PIERCE, V.I. 29

Operated by EXTEX OPERATING COMPANY (P-5 257062) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 206166District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.7 M
May 2004 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
265
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-01-31167044
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5 bbl$303
GasProduction265,151 Mcf$1,659,728
Total$1,660,031

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4239, -101.3883. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42388, -101.38833 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,525 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,525 ft.

Completions filed
May 2004
1 of 1 wells

1 well

42-1053925946,525 ftMay 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (265)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

265 months

May 202600106.413.05$0
Apr 202601298.932.87$34
Mar 20260089.753.15$0
Feb 202603563.503.75$131
Jan 202607159.138.00$568
Dec 202509656.664.41$424
Nov 202503158.593.93$122
Oct 202509159.383.30$301
Sep 202503462.743.08$105
Aug 2025013863.933.01$416
Jul 2025011066.743.32$365
Jun 202501766.483.13$53
May 2025511460.553.23$671
Apr 2025013162.363.54$464
Mar 202508767.704.27$371
Feb 2025014870.884.34$642
Jan 2025012374.324.28$526
Dec 2024016368.993.12$509
Nov 202407069.052.20$154
Oct 202404271.372.28$96
Sep 202407369.612.36$173
Aug 202401075.632.06$21
Jul 202407379.932.15$157
Jun 202401878.082.63$47
May 2024012878.812.20$281
Apr 20240084.451.66$0
Mar 202408780.301.55$134
Feb 2024014676.091.78$260
Jan 2024014173.023.30$465
Dec 2023015771.262.61$410
Nov 2023015077.892.81$421
Oct 2023014685.443.09$451
Sep 2023015789.042.74$429
Aug 2023017480.522.67$465
Jul 2023017574.852.64$462
Jun 2023019668.962.26$443
May 2023025670.622.23$570
Apr 2023033178.122.24$741
Mar 2023031172.852.39$744
Feb 2023022775.112.47$560
Jan 2023026976.533.39$911
Dec 2022026976.415.73$1,541
Nov 2022038085.005.65$2,146
Oct 2022036687.185.86$2,146
Sep 2022038184.888.16$3,110
Aug 2022041094.529.13$3,742
Jul 20220397101.587.54$2,994
Jun 20220462115.097.98$3,685
May 20220411109.378.43$3,466
Apr 20220384104.226.84$2,626
Mar 20220286108.885.08$1,452
Feb 2022043591.054.86$2,114
Jan 2022030081.844.54$1,361
Dec 2021072471.323.90$2,823
Nov 2021036177.435.24$1,891
Oct 2021035079.795.71$2,000
Sep 202101,27969.865.35$6,844
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 202107760.362.76$212
Mar 2021021761.302.72$590
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 202009614.751.80$173
Mar 2020023430.341.86$434
Feb 2020023049.881.98$456
Jan 2020021357.252.09$446
Dec 2019022759.012.30$523
Nov 2019023155.302.75$635
Oct 2019021553.472.42$520
Sep 2019022255.052.66$590
Aug 2019024753.112.30$569
Jul 2019022856.272.46$561
Jun 2019023652.782.49$588
May 2019024858.482.74$680
Apr 2019022762.632.75$624
Mar 2019024456.803.06$747
Feb 2019023450.852.79$653
Jan 2019027046.033.23$872
Dec 2018022346.594.19$933
Nov 2018025352.934.24$1,072
Oct 2018028361.443.40$962
Sep 2018021559.543.11$668
Aug 2018022759.403.07$696
Jul 2018029365.142.93$859
Jun 2018025460.183.08$782
May 2018028165.382.90$815
Apr 2018024163.842.90$699
Mar 2018020561.222.79$571
Feb 2018018761.782.77$517
Jan 2018045462.874.01$1,820
Dec 2017055257.272.92$1,613
Nov 2017055555.423.12$1,731
Oct 2017058049.292.98$1,731
Sep 2017058147.523.09$1,794
Aug 2017059645.373.00$1,791
Jul 2017061743.873.09$1,905
Jun 2017061642.493.09$1,902
May 2017065045.373.26$2,121
Apr 2017064547.933.21$2,071
Mar 2017071846.772.98$2,142
Feb 2017044650.452.95$1,317
Jan 2017047849.413.42$1,634
Dec 2016044548.763.72$1,657
Nov 2016039842.492.64$1,052
Oct 2016038146.193.09$1,177
Sep 2016039241.553.10$1,215
Aug 2016039741.442.92$1,161
Jul 2016040041.622.92$1,170
Jun 2016040045.352.69$1,074
May 2016039542.521.99$786
Apr 2016038836.561.99$773
Mar 2016038133.011.79$684
Feb 2016034526.472.06$712
Jan 2016041327.352.36$976
Dec 2015043732.362.00$875
Nov 2015032738.792.17$709
Oct 2015034743.552.43$842
Sep 2015038042.992.76$1,048
Aug 2015047540.162.87$1,364
Jul 2015044648.152.95$1,314
Jun 2015048456.152.88$1,395
May 2015051455.212.96$1,519
Apr 2015042349.822.71$1,145
