BARTON

Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205411District 7CField 846465002 tax incentive programmesGasSaveExport
Value, all time
$312 k
Jan 2004 – May 2026
Value, last 12 filed months
$781
at the published price for each month
Months reported
269
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-03-14156340
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction54,780 Mcf$312,350
Total$312,350

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6151, -100.7018. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.61508, -100.70177 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,711 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,711 ft.

Completions filed
Jan 2004
1 of 1 wells

1 well

42-43536590177,711 ftJan 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (269)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

269 months

May 202626106.413.05$79
Apr 20262598.932.87$72
Mar 20262689.753.15$82
Feb 2026063.503.75$0
Jan 20262759.138.00$216
Dec 20253056.664.41$132
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 20251363.933.01$39
Jul 20252466.743.32$80
Jun 20252666.483.13$81
May 20253060.553.23$97
Apr 20251362.363.54$46
Mar 20252467.704.27$102
Feb 20252070.884.34$87
Jan 20252674.324.28$111
Dec 20242868.993.12$87
Nov 20243169.052.20$68
Oct 20243571.372.28$80
Sep 20242569.612.36$59
Aug 20243075.632.06$62
Jul 20243179.932.15$67
Jun 20243178.082.63$82
May 20243178.812.20$68
Apr 20242884.451.66$46
Mar 2024180.301.55$2
Feb 2024176.091.78$2
Jan 20242273.023.30$73
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 20231885.443.09$56
Sep 20231689.042.74$44
Aug 20233080.522.67$80
Jul 20232574.852.64$66
Jun 20233168.962.26$70
May 20232970.622.23$65
Apr 20232278.122.24$49
Mar 20233472.852.39$81
Feb 20233275.112.47$79
Jan 20233576.533.39$119
Dec 20223676.415.73$206
Nov 20223485.005.65$192
Oct 20223587.185.86$205
Sep 20223484.888.16$278
Aug 20223594.529.13$319
Jul 202236101.587.54$272
Jun 202229115.097.98$231
May 202235109.378.43$295
Apr 202234104.226.84$232
Mar 202236108.885.08$183
Feb 20223291.054.86$155
Jan 20223681.844.54$163
Dec 20213571.323.90$136
Nov 20213477.435.24$178
Oct 20213679.795.71$206
Sep 20213569.865.35$187
Aug 20213666.024.22$152
Jul 20213670.783.98$143
Jun 20213569.493.38$118
May 20213763.483.02$112
Apr 20213660.362.76$99
Mar 20213761.302.72$101
Feb 20213357.805.55$183
Jan 20214650.412.81$129
Dec 20202944.642.68$78
Nov 20203638.772.71$97
Oct 20203836.972.48$94
Sep 20203737.091.99$74
Aug 20203839.982.39$91
Jul 20204338.371.83$78
Jun 20202634.901.69$44
May 20203416.921.81$62
Apr 20203214.751.80$58
Mar 20203230.341.86$59
Feb 20203149.881.98$61
Jan 20203457.252.09$71
Dec 20193359.012.30$76
Nov 20193355.302.75$91
Oct 20193853.472.42$92
Sep 20194055.052.66$106
Aug 20193753.112.30$85
Jul 20193856.272.46$93
Jun 20193852.782.49$95
May 20193958.482.74$107
Apr 20193862.632.75$105
Mar 20194056.803.06$122
Feb 20193650.852.79$101
Jan 20194046.033.23$129
Dec 20184046.594.19$167
Nov 20183952.934.24$165
Oct 20184061.443.40$136
Sep 20183959.543.11$121
Aug 20184059.403.07$123
Jul 20184065.142.93$117
Jun 20184060.183.08$123
May 20184165.382.90$119
Apr 20184063.842.90$116
Mar 20184261.222.79$117
Feb 20183861.782.77$105
Jan 20184262.874.01$168
Dec 20174257.272.92$123
Nov 20174155.423.12$128
Oct 20174249.292.98$125
Sep 20174147.523.09$127
Aug 20174345.373.00$129
Jul 20174243.873.09$130
Jun 20174242.493.09$130
May 20174345.373.26$140
Apr 20174247.933.21$135
Mar 20174446.772.98$131
Feb 20174050.452.95$118
Jan 20174449.413.42$150
Dec 20164448.763.72$164
Nov 20164342.492.64$114
Oct 20164446.193.09$136
Sep 20164341.553.10$133
Aug 20164441.442.92$129
Jul 20164441.622.92$129
Jun 20164445.352.69$118
May 20164642.521.99$92
Apr 20164536.561.99$90
Mar 20164833.011.79$86
Feb 20164326.472.06$89
Jan 20164627.352.36$109
Dec 20154732.362.00$94
