FAWCETT, BOBBIE H.

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205391District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$891 k
Dec 2003 – May 2026
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
270
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-06-01156344
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4 bbl$157
GasProduction151,165 Mcf$890,723
Total$890,880

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5569, -100.7800. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.55687, -100.77996 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,305 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,305 ft.

Completions filed
Dec 2003
1 of 1 wells

1 well

42-43536522108,305 ftDec 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (270)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

270 months

May 20260173106.413.05$527
Apr 2026016798.932.87$479
Mar 2026017489.753.15$548
Feb 2026015863.503.75$593
Jan 2026017059.138.00$1,360
Dec 2025017656.664.41$777
Nov 2025017158.593.93$671
Oct 2025017659.383.30$582
Sep 2025017262.743.08$529
Aug 2025017963.933.01$540
Jul 2025018066.743.32$597
Jun 2025017566.483.13$548
May 2025018060.553.23$582
Apr 2025017562.363.54$620
Mar 2025018067.704.27$768
Feb 2025016670.884.34$721
Jan 2025018474.324.28$787
Dec 2024019068.993.12$593
Nov 2024017569.052.20$385
Oct 2024018271.372.28$415
Sep 2024017769.612.36$418
Aug 2024018575.632.06$382
Jul 2024018579.932.15$397
Jun 2024018078.082.63$474
May 2024019078.812.20$418
Apr 2024017084.451.66$282
Mar 2024018780.301.55$289
Feb 2024017476.091.78$310
Jan 2024018373.023.30$603
Dec 2023019071.262.61$496
Nov 2023018177.892.81$508
Oct 2023019385.443.09$596
Sep 2023018689.042.74$509
Aug 2023019180.522.67$511
Jul 2023018674.852.64$491
Jun 2023019068.962.26$429
May 2023019670.622.23$437
Apr 2023018978.122.24$423
Mar 2023019372.852.39$462
Feb 2023017575.112.47$431
Jan 2023019176.533.39$647
Dec 2022019676.415.73$1,123
Nov 2022019385.005.65$1,090
Oct 2022020187.185.86$1,179
Sep 2022019384.888.16$1,576
Aug 2022019994.529.13$1,816
Jul 20220198101.587.54$1,493
Jun 20220193115.097.98$1,540
May 20220202109.378.43$1,703
Apr 20220196104.226.84$1,340
Mar 20220204108.885.08$1,036
Feb 2022018291.054.86$884
Jan 2022020481.844.54$926
Dec 2021020771.323.90$807
Nov 2021020377.435.24$1,063
Oct 2021020879.795.71$1,188
Sep 2021019969.865.35$1,065
Aug 2021020466.024.22$861
Jul 2021020870.783.98$828
Jun 2021020169.493.38$680
May 2021020663.483.02$622
Apr 2021020160.362.76$554
Mar 2021021661.302.72$587
Feb 2021018357.805.55$1,015
Jan 2021019850.412.81$556
Dec 2020020544.642.68$548
Nov 2020019738.772.71$533
Oct 2020021136.972.48$523
Sep 2020020237.091.99$402
Aug 2020020939.982.39$498
Jul 2020020738.371.83$378
Jun 2020020734.901.69$350
May 2020021616.921.81$392
Apr 2020020714.751.80$374
Mar 2020021730.341.86$403
Feb 2020020249.881.98$400
Jan 2020021857.252.09$457
Dec 2019022459.012.30$516
Nov 2019022255.302.75$611
Oct 2019022553.472.42$544
Sep 2019021555.052.66$571
Aug 2019022453.112.30$516
Jul 2019021956.272.46$539
Jun 2019021852.782.49$543
May 2019022658.482.74$619
Apr 2019019662.632.75$539
Mar 2019020556.803.06$628
Feb 2019018650.852.79$519
Jan 2019020146.033.23$649
Dec 2018020746.594.19$866
Nov 2018020152.934.24$852
Oct 2018021061.443.40$714
Sep 2018020759.543.11$643
Aug 2018021359.403.07$653
Jul 2018021165.142.93$619
Jun 2018020960.183.08$643
May 2018023965.382.90$693
Apr 2018022963.842.90$664
Mar 2018024161.222.79$672
Feb 2018021861.782.77$603
Jan 2018022562.874.01$902
Dec 2017024357.272.92$710
Nov 2017024255.423.12$755
Oct 2017025049.292.98$746
Sep 2017024647.523.09$759
Aug 2017025845.373.00$775
Jul 2017025443.873.09$784
Jun 2017024542.493.09$756
May 2017026045.373.26$848
Apr 2017025247.933.21$809
Mar 2017025846.772.98$770
Feb 2017023750.452.95$700
Jan 2017125749.413.42$928
Dec 2016025848.763.72$960
Nov 2016025742.492.64$680
Oct 2016026946.193.09$831
Sep 2016026441.553.10$819
Aug 2016027541.442.92$804
Jul 2016027841.622.92$813
Jun 2016027045.352.69$725
May 2016027842.521.99$554
Apr 2016127336.561.99$580
Mar 2016028333.011.79$508
Feb 2016022526.472.06$464
Jan 2016124127.352.36$597
Dec 2015024932.362.00$498
Nov 2015024238.792.17$524
Oct 2015124343.552.43$633
Sep 2015024242.992.76$668
Aug 2015025140.162.87$721
Jul 2015025148.152.95$739
