MAYER, MINNIE H., D-38

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205390District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$746 k
Sep 2003 – May 2026
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
273
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-06-08156582
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition28 bbl$1,289
GasProduction144,872 Mcf$744,924
Total$746,213

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6040, -100.8084. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.60399, -100.80839 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,115 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,115 ft.

Completions filed
Sep 2003
1 of 1 wells

1 well

42-4353646518,115 ftSep 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (273)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

273 months

May 20260160106.413.05$487
Apr 2026015498.932.87$442
Mar 2026016689.753.15$523
Feb 2026014763.503.75$551
Jan 2026025759.138.00$2,055
Dec 2025016056.664.41$706
Nov 2025015658.593.93$613
Oct 2025015359.383.30$506
Sep 2025014762.743.08$452
Aug 2025015063.933.01$452
Jul 2025015966.743.32$527
Jun 2025016866.483.13$526
May 2025018460.553.23$595
Apr 2025018562.363.54$655
Mar 2025018967.704.27$807
Feb 2025016870.884.34$729
Jan 2025018474.324.28$787
Dec 2024017968.993.12$559
Nov 2024017169.052.20$376
Oct 2024016971.372.28$386
Sep 2024016069.612.36$378
Aug 2024016375.632.06$336
Jul 2024017079.932.15$365
Jun 2024017478.082.63$458
May 2024018678.812.20$409
Apr 2024019684.451.66$325
Mar 2024020380.301.55$314
Feb 2024018976.091.78$337
Jan 2024019473.023.30$640
Dec 2023020171.262.61$525
Nov 2023019277.892.81$539
Oct 2023018685.443.09$574
Sep 2023017789.042.74$484
Aug 2023018880.522.67$503
Jul 2023019774.852.64$520
Jun 2023020568.962.26$463
May 2023022270.622.23$494
Apr 2023021078.122.24$470
Mar 2023021272.852.39$507
Feb 2023020575.112.47$505
Jan 2023021476.533.39$725
Dec 2022021876.415.73$1,249
Nov 2022020485.005.65$1,152
Oct 2022020587.185.86$1,202
Sep 2022020284.888.16$1,649
Aug 2022020894.529.13$1,898
Jul 20220214101.587.54$1,614
Jun 20220215115.097.98$1,715
May 20220238109.378.43$2,007
Apr 20220232104.226.84$1,586
Mar 20220234108.885.08$1,188
Feb 2022020691.054.86$1,001
Jan 2022023281.844.54$1,053
Dec 2021023771.323.90$924
Nov 2021022877.435.24$1,194
Oct 2021023179.795.71$1,320
Sep 2021030569.865.35$1,632
Aug 2021022166.024.22$933
Jul 2021023270.783.98$924
Jun 2021022869.493.38$771
May 2021123963.483.02$785
Apr 2021023760.362.76$654
Mar 2021025061.302.72$679
Feb 2021020957.805.55$1,160
Jan 2021025050.412.81$703
Dec 2020024744.642.68$661
Nov 2020024338.772.71$658
Oct 2020025336.972.48$627
Sep 2020025037.091.99$498
Aug 2020026239.982.39$625
Jul 2020026338.371.83$480
Jun 2020025734.901.69$434
May 2020026216.921.81$475
Apr 2020025514.751.80$460
Mar 2020026930.341.86$499
Feb 2020025049.881.98$495