Nov 20154638.792.17$100
Oct 20154043.552.43$97
Sep 20153642.992.76$99
Aug 2015940.162.87$26
Jul 20152148.152.95$62
Jun 2015656.152.88$17
May 20151055.212.96$30
Apr 20153249.822.71$87
Mar 2015142.892.93$3
Feb 20151844.662.98$54
Jan 20152243.433.10$68
Dec 20142954.693.59$104
Nov 20142770.464.25$115
Oct 2014278.303.90$8
Sep 20142586.164.05$101
Aug 20142589.394.04$101
Jul 20142996.564.18$121
Jun 20142698.164.74$123
May 20142094.734.73$95
Apr 20142095.944.81$96
Mar 20142195.895.06$106
Feb 20143297.406.19$198
Jan 20142890.404.86$136
Dec 20133091.824.35$131
Nov 20133288.853.74$120
Oct 20133197.423.78$117
Sep 201331104.113.72$115
Aug 201334104.253.52$120
Jul 201332102.523.72$119
Jun 20133594.403.93$138
May 20133694.834.15$149
Apr 20133793.964.28$158
Mar 20134093.623.91$157
Feb 20134191.233.42$140
Jan 20134791.603.42$161
Dec 20124786.773.42$161
Nov 20124586.953.62$163
Oct 20124689.383.40$156
Sep 20124094.672.92$117
Aug 20125192.662.91$148
Jul 20125285.133.02$157
Jun 20125179.822.52$128
May 20125291.612.49$129
Apr 201249101.652.00$98
Mar 201252105.052.22$116
Feb 201251101.102.57$131
Jan 20124198.092.73$112
Dec 2011296.873.24$6
Nov 20114295.723.31$139
Oct 20116284.983.65$226
Sep 20115883.623.99$231
Aug 20115583.404.15$228
Jul 20116194.144.52$276
Jun 20115792.904.64$264
May 20117198.134.40$313
Apr 201169105.964.33$299
Mar 20116396.364.06$256
Feb 20114985.644.18$205
Jan 20113286.504.59$147
Dec 20102485.734.35$104
Nov 20105780.843.80$216
Oct 20101778.103.51$60
Sep 20105972.633.98$235
Aug 20108173.684.42$358
Jul 20109172.554.74$431
Jun 20105270.364.91$255
May 20109571.124.24$402
Apr 20109281.694.12$379
Mar 20106978.394.39$303
Feb 20106973.585.44$376
Jan 20107874.365.96$465
Dec 20097771.445.48$422
Nov 20097974.593.75$296
Oct 20098072.544.11$329
Sep 20097765.543.06$236
Aug 20098167.423.22$261
Jul 20098361.133.46$288
Jun 20098166.163.90$316
May 20096854.743.93$267
Apr 20099046.773.59$323
Mar 20096942.144.06$280
Feb 20096332.814.63$292
Jan 20096435.865.37$344
Dec 20083637.105.98$215
Nov 20082555.496.86$172
Oct 20083775.246.92$256
Sep 200878101.767.88$614
Aug 200889114.228.48$755
Jul 200894131.0811.39$1,071
Jun 2008100131.3313.03$1,303
May 2008104123.1711.57$1,204
Apr 2008101110.3110.45$1,056
Mar 2008104101.909.66$1,005
Feb 200810092.538.77$877
Jan 200810690.388.21$870
Dec 200710788.337.30$781
Nov 20078691.677.29$627
Oct 20079682.856.92$665
Sep 20078975.846.24$556
Aug 20079469.066.39$600
Jul 20079670.906.39$613
Jun 20079662.007.55$725
May 200710258.747.85$800
Apr 20079959.617.81$773
Mar 200710756.927.30$781
Feb 20079655.108.22$789
Jan 200710650.306.73$713
Dec 200612656.656.92$872
Nov 200613154.207.62$998
Oct 20065254.906.01$313
Sep 2006060.085.04$0
Aug 2006468.717.34$29
Jul 2006769.376.34$44
Jun 20063566.286.38$223
May 200615366.016.42$983
Apr 200616964.397.36$1,244
Mar 20062856.707.08$198
Feb 20066657.597.75$512
Jan 200618160.598.93$1,617
Dec 20058854.9413.42$1,181
Nov 200518054.6910.59$1,906
Oct 200522858.3413.80$3,145
Sep 200518461.4512.08$2,223
Aug 200521261.519.80$2,077
Jul 200518455.697.84$1,443
Jun 200525552.337.38$1,882
May 200529845.226.65$1,982
Apr 200537749.207.36$2,775
Mar 200559650.377.15$4,264
Feb 20058145.226.31$511
Jan 20051,41243.166.32$8,927
Dec 200483639.866.75$5,644
Nov 20041,01445.286.33$6,419
Oct 20041,73649.706.52$11,310
Sep 20041,16843.245.28$6,172
Aug 20041,25742.375.55$6,977
Jul 200498538.286.08$5,993
Jun 20041,10636.106.43$7,115
May 20041,45937.486.49$9,476
Apr 20041,34434.475.86$7,874
Mar 20041,93534.365.53$10,701
Feb 200425,08632.455.51$138,214
Jan 20041,66232.036.30$10,470

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                   26 Mcf  × $  3.05 =        $79

────────────────────────────────────────────────────
Month total                                      $79

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well