MAYER 20

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205467District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.2 M
Nov 2003 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
271
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-03-14156345
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition88 bbl$5,444
GasProduction200,158 Mcf$1,199,896
Total$1,205,340

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5552, -100.8391. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.55522, -100.83908 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,650 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,650 ft.

Completions filed
Nov 2003
1 of 1 wells

1 well

42-4353637738,650 ftNov 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (271)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

271 months

May 20260145106.413.05$442
Apr 2026013798.932.87$393
Mar 2026014389.753.15$450
Feb 2026012663.503.75$473
Jan 2026012659.138.00$1,008
Dec 2025013756.664.41$605
Nov 2025013858.593.93$542
Oct 2025014759.383.30$486
Sep 2025014562.743.08$446
Aug 2025014763.933.01$443
Jul 2025014666.743.32$484
Jun 2025014266.483.13$444
May 2025014260.553.23$459
Apr 2025013862.363.54$489
Mar 2025013867.704.27$589
Feb 2025012670.884.34$547
Jan 2025013874.324.28$590
Dec 2024014168.993.12$440
Nov 2024014069.052.20$308
Oct 2024014571.372.28$331
Sep 2024014269.612.36$336
Aug 2024015175.632.06$312
Jul 2024014979.932.15$320
Jun 2024014678.082.63$385
May 2024014878.812.20$325
Apr 2024014784.451.66$244
Mar 2024014980.301.55$230
Feb 2024014276.091.78$253
Jan 2024015673.023.30$514
Dec 2023015271.262.61$397
Nov 2023015077.892.81$421
Oct 2023015985.443.09$491
Sep 2023015689.042.74$427
Aug 2023016380.522.67$436
Jul 2023016474.852.64$433
Jun 2023016068.962.26$361
May 2023016070.622.23$356
Apr 2023016078.122.24$358
Mar 2023016672.852.39$397
Feb 2023015075.112.47$370
Jan 2023016276.533.39$549
Dec 2022016376.415.73$934
Nov 2022016285.005.65$915
Oct 2022017487.185.86$1,020
Sep 2022017384.888.16$1,412
Aug 2022018094.529.13$1,643
Jul 20220182101.587.54$1,373
Jun 20220176115.097.98$1,404
May 20220181109.378.43$1,526
Apr 20220173104.226.84$1,183
Mar 20220177108.885.08$899
Feb 2022016091.054.86$777
Jan 2022017681.844.54$799
Dec 2021018471.323.90$717
Nov 2021017877.435.24$932
Oct 2021018979.795.71$1,080
Sep 2021018769.865.35$1,001
Aug 2021019766.024.22$831
Jul 2021020070.783.98$796
Jun 2021018969.493.38$639
May 2021019863.483.02$598
Apr 2021020060.362.76$552
Mar 2021020161.302.72$546
Feb 2021014757.805.55$816
Jan 2021019850.412.81$556
Dec 2020019044.642.68$508
Nov 2020018838.772.71$509
Oct 2020019936.972.48$493
Sep 2020019637.091.99$390
Aug 2020020339.982.39$484
Jul 2020020738.371.83$378
Jun 2020020034.901.69$338
May 2020020116.921.81$365
Apr 2020019914.751.80$359
Mar 2020022930.341.86$425
Feb 2020022849.881.98$452
Jan 2020023157.252.09$484
Dec 2019023259.012.30$535
Nov 2019022955.302.75$630
Oct 2019024153.472.42$583
Sep 2019124255.052.66$698
Aug 2019032353.112.30$744
Jul 2019031456.272.46$772
Jun 2019022252.782.49$553
May 2019024858.482.74$680
Apr 2019024762.632.75$679
Mar 2019025556.803.06$781
Feb 2019023150.852.79$645
Jan 2019025946.033.23$836
Dec 2018026346.594.19$1,101
Nov 2018025952.934.24$1,097
Oct 2018026261.443.40$890
Sep 2018026059.543.11$808
Aug 2018026959.403.07$825
Jul 2018027465.142.93$803
Jun 2018126760.183.08$882
May 2018027265.382.90$789
Apr 2018126563.842.90$833
Mar 2018027361.222.79$761
Feb 2018024861.782.77$686
Jan 2018127362.874.01$1,157
Dec 2017027557.272.92$803
Nov 2017027155.423.12$845
Oct 2017228549.292.98$949
Sep 2017024847.523.09$766
Aug 2017029245.373.00$877
Jul 2017029143.873.09$898
Jun 2017028642.493.09$883
May 2017028345.373.26$924
Apr 2017027947.933.21$896
Mar 2017329446.772.98$1,018
Feb 2017026250.452.95$774
Jan 2017029449.413.42$1,005
Dec 2016229648.763.72$1,199
Nov 2016029542.492.64$780
Oct 2016030946.193.09$955
Sep 2016030141.553.10$933
Aug 2016031041.442.92$907
Jul 2016031041.622.92$907
Jun 2016230645.352.69$913
May 2016032142.521.99$639
Apr 2016031336.561.99$623
Mar 2016032633.011.79$585
Feb 2016230126.472.06$674
Jan 2016031627.352.36$747
Dec 2015032432.362.00$648
Nov 2015031438.792.17$681
Oct 2015033143.552.43$803
Sep 2015030842.992.76$850
Aug 2015033640.162.87$965
Jul 2015129248.152.95$908
Jun 2015040256.152.88$1,159