Jan 2020026957.252.09$563
Dec 2019126959.012.30$679
Nov 2019026255.302.75$721
Oct 2019027853.472.42$672
Sep 2019028855.052.66$765
Aug 2019026353.112.30$606
Jul 2019026756.272.46$657
Jun 2019025852.782.49$643
May 2019026758.482.74$732
Apr 2019025562.632.75$701
Mar 2019026456.803.06$808
Feb 2019024150.852.79$673
Jan 2019026246.033.23$846
Dec 2018025946.594.19$1,084
Nov 2018025152.934.24$1,064
Oct 2018026961.443.40$914
Sep 2018026159.543.11$811
Aug 2018027559.403.07$843
Jul 2018027565.142.93$806
Jun 2018026460.183.08$812
May 2018027665.382.90$801
Apr 2018025763.842.90$746
Mar 2018026961.222.79$750
Feb 2018022961.782.77$633
Jan 2018024762.874.01$990
Dec 2017025257.272.92$736
Nov 2017124755.423.12$826
Oct 2017125549.292.98$810
Sep 2017024747.523.09$763
Aug 2017125945.373.00$824
Jul 2017030443.873.09$939
Jun 2017129242.493.09$944
May 2017128345.373.26$969
Apr 2017127447.933.21$928
Mar 2017134246.772.98$1,067
Feb 2017133550.452.95$1,040
Jan 2017137349.413.42$1,325
Dec 2016137548.763.72$1,445
Nov 2016036842.492.64$973
Oct 2016138046.193.09$1,220
Sep 2016136741.553.10$1,179
Aug 2016140541.442.92$1,226
Jul 2016039441.622.92$1,152
Jun 2016137945.352.69$1,063
May 2016039542.521.99$786
Apr 2016138236.561.99$797
Mar 2016139433.011.79$740
Feb 2016136426.472.06$778
Jan 2016139027.352.36$949
Dec 2015137932.362.00$791
Nov 2015135838.792.17$815
Oct 2015138943.552.43$987
Sep 2015138542.992.76$1,105
Aug 2015140440.162.87$1,201
Jul 2015141648.152.95$1,273
Jun 2015040456.152.88$1,165
May 2015046255.212.96$1,365
Apr 2015015849.822.71$428
Mar 2015138242.892.93$1,164
Feb 2015010644.662.98$315
Jan 2015035643.433.10$1,104
Dec 2014023654.693.59$848
Nov 2014034570.464.25$1,467
Oct 2014054278.303.90$2,114
Sep 2014053286.164.05$2,152
Aug 2014053989.394.04$2,175
Jul 2014057096.564.18$2,382
Jun 2014149598.164.74$2,443
May 2014050794.734.73$2,396
Apr 2014048495.944.81$2,328
Mar 2014063995.895.06$3,231
Feb 2014035497.406.19$2,192
Jan 2014056090.404.86$2,722
Dec 2013057491.824.35$2,499
Nov 2013053988.853.74$2,015
Oct 2013060597.423.78$2,287
Sep 20130576104.113.72$2,141
Aug 20130534104.253.52$1,881
Jul 20130551102.523.72$2,048
Jun 2013057094.403.93$2,242
May 2013058094.834.15$2,406
Apr 2013057693.964.28$2,467
Mar 2013060193.623.91$2,352
Feb 2013053791.233.42$1,836
Jan 2013059891.603.42$2,045
Dec 2012059586.773.42$2,035
Nov 2012058286.953.62$2,110
Oct 2012059889.383.40$2,033
Sep 2012058794.672.92$1,713
Aug 2012061792.662.91$1,794
Jul 2012062085.133.02$1,873
Jun 2012059879.822.52$1,506
May 2012062391.612.49$1,550
Apr 20120602101.652.00$1,202
Mar 20120643105.052.22$1,429
Feb 20120603101.102.57$1,550
Jan 2012063998.092.73$1,747
Dec 2011064296.873.24$2,080
Nov 2011062695.723.31$2,073
Oct 2011065684.983.65$2,393
Sep 2011063783.623.99$2,539
Aug 2011067083.404.15$2,780
Jul 2011067094.144.52$3,027
Jun 2011062992.904.64$2,918
May 2011064498.134.40$2,837
Apr 20110643105.964.33$2,786
Mar 2011067696.364.06$2,743
