Operated by ROBERT C. BROWER, LLC (P-5 100445) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205236District 7CField 812673332 tax incentive programmesGasSaveExport
Value, all time
$61 k
Dec 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
270
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-11-30160584
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction9,640 Mcf$60,532
Total$60,532

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3933, -100.6694. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.39330, -100.66945 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,350 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,350 ft.

Completions filed
Dec 2003
1 of 1 wells

1 well

42-4353659156,350 ftDec 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (270)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

270 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 2016042.521.99$0
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 2015042.992.76$0
Aug 2015040.162.87$0
Jul 2015048.152.95$0
Jun 2015056.152.88$0
May 2015055.212.96$0
Apr 2015049.822.71$0
Mar 2015042.892.93$0
Feb 2015044.662.98$0
Jan 2015043.433.10$0
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 2014086.164.05$0
Aug 2014089.394.04$0
Jul 2014096.564.18$0
Jun 2014098.164.74$0
May 2014094.734.73$0
Apr 2014095.944.81$0
Mar 2014095.895.06$0
Feb 2014097.406.19$0
Jan 2014090.404.86$0
Dec 2013091.824.35$0
Nov 2013088.853.74$0
Oct 2013097.423.78$0
Sep 20130104.113.72$0
Aug 20131104.253.52$4
Jul 201319102.523.72$71
Jun 20132094.403.93$79
May 20132794.834.15$112
Apr 20131593.964.28$64
Mar 20131893.623.91$70
Feb 2013291.233.42$7
Jan 2013091.603.42$0
Dec 2012286.773.42$7
Nov 2012086.953.62$0
Oct 20122089.383.40$68
Sep 20122194.672.92$61
Aug 20122292.662.91$64
Jul 2012185.133.02$3
Jun 2012879.822.52$20
May 2012091.612.49$0
Apr 201224101.652.00$48
Mar 201218105.052.22$40
Feb 201226101.102.57$67
Jan 20123698.092.73$98
Dec 20113296.873.24$104
Nov 20113695.723.31$119
Oct 20113884.983.65$139
Sep 20113783.623.99$147
Aug 20113183.404.15$129
Jul 20113294.144.52$145
Jun 20114492.904.64$204
May 20111298.134.40$53
Apr 20110105.964.33$0
Mar 2011996.364.06$37
Feb 2011085.644.18$0
Jan 2011386.504.59$14
Dec 20101585.734.35$65
Nov 2010080.843.80$0
Oct 2010078.103.51$0
Sep 2010072.633.98$0
Aug 2010073.684.42$0
Jul 2010072.554.74$0
Jun 2010070.364.91$0
May 2010071.124.24$0
Apr 2010081.694.12$0
Mar 2010078.394.39$0
Feb 2010073.585.44$0
Jan 2010074.365.96$0
Dec 2009071.445.48$0
Nov 2009074.593.75$0
Oct 2009172.544.11$4
Sep 2009665.543.06$18
Aug 2009767.423.22$23
Jul 20091261.133.46$42
Jun 20095766.163.90$222
May 20092054.743.93$79
Apr 2009846.773.59$29
Mar 20091042.144.06$41
Feb 20091232.814.63$56
Jan 20091635.865.37$86
Dec 20082137.105.98$126
Nov 20081555.496.86$103
Oct 20081275.246.92$83
Sep 200816101.767.88$126
Aug 200829114.228.48$246
Jul 200852131.0811.39$592
Jun 200811131.3313.03$143
May 200882123.1711.57$949
Apr 200816110.3110.45$167
Mar 200812101.909.66$116
Feb 20081492.538.77$123
Jan 20081090.388.21$82
Dec 20071188.337.30$80
Nov 20071391.677.29$95
Oct 20072182.856.92$145
Sep 20073575.846.24$219
Aug 20073269.066.39$204
Jul 20071570.906.39$96
Jun 20071562.007.55$113
May 20072958.747.85$228
Apr 20071959.617.81$148
Mar 20074056.927.30$292
Feb 20072555.108.22$205
Jan 20072850.306.73$188
Dec 20062356.656.92$159
Nov 20062854.207.62$213
Oct 20062054.906.01$120
Sep 200642960.085.04$2,161
Aug 2006468.717.34$29
Jul 2006069.376.34$0
Jun 2006766.286.38$45
May 20061666.016.42$103
Apr 20063264.397.36$236
Mar 20062556.707.08$177
Feb 20061857.597.75$140
Jan 20063860.598.93$339
Dec 20052854.9413.42$376
Nov 20052354.6910.59$244
Oct 20053058.3413.80$414
Sep 20051461.4512.08$169
Aug 20052661.519.80$255
Jul 20051555.697.84$118
Jun 20052252.337.38$162
May 20052045.226.65$133
Apr 20052349.207.36$169
Mar 20052150.377.15$150
Feb 20055345.226.31$335
Jan 20055243.166.32$329
Dec 20041239.866.75$81
Nov 20046,64045.286.33$42,034
Oct 20041349.706.52$85
Sep 20041143.245.28$58
Aug 20048542.375.55$472
Jul 20043438.286.08$207
Jun 20048136.106.43$521
May 20044637.486.49$299
Apr 200446034.475.86$2,695
Mar 2004034.365.53$0
Feb 2004032.455.51$0
Jan 2004032.036.30$0
Dec 2003030.266.30$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2013 — as filed, then multipliedworked
Gas                    1 Mcf  × $  3.52 =         $4

────────────────────────────────────────────────────
Month total                                       $4

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/205236 is the state's own key, not one this site invented.