BAILEY

Operated by ZARVONA ENERGY LLC (P-5 950523) in the OZONA, NE. (CANYON 7520) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 206155District 7CField 679985002 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.5 M
Jun 2004 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
264
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 592 leases and 641 wells, and the rule below applies to all of them.

Discovered
1966-01-17
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2013-10-22.

The Commission's schedule remark for this field reads: PER DOCKET 01-0299858, THIS FIELD HAS BEEN DESIGNATED AS A UFT

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-05-06161463
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,507 bbl$154,865
GasProduction380,786 Mcf$2,319,903
Total$2,474,769

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.8096, -100.9991. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,540 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,540 ft.

Completions filed
Jun 2004
1 of 1 wells

1 well

42-105392641038,540 ftJun 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (264)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

264 months

May 202605106.413.05$15
Apr 20260498.932.87$11
Mar 202601689.753.15$50
Feb 2026012163.503.75$454
Jan 2026013759.138.00$1,096
Dec 2025015956.664.41$702
Nov 2025017658.593.93$691
Oct 2025015659.383.30$516
Sep 2025015662.743.08$480
Aug 2025016063.933.01$482
Jul 2025015866.743.32$524
Jun 2025016766.483.13$523
May 2025018360.553.23$592
Apr 202503062.363.54$106
Mar 2025017067.704.27$726
Feb 2025012470.884.34$538
Jan 2025014974.324.28$638
Dec 2024014968.993.12$465
Nov 2024015469.052.20$339
Oct 2024019971.372.28$454
Sep 202406269.612.36$147
Aug 2024015775.632.06$324
Jul 2024015979.932.15$341
Jun 2024014878.082.63$390
May 2024017378.812.20$380
Apr 2024015684.451.66$259
Mar 2024017480.301.55$269
Feb 2024016776.091.78$298
Jan 2024026973.023.30$887
Dec 2023019571.262.61$509
Nov 2023018877.892.81$528
Oct 2023020485.443.09$630
Sep 2023020589.042.74$561
Aug 2023019480.522.67$519
Jul 2023020674.852.64$544
Jun 2023021768.962.26$490
May 2023010970.622.23$243
Apr 2023020178.122.24$450
Mar 2023018872.852.39$450
Feb 2023017775.112.47$436
Jan 2023018976.533.39$640
Dec 2022020076.415.73$1,146
Nov 2022020185.005.65$1,135
Oct 2022020787.185.86$1,214
Sep 2022021384.888.16$1,739
Aug 2022021994.529.13$1,999
Jul 20220216101.587.54$1,629
Jun 20220182115.097.98$1,452
May 20220230109.378.43$1,940
Apr 20220246104.226.84$1,682
Mar 20220196108.885.08$995
Feb 2022023691.054.86$1,147
Jan 2022029181.844.54$1,320
Dec 2021024071.323.90$936
Nov 2021023677.435.24$1,236
Oct 2021020079.795.71$1,143
Sep 2021022969.865.35$1,225
Aug 2021021466.024.22$903
Jul 2021023270.783.98$924
Jun 2021021369.493.38$720
May 2021013563.483.02$407
Apr 2021012160.362.76$334
Mar 2021030961.302.72$840
Feb 2021019457.805.55$1,076
Jan 2021029650.412.81$832
Dec 2020031044.642.68$829
Nov 2020030238.772.71$817
Oct 2020034636.972.48$858
Sep 2020033437.091.99$665