Mar 2015030142.892.93$883
Feb 2015037344.662.98$1,110
Jan 2015046943.433.10$1,454
Dec 2014049354.693.59$1,771
Nov 2014044470.464.25$1,888
Oct 2014053678.303.90$2,091
Sep 2014053286.164.05$2,152
Aug 2014055089.394.04$2,219
Jul 2014052396.564.18$2,186
Jun 2014054498.164.74$2,577
May 2014055994.734.73$2,642
Apr 2014051695.944.81$2,482
Mar 2014045795.895.06$2,311
Feb 2014044997.406.19$2,780
Jan 2014054090.404.86$2,625
Dec 2013048791.824.35$2,121
Nov 2013044588.853.74$1,664
Oct 2013058197.423.78$2,196
Sep 20130537104.113.72$1,996
Aug 20130587104.253.52$2,068
Jul 20130607102.523.72$2,257
Jun 2013061294.403.93$2,407
May 2013030894.834.15$1,278
Apr 2013061993.964.28$2,651
Mar 2013015493.623.91$603
Feb 2013047091.233.42$1,607
Jan 2013046291.603.42$1,580
Dec 2012050586.773.42$1,727
Nov 2012050886.953.62$1,841
Oct 2012055689.383.40$1,890
Sep 2012056094.672.92$1,634
Aug 2012057692.662.91$1,675
Jul 2012057385.133.02$1,731
Jun 2012057979.822.52$1,459
May 2012053091.612.49$1,319
Apr 20120526101.652.00$1,050
Mar 20120549105.052.22$1,220
Feb 20120517101.102.57$1,329
Jan 2012057998.092.73$1,583
Dec 2011061596.873.24$1,992
Nov 2011061295.723.31$2,027
Oct 2011068384.983.65$2,492
Sep 2011081283.623.99$3,236
Aug 2011088683.404.15$3,676
Jul 2011091594.144.52$4,133
Jun 2011091192.904.64$4,227
May 2011097798.134.40$4,304
Apr 20110706105.964.33$3,059
Mar 2011092396.364.06$3,745
Feb 2011086885.644.18$3,628
Jan 201101,01986.504.59$4,676
Dec 2010098885.734.35$4,296
Nov 201001,04180.843.80$3,951
Oct 201001,11378.103.51$3,905
Sep 201001,08272.633.98$4,306
Aug 201001,28273.684.42$5,666
Jul 201001,04372.554.74$4,940
Jun 2010086870.364.91$4,262
May 2010081171.124.24$3,435
Apr 2010063781.694.12$2,626
Mar 2010064078.394.39$2,809
Feb 2010058273.585.44$3,167
Jan 2010068574.365.96$4,085
Dec 2009067971.445.48$3,723
Nov 2009070774.593.75$2,652
Oct 2009076272.544.11$3,132
Sep 2009075365.543.06$2,308
Aug 2009082067.423.22$2,639
Jul 2009084261.133.46$2,917
Jun 2009079466.163.90$3,093
May 2009087254.743.93$3,423
Apr 2009083946.773.59$3,010
Mar 200901,08142.144.06$4,388
Feb 200901,11532.814.63$5,166
Jan 200901,30235.865.37$6,993
Dec 200801,30437.105.98$7,794
Nov 200801,29355.496.86$8,870
Oct 200801,46075.246.92$10,106
Sep 20080945101.767.88$7,444
Aug 200801,385114.228.48$11,749
Jul 200801,415131.0811.39$16,116
Jun 200801,380131.3313.03$17,985
May 200801,455123.1711.57$16,841
Apr 200801,428110.3110.45$14,930
Mar 200801,496101.909.66$14,457
Feb 200801,41392.538.77$12,393
Jan 200801,53390.388.21$12,579
Dec 200701,54688.337.30$11,289
Nov 200701,49091.677.29$10,865
Oct 200701,61982.856.92$11,207
Sep 200701,63275.846.24$10,190
Aug 200701,74169.066.39$11,121
Jul 200701,77970.906.39$11,364
Jun 200701,81662.007.55$13,708
May 200701,87458.747.85$14,704
Apr 200701,91559.617.81$14,947
Mar 200701,36856.927.30$9,989
Feb 200701,90155.108.22$15,619
Jan 200702,22950.306.73$14,994
Dec 200602,24656.656.92$15,539
Nov 200602,19054.207.62$16,682
Oct 200602,36754.906.01$14,235
Sep 200602,46660.085.04$12,422
Aug 200602,57568.717.34$18,900
Jul 200602,68369.376.34$17,018
Jun 200602,69066.286.38$17,173
May 200602,91466.016.42$18,722
Apr 200602,91164.397.36$21,426
Mar 200603,10056.707.08$21,957
Feb 200602,90057.597.75$22,478
Jan 200603,33760.598.93$29,810
Dec 200503,63754.9413.42$48,792
Nov 200502,92354.6910.59$30,950
Oct 200503,56858.3413.80$49,223
Sep 200503,56261.4512.08$43,025
Aug 200503,82261.519.80$37,444
Jul 200503,98955.697.84$31,288
Jun 200504,10652.337.38$30,307
May 200504,51345.226.65$30,017
Apr 200505,11649.207.36$37,656
Mar 200505,56350.377.15$39,803
Feb 200505,25945.226.31$33,194
Jan 200506,09843.166.32$38,553
Dec 200405,91939.866.75$39,960
Nov 200405,96045.286.33$37,729
Oct 200406,46649.706.52$42,127
Sep 200406,92343.245.28$36,580
Aug 200407,85742.375.55$43,612
Jul 200408,66438.286.08$52,713
Jun 200409,47936.106.43$60,979
May 200406,40637.486.49$41,604

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   12 Mcf  × $  2.87 =        $34

────────────────────────────────────────────────────
Month total                                      $34

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/206166 is the state's own key, not one this site invented.