Feb 2011060185.644.18$2,512
Jan 2011066586.504.59$3,052
Dec 2010067785.734.35$2,943
Nov 2010066980.843.80$2,539
Oct 2010068978.103.51$2,418
Sep 2010066672.633.98$2,650
Aug 2010068273.684.42$3,014
Jul 2010070072.554.74$3,316
Jun 2010068570.364.91$3,364
May 2010070971.124.24$3,003
Apr 2010069081.694.12$2,845
Mar 2010072278.394.39$3,169
Feb 2010065473.585.44$3,559
Jan 2010070574.365.96$4,205
Dec 2009071271.445.48$3,904
Nov 2009068974.593.75$2,585
Oct 2009071372.544.11$2,931
Sep 2009069965.543.06$2,142
Aug 2009070567.423.22$2,269
Jul 2009070561.133.46$2,442
Jun 2009068866.163.90$2,680
May 2009073054.743.93$2,866
Apr 2009070046.773.59$2,511
Mar 2009073042.144.06$2,963
Feb 2009067832.814.63$3,141
Jan 2009066035.865.37$3,545
Dec 2008054137.105.98$3,234
Nov 2008053955.496.86$3,698
Oct 2008044275.246.92$3,060
Sep 20080352101.767.88$2,773
Aug 20080366114.228.48$3,105
Jul 20080739131.0811.39$8,417
Jun 20080723131.3313.03$9,423
May 20080755123.1711.57$8,739
Apr 20080728110.3110.45$7,611
Mar 20080785101.909.66$7,586
Feb 2008071692.538.77$6,280
Jan 2008076090.388.21$6,236
Dec 2007075888.337.30$5,535
Nov 2007073991.677.29$5,389
Oct 2007077482.856.92$5,358
Sep 2007075375.846.24$4,702
Aug 2007078469.066.39$5,008
Jul 2007079270.906.39$5,059
Jun 2007078762.007.55$5,941
May 2007082958.747.85$6,505
Apr 2007082759.617.81$6,455
Mar 2007083456.927.30$6,090
Feb 2007074755.108.22$6,137
Jan 2007085850.306.73$5,772
Dec 2006091056.656.92$6,296
Nov 2006081254.207.62$6,185
Oct 2006084854.906.01$5,100
Sep 2006084260.085.04$4,241
Aug 2006091968.717.34$6,745
Jul 2006090269.376.34$5,721
Jun 2006080766.286.38$5,152
May 2006073566.016.42$4,722
Apr 2006065964.397.36$4,851
Mar 2006068256.707.08$4,831
Feb 2006054957.597.75$4,255
Jan 2006068860.598.93$6,146
Dec 2005050654.9413.42$6,788
Nov 2005051854.6910.59$5,485
Oct 2005093558.3413.80$12,899
Sep 2005093961.4512.08$11,342
Aug 2005081761.519.80$8,004
Jul 2005095255.697.84$7,467
Jun 200501,12952.337.38$8,333
May 200501,08345.226.65$7,203
Apr 200501,03249.207.36$7,596
Mar 2005082150.377.15$5,874
Feb 2005064845.226.31$4,090
Jan 2005075443.166.32$4,767
Dec 2004082439.866.75$5,563
Nov 2004094045.286.33$5,951
Oct 200401,19049.706.52$7,753
Sep 200401,37143.245.28$7,244
Aug 200401,21742.375.55$6,755
Jul 200401,13238.286.08$6,887
Jun 200401,29136.106.43$8,305
May 200401,32837.486.49$8,625
Apr 200402,18634.475.86$12,807
Mar 200402,80034.365.53$15,484
Feb 200402,12332.455.51$11,697
Jan 200402,07632.036.30$13,078
Dec 200302,47130.266.30$15,571
Nov 200303,02328.804.60$13,891
Oct 200304,85128.174.76$23,089
Sep 2003070126.314.75$3,329

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  160 Mcf  × $  3.05 =       $487

────────────────────────────────────────────────────
Month total                                     $487

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/205390 is the state's own key, not one this site invented.