Aug 2020035139.982.39$837
Jul 2020035038.371.83$639
Jun 2020033034.901.69$558
May 2020033016.921.81$599
Apr 2020033714.751.80$608
Mar 2020035130.341.86$652
Feb 2020033849.881.98$669
Jan 2020037857.252.09$792
Dec 2019038959.012.30$896
Nov 2019038555.302.75$1,059
Oct 2019049153.472.42$1,188
Sep 2019046955.052.66$1,246
Aug 2019048253.112.30$1,111
Jul 2019048456.272.46$1,191
Jun 2019047252.782.49$1,176
May 2019049158.482.74$1,346
Apr 2019046662.632.75$1,282
Mar 2019048756.803.06$1,491
Feb 2019043450.852.79$1,212
Jan 2019039746.033.23$1,282
Dec 2018039446.594.19$1,649
Nov 2018039352.934.24$1,665
Oct 2018043161.443.40$1,465
Sep 2018046059.543.11$1,430
Aug 2018045659.403.07$1,398
Jul 2018047065.142.93$1,378
Jun 2018048260.183.08$1,483
May 2018049865.382.90$1,445
Apr 2018047663.842.90$1,381
Mar 2018041461.222.79$1,154
Feb 2018042761.782.77$1,181
Jan 2018048162.874.01$1,928
Dec 2017045957.272.92$1,341
Nov 2017052255.423.12$1,628
Oct 2017056049.292.98$1,671
Sep 2017046747.523.09$1,442
Aug 2017042445.373.00$1,274
Jul 2017058143.873.09$1,794
Jun 2017058242.493.09$1,797
May 2017059945.373.26$1,955
Apr 2017057847.933.21$1,856
Mar 2017060646.772.98$1,808
Feb 2017055450.452.95$1,636
Jan 2017060449.413.42$2,065
Dec 2016060648.763.72$2,256
Nov 20164958842.492.64$3,637
Oct 2016061346.193.09$1,894
Sep 2016060341.553.10$1,870
Aug 2016056841.442.92$1,661
Jul 2016062341.622.92$1,822
Jun 2016056745.352.69$1,523
May 2016064242.521.99$1,278
Apr 2016061536.561.99$1,224
Mar 2016266333.011.79$1,255
Feb 2016062526.472.06$1,290
Jan 2016067727.352.36$1,601
Dec 2015065232.362.00$1,305
Nov 2015066138.792.17$1,433
Oct 2015070143.552.43$1,701
Sep 2015070142.992.76$1,934
Aug 2015070240.162.87$2,016
Jul 2015076448.152.95$2,250
Jun 20154385056.152.88$4,865
May 2015256855.212.96$1,789
Apr 2015066649.822.71$1,803
Mar 2015074442.892.93$2,183
Feb 2015065644.662.98$1,952
Jan 2015075743.433.10$2,347
Dec 2014077154.693.59$2,769
Nov 2014078670.464.25$3,342
Oct 2014073178.303.90$2,852
Sep 2014076386.164.05$3,087
Aug 2014084989.394.04$3,426
Jul 2014087596.564.18$3,657
Jun 2014082398.164.74$3,898
May 2014086294.734.73$4,074
Apr 2014090295.944.81$4,338
Mar 20143579495.895.06$7,371
Feb 2014083297.406.19$5,152
Jan 2014087290.404.86$4,239
Dec 2013085691.824.35$3,727
Nov 2013093388.853.74$3,488
Oct 2013099997.423.78$3,776
Sep 201301,078104.113.72$4,008
Aug 20130750104.253.52$2,642
Jul 20130937102.523.72$3,484
Jun 2013077494.403.93$3,044
May 20134396894.834.15$8,094
Apr 201301,06193.964.28$4,544
Mar 2013069293.623.91$2,708
Feb 2013097691.233.42$3,338
Jan 201301,11991.603.42$3,827
Dec 201201,04786.773.42$3,581
Nov 2012097786.953.62$3,542
Oct 201251,02089.383.40$3,915
Sep 2012080894.672.92$2,358
Aug 201201,08192.662.91$3,144
Jul 201201,12485.133.02$3,395
Jun 201201,08179.822.52$2,723
May 2012461,02491.612.49$6,762
Apr 201201,055101.652.00$2,107
Mar 20120961105.052.22$2,135
Feb 201273827101.102.57$9,506
Jan 201201,32598.092.73$3,623
Dec 201101,15096.873.24$3,726
Nov 201101,31995.723.31$4,368
Oct 201101,42684.983.65$5,203
Sep 201101,40683.623.99$5,604