May 2015049655.212.96$1,466
Apr 2015063249.822.71$1,711
Mar 201504242.892.93$123
Feb 20150044.662.98$0
Jan 2015030843.433.10$955
Dec 2014037454.693.59$1,343
Nov 2014135670.464.25$1,584
Oct 2014036978.303.90$1,439
Sep 2014034986.164.05$1,412
Aug 2014038789.394.04$1,562
Jul 2014037696.564.18$1,572
Jun 2014037598.164.74$1,776
May 2014037594.734.73$1,772
Apr 2014137695.944.81$1,904
Mar 2014039495.895.06$1,992
Feb 2014037397.406.19$2,310
Jan 2014137490.404.86$1,908
Dec 2013036691.824.35$1,594
Nov 2013036088.853.74$1,346
Oct 2013137797.423.78$1,522
Sep 20130341104.113.72$1,268
Aug 20130172104.253.52$606
Jul 20130235102.523.72$874
Jun 2013013694.403.93$535
May 2013039794.834.15$1,647
Apr 2013139093.964.28$1,764
Mar 2013040493.623.91$1,581
Feb 2013136691.233.42$1,343
Jan 2013041391.603.42$1,412
Dec 2012141686.773.42$1,510
Nov 2012040586.953.62$1,468
Oct 2012041189.383.40$1,397
Sep 2012041494.672.92$1,208
Aug 2012144292.662.91$1,378
Jul 2012044685.133.02$1,347
Jun 2012042679.822.52$1,073
May 2012044791.612.49$1,112
Apr 20120437101.652.00$873
Mar 20121460105.052.22$1,127
Feb 20120434101.102.57$1,115
Jan 2012147298.092.73$1,389
Dec 2011147996.873.24$1,649
Nov 2011047495.723.31$1,570
Oct 2011149584.983.65$1,891
Sep 2011048183.623.99$1,917
Aug 2011050583.404.15$2,095
Jul 2011051494.144.52$2,322
Jun 2011050092.904.64$2,320
May 2011052398.134.40$2,304
Apr 20111507105.964.33$2,303
Mar 2011053696.364.06$2,175
Feb 2011048385.644.18$2,019
Jan 2011157886.504.59$2,739
Dec 2010057485.734.35$2,496
Nov 2010159280.843.80$2,328
Oct 2010062878.103.51$2,204
Sep 2010061272.633.98$2,435
Aug 2010062673.684.42$2,767
Jul 2010063372.554.74$2,998
Jun 2010164170.364.91$3,218
May 2010167671.124.24$2,934
Apr 2010064181.694.12$2,643
Mar 2010167178.394.39$3,023
Feb 2010156373.585.44$3,138
Jan 2010165674.365.96$3,987
Dec 2009167271.445.48$3,757
Nov 2009066974.593.75$2,510
Oct 2009070872.544.11$2,910
Sep 2009163665.543.06$2,015
Aug 2009070767.423.22$2,275
Jul 2009072261.133.46$2,501
Jun 2009071166.163.90$2,769
May 2009074454.743.93$2,921
Apr 2009173246.773.59$2,673
Mar 2009064142.144.06$2,602
Feb 2009167132.814.63$3,142
Jan 2009077635.865.37$4,168
Dec 2008177137.105.98$4,645
Nov 2008076055.496.86$5,214
Oct 2008179875.246.92$5,599
Sep 20080790101.767.88$6,223
Aug 20081828114.228.48$7,138
Jul 20080839131.0811.39$9,556
Jun 20080863131.3313.03$11,247
May 20080887123.1711.57$10,266
Apr 20081871110.3110.45$9,216
Mar 20080880101.909.66$8,504
Feb 2008083892.538.77$7,350
Jan 2008191190.388.21$7,566
Dec 2007092988.337.30$6,784
Nov 2007191991.677.29$6,793
Oct 2007071282.856.92$4,928
Sep 2007097375.846.24$6,076
Aug 2007097569.066.39$6,228
Jul 200711,02970.906.39$6,644
Jun 200701,01062.007.55$7,624
May 2007098058.747.85$7,689
Apr 2007070359.617.81$5,487
Mar 200711,07556.927.30$7,907
Feb 200701,05055.108.22$8,627
Jan 2007182550.306.73$5,600
Dec 200601,39656.656.92$9,658
Nov 2006268954.207.62$5,357
Oct 2006093554.906.01$5,623
Sep 2006090660.085.04$4,564
Aug 200601,11468.717.34$8,177
Jul 200642,06069.376.34$13,344
Jun 200602,12266.286.38$13,547
May 200602,16466.016.42$13,904
Apr 200632,13964.397.36$15,937
Mar 200602,44556.707.08$17,318
Feb 200622,22657.597.75$17,369
Jan 200632,73360.598.93$24,597
Dec 200502,32854.9413.42$31,231
Nov 200522,02354.6910.59$21,530
Oct 200502,06158.3413.80$28,433
Sep 200501,88061.4512.08$22,709
Aug 200502,07261.519.80$20,299
Jul 200502,03555.697.84$15,962
Jun 200521,76352.337.38$13,117
May 200501,75745.226.65$11,686
Apr 200501,84849.207.36$13,602
Mar 200574,51750.377.15$32,671
Feb 200506,74845.226.31$42,593
Jan 200557,46943.166.32$47,436
Dec 200407,43439.866.75$50,188
Nov 200404,99145.286.33$31,595
Oct 200433,70549.706.52$24,288
Sep 200403,71543.245.28$19,630
Aug 200403,87942.375.55$21,531
Jul 200403,39238.286.08$20,638
Jun 200403,43136.106.43$22,072
May 200423,48937.486.49$22,735
Apr 200403,54434.475.86$20,762
Mar 200424,12134.365.53$22,858
Feb 200403,67632.455.51$20,253
Jan 200424,08532.036.30$25,798
Dec 200305,35930.266.30$33,770
Nov 200301,15728.804.60$5,317

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  145 Mcf  × $  3.05 =       $442

────────────────────────────────────────────────────
Month total                                     $442

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/205467 is the state's own key, not one this site invented.