul 20130836102.523.72$3,108
Jun 2013065494.403.93$2,572
May 2013091294.834.15$3,784
Apr 2013071393.964.28$3,053
Mar 2013071093.623.91$2,778
Feb 2013067191.233.42$2,295
Jan 2013081091.603.42$2,770
Dec 2012071486.773.42$2,442
Nov 2012078586.953.62$2,846
Oct 2012073289.383.40$2,489
Sep 2012077994.672.92$2,273
Aug 2012077692.662.91$2,257
Jul 2012086185.133.02$2,601
Jun 2012077679.822.52$1,955
May 2012083991.612.49$2,088
Apr 20120722101.652.00$1,442
Mar 20120870105.052.22$1,933
Feb 20120702101.102.57$1,804
Jan 2012083398.092.73$2,277
Dec 2011082596.873.24$2,673
Nov 2011071695.723.31$2,371
Oct 2011080784.983.65$2,944
Sep 2011089983.623.99$3,583
Aug 2011094083.404.15$3,900
Jul 2011091594.144.52$4,133
Jun 2011068092.904.64$3,155
May 2011089898.134.40$3,956
Apr 20110784105.964.33$3,397
Mar 2011095596.364.06$3,875
Feb 2011067085.644.18$2,801
Jan 2011067486.504.59$3,093
Dec 2010095985.734.35$4,169
Nov 2010087980.843.80$3,336
Oct 2010074978.103.51$2,628
Sep 2010073772.633.98$2,933
Aug 2010073073.684.42$3,226
Jul 2010081072.554.74$3,837
Jun 2010059270.364.91$2,907
May 2010089271.124.24$3,778
Apr 2010082381.694.12$3,393
Mar 2010070978.394.39$3,112
Feb 2010073073.585.44$3,973
Jan 2010080874.365.96$4,819
Dec 200901,00871.445.48$5,528
Nov 200941,17474.593.75$4,703
Oct 2009481872.544.11$3,652
Sep 2009099965.543.06$3,062
Aug 2009094667.423.22$3,045
Jul 2009156761.133.46$2,026
Jun 2009054566.163.90$2,123
May 2009262854.743.93$2,575
Apr 2009162746.773.59$2,296
Mar 2009163142.144.06$2,603
Feb 2009148832.814.63$2,294
Jan 2009359535.865.37$3,303
Dec 2008061537.105.98$3,676
Nov 2008254855.496.86$3,870
Oct 2008570775.246.92$5,270
Sep 20082472101.767.88$3,922
Aug 20081864114.228.48$7,444
Jul 20081903131.0811.39$10,416
Jun 20080587131.3313.03$7,650
May 20081788123.1711.57$9,244
Apr 20082834110.3110.45$8,940
Mar 20080552101.909.66$5,335
Feb 2008066192.538.77$5,797
Jan 2008131890.388.21$2,700
Dec 2007069788.337.30$5,089
Nov 2007064991.677.29$4,732
Oct 2007166482.856.92$4,679
Sep 2007060375.846.24$3,765
Aug 2007077269.066.39$4,931
Jul 2007049070.906.39$3,130
Jun 2007064362.007.55$4,854
May 2007048758.747.85$3,821
Apr 2007243459.617.81$3,507
Mar 2007160756.927.30$4,489
Feb 2007240155.108.22$3,405
Jan 2007269450.306.73$4,769
Dec 2006489956.656.92$6,446
Nov 2006297354.207.62$7,520
Oct 2006252954.906.01$3,291
Sep 2006173460.085.04$3,757
Aug 2006146468.717.34$3,474
Jul 2006041169.376.34$2,607
Jun 2006353266.286.38$3,595
May 2006176666.016.42$4,988
Apr 2006374364.397.36$5,662
Mar 2006350656.707.08$3,754
Feb 2006446857.597.75$3,858
Jan 2006793260.598.93$8,750
Dec 2005589554.9413.42$12,281
Nov 2005770654.6910.59$7,858
Oct 2005393958.3413.80$13,129
Sep 2005281061.4512.08$9,907
Aug 2005487761.519.80$8,838
Jul 200551,18455.697.84$9,565
Jun 200551,54852.337.38$11,688
May 200541,46845.226.65$9,945
Apr 200571,16049.207.36$8,883
Mar 200581,72050.377.15$12,709
Feb 200581,36945.226.31$9,003
Jan 2005131,80743.166.32$11,985
Dec 200471,49839.866.75$10,392
Nov 200471,44845.286.33$9,483
Oct 2004111,61049.706.52$11,036
Sep 200461,95243.245.28$10,574
Aug 200472,36342.375.55$13,413
Jul 2004112,45038.286.08$15,327
Jun 200422,51436.106.43$16,245
May 2004102,47337.486.49$16,436
Apr 2004132,82634.475.86$17,004
Mar 200463,86034.365.53$21,553
Feb 200402,02632.455.51$11,162
Jan 200409932.036.30$624

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             1 bbl  × $ 98.93 =        $99
Gas                  435 Mcf  × $  2.87 =     $1,248

────────────────────────────────────────────────────
Month total                                   $1,347

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/205233 is the state's own key, not one this site invented.