Aug 201101,42783.404.15$5,921
Jul 201101,41294.144.52$6,378
Jun 201101,31992.904.64$6,120
May 201101,50698.134.40$6,634
Apr 201101,139105.964.33$4,936
Mar 2011511,40096.364.06$10,595
Feb 201101,28685.644.18$5,375
Jan 201101,43586.504.59$6,585
Dec 201001,46585.734.35$6,369
Nov 201001,44880.843.80$5,496
Oct 201001,44078.103.51$5,053
Sep 2010261,30872.633.98$7,094
Aug 201001,46273.684.42$6,461
Jul 201001,22372.554.74$5,793
Jun 201001,41670.364.91$6,953
May 201001,14271.124.24$4,837
Apr 201001,25281.694.12$5,162
Mar 201001,56778.394.39$6,877
Feb 2010361,22273.585.44$9,299
Jan 201001,51874.365.96$9,053
Dec 200901,55471.445.48$8,522
Nov 2009371,51274.593.75$8,432
Oct 200901,61872.544.11$6,650
Sep 200901,62765.543.06$4,986
Aug 200901,69167.423.22$5,442
Jul 200901,75161.133.46$6,066
Jun 20091351,69766.163.90$15,541
May 200901,68754.743.93$6,623
Apr 200901,70846.773.59$6,127
Mar 200901,83642.144.06$7,452
Feb 200901,73132.814.63$8,020
Jan 200902,01635.865.37$10,828
Dec 200801,88837.105.98$11,285
Nov 200802,11355.496.86$14,496
Oct 200802,25875.246.92$15,630
Sep 20080663101.767.88$5,223
Aug 200801,819114.228.48$15,431
Jul 200802,019131.0811.39$22,995
Jun 200801,965131.3313.03$25,609
May 200802,068123.1711.57$23,936
Apr 20081972,027110.3110.45$42,923
Mar 200802,096101.909.66$20,256
Feb 200802,10892.538.77$18,488
Jan 200802,28690.388.21$18,758
Dec 200702,39788.337.30$17,503
Nov 200702,27891.677.29$16,610
Oct 200702,56482.856.92$17,748
Sep 200702,65175.846.24$16,553
Aug 200702,66869.066.39$17,043
Jul 200702,67870.906.39$17,107
Jun 200702,56362.007.55$19,347
May 20071882,81058.747.85$33,091
Apr 200702,66759.617.81$20,816
Mar 200702,87656.927.30$21,000
Feb 200702,54855.108.22$20,934
Jan 200703,02450.306.73$20,342
Dec 200603,10356.656.92$21,468
Nov 200603,21454.207.62$24,483
Oct 200603,40954.906.01$20,501
Sep 20061843,47560.085.04$28,559
Aug 200603,76668.717.34$27,642
Jul 200603,62369.376.34$22,980
Jun 200604,00666.286.38$25,574
May 200603,95666.016.42$25,417
Apr 20061773,77364.397.36$39,168
Mar 200604,04156.707.08$28,622
Feb 200604,20057.597.75$32,555
Jan 200605,31860.598.93$47,507
Dec 200505,23354.9413.42$70,203
Nov 20051834,87254.6910.59$61,595
Oct 200505,34958.3413.80$73,794
Sep 200504,95061.4512.08$59,791
Aug 200504,97061.519.80$48,690
Jul 200505,71155.697.84$44,795
Jun 20051775,58052.337.38$50,449
May 200505,28845.226.65$35,171
Apr 200504,76449.207.36$35,065
Mar 200506,36850.377.15$45,562
Feb 20051906,20245.226.31$47,738
Jan 200507,93143.166.32$50,141
Dec 20041918,64239.866.75$65,956
Nov 2004678,35945.286.33$55,950
Oct 2004011,07149.706.52$72,129
Sep 200418611,50843.245.28$68,850
Aug 200418415,57342.375.55$94,237
Jul 2004019,20138.286.08$116,822
Jun 200403,04636.106.43$19,595

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    5 Mcf  × $  3.05 =        $15

────────────────────────────────────────────────────
Month total                                      $15

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/206155 is the state's own key, not one this site invented.