Jun 2015025856.152.88$744
May 2015026655.212.96$786
Apr 2015026549.822.71$717
Mar 2015027842.892.93$816
Feb 2015022344.662.98$664
Jan 2015028943.433.10$896
Dec 2014029354.693.59$1,052
Nov 2014028770.464.25$1,220
Oct 2014028878.303.90$1,123
Sep 2014028186.164.05$1,137
Aug 2014029589.394.04$1,190
Jul 2014030196.564.18$1,258
Jun 2014031598.164.74$1,492
May 2014032494.734.73$1,531
Apr 2014030395.944.81$1,457
Mar 2014030895.895.06$1,557
Feb 2014026697.406.19$1,647
Jan 2014033290.404.86$1,614
Dec 2013032691.824.35$1,420
Nov 2013032288.853.74$1,204
Oct 2013034097.423.78$1,285
Sep 20130329104.113.72$1,223
Aug 20130345104.253.52$1,215
Jul 20130335102.523.72$1,245
Jun 2013033194.403.93$1,302
May 2013035794.834.15$1,481
Apr 2013035493.964.28$1,516
Mar 2013036993.623.91$1,444
Feb 2013034391.233.42$1,173
Jan 2013039291.603.42$1,341
Dec 2012038586.773.42$1,317
Nov 2012037386.953.62$1,352
Oct 2012039089.383.40$1,326
Sep 2012038394.672.92$1,118
Aug 2012040092.662.91$1,163
Jul 2012040685.133.02$1,226
Jun 2012039979.822.52$1,005
May 2012040491.612.49$1,005
Apr 20120419101.652.00$837
Mar 20120446105.052.22$991
Feb 20120422101.102.57$1,085
Jan 2012046098.092.73$1,258
Dec 2011045996.873.24$1,487
Nov 2011044695.723.31$1,477
Oct 2011047184.983.65$1,718
Sep 2011046583.623.99$1,853
Aug 2011048083.404.15$1,992
Jul 2011047894.144.52$2,159
Jun 2011046592.904.64$2,158
May 2011051198.134.40$2,251
Apr 20110521105.964.33$2,258
Mar 2011052496.364.06$2,126
Feb 2011041585.644.18$1,735
Jan 2011050786.504.59$2,327
Dec 2010051485.734.35$2,235
Nov 2010052880.843.80$2,004
Oct 2010057478.103.51$2,014
Sep 2010054872.633.98$2,181
Aug 2010058273.684.42$2,572
Jul 2010058672.554.74$2,776
Jun 2010056770.364.91$2,784
May 2010067771.124.24$2,867
Apr 2010064281.694.12$2,647
Mar 2010066978.394.39$2,936
Feb 2010062873.585.44$3,418
Jan 2010073074.365.96$4,354
Dec 2009086771.445.48$4,754
Nov 200901,55874.593.75$5,845
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 2009069267.423.22$2,227
Jul 2009074061.133.46$2,564
Jun 2009072866.163.90$2,836
May 2009076554.743.93$3,003
Apr 2009075446.773.59$2,705
Mar 2009077142.144.06$3,129
Feb 2009069532.814.63$3,220
Jan 2009077335.865.37$4,152
Dec 2008082237.105.98$4,913
Nov 2008077255.496.86$5,296
Oct 2008081475.246.92$5,634
Sep 20080800101.767.88$6,302
Aug 20080800114.228.48$6,786
Jul 20080794131.0811.39$9,043
Jun 20080777131.3313.03$10,126
May 20080868123.1711.57$10,046
Apr 20080846110.3110.45$8,845
Mar 20080880101.909.66$8,504
Feb 2008075792.538.77$6,639
Jan 2008087990.388.21$7,213
Dec 2007090288.337.30$6,586
Nov 2007088991.677.29$6,482
Oct 2007091782.856.92$6,347
Sep 2007091675.846.24$5,720
Aug 2007093869.066.39$5,992
Jul 2007097470.906.39$6,222
Jun 2007096362.007.55$7,269
May 200701,00658.747.85$7,893
Apr 2007099559.617.81$7,766
Mar 200701,02656.927.30$7,492
Feb 2007095755.108.22$7,863
Jan 200701,07950.306.73$7,258
Dec 200601,07356.656.92$7,423
Nov 200601,05554.207.62$8,036
Oct 200601,08854.906.01$6,543
Sep 200601,07660.085.04$5,420
Aug 2006045668.717.34$3,347
Jul 2006040669.376.34$2,575
Jun 2006066266.286.38$4,226
May 2006091066.016.42$5,847
Apr 200601,05064.397.36$7,729
Mar 200601,25556.707.08$8,889
Feb 200601,19757.597.75$9,278
Jan 200601,30160.598.93$11,622
Dec 200501,28954.9413.42$17,292
Nov 200501,37854.6910.59$14,591
Oct 200501,45958.3413.80$20,128
Sep 200501,40261.4512.08$16,935
Aug 200508,35861.519.80$81,882
Jul 200501,63855.697.84$12,848
Jun 200501,54052.337.38$11,367
May 200501,68945.226.65$11,234
Apr 200501,30649.207.36$9,613
Mar 2005067450.377.15$4,822
Feb 2005076845.226.31$4,848
Jan 200501,32743.166.32$8,390
Dec 2004061539.866.75$4,152
Nov 200401,01045.286.33$6,394
Oct 200401,74949.706.52$11,395
Sep 200402,83543.245.28$14,980
Aug 200403,78842.375.55$21,026
Jul 200402,50338.286.08$15,229
Jun 200402,17236.106.43$13,973
May 200402,37837.486.49$15,444
Apr 200402,67534.475.86$15,671
Mar 200403,38534.365.53$18,720
Feb 200403,32232.455.51$18,303
Jan 200403,70232.036.30$23,321
Dec 200302,26130.266.30$14,248

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  173 Mcf  × $  3.05 =       $527

────────────────────────────────────────────────────
Month total                                     $527

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/205391 is the state's own key, not one this site invented.