GENINI

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 206303District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.4 M
Mar 2004 – May 2026
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
267
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-05-24157992
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition77 bbl$5,513
GasProduction233,794 Mcf$1,392,472
Total$1,397,984

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4062, -100.7339. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.40619, -100.73387 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,912 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,912 ft.

Completions filed
Mar 2004
1 of 1 wells

1 well

42-4353672331126,912 ftMar 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (267)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

267 months

May 20260271106.413.05$825
Apr 2026020498.932.87$585
Mar 2026022089.753.15$693
Feb 2026119463.503.75$791
Jan 2026026959.138.00$2,151
Dec 2025030256.664.41$1,333
Nov 2025019658.593.93$770
Oct 2025122359.383.30$796
Sep 2025017962.743.08$551
Aug 2025017463.933.01$525
Jul 2025022066.743.32$729
Jun 2025020566.483.13$641
May 2025034060.553.23$1,099
Apr 2025114562.363.54$576
Mar 2025027167.704.27$1,157
Feb 2025015870.884.34$686
Jan 2025020374.324.28$869
Dec 2024030768.993.12$958
Nov 2024023569.052.20$517
Oct 2024021571.372.28$491
Sep 2024120369.612.36$550
Aug 2024016075.632.06$330
Jul 2024115679.932.15$415
Jun 2024015978.082.63$419
May 2024026178.812.20$574
Apr 2024032284.451.66$534
Mar 2024019680.301.55$303
Feb 2024111676.091.78$283
Jan 2024022073.023.30$725
Dec 2023024371.262.61$634
Nov 2023019277.892.81$539
Oct 2023027885.443.09$858
Sep 2023031989.042.74$872
Aug 2023132880.522.67$957
Jul 2023111074.852.64$365
Jun 202306768.962.26$151
May 2023114070.622.23$382
Apr 2023116978.122.24$456
Mar 2023121572.852.39$587
Feb 2023023875.112.47$587
Jan 2023118176.533.39$690
Dec 2022022976.415.73$1,312
Nov 2022019585.005.65$1,101
Oct 2022022987.185.86$1,343
Sep 2022020284.888.16$1,649
Aug 2022021394.529.13$1,944
Jul 20220303101.587.54$2,285
Jun 20220315115.097.98$2,513
May 20220247109.378.43$2,083
Apr 20220269104.226.84$1,839
Mar 20220275108.885.08$1,396
Feb 2022024891.054.86$1,205
Jan 2022025081.844.54$1,134
Dec 2021132271.323.90$1,327
Nov 2021037277.435.24$1,948
Oct 2021028779.795.71$1,640
Sep 2021033669.865.35$1,798
Aug 2021035866.024.22$1,511
Jul 2021042470.783.98$1,688
Jun 2021037869.493.38$1,278
May 2021438763.483.02$1,422
Apr 2021139960.362.76$1,161
Mar 2021136261.302.72$1,045
Feb 2021029557.805.55$1,637
Jan 2021013350.412.81$374
Dec 2020117644.642.68$516
Nov 2020012738.772.71$344
Oct 2020019436.972.48$481
Sep 2020017737.091.99$352
Aug 2020023839.982.39$568
Jul 2020015738.371.83$287
Jun 2020019034.901.69$321
May 2020031316.921.81$568
Apr 2020038514.751.80$695
Mar 2020031430.341.86$583
Feb 2020031649.881.98$626
Jan 2020042857.252.09$897
Dec 2019042859.012.30$986
Nov 2019037955.302.75$1,043
Oct 2019037153.472.42$897
Sep 2019042655.052.66$1,132
Aug 2019041853.112.30$963
Jul 2019023456.272.46$576
Jun 2019020852.782.49$518
May 2019027958.482.74$765
Apr 2019034962.632.75$960
Mar 2019031856.803.06$974
Feb 2019029550.852.79$824
Jan 2019039146.033.23$1,262
Dec 2018039546.594.19$1,653
Nov 2018135052.934.24$1,536
Oct 2018036261.443.40$1,230
Sep 2018042159.543.11$1,308
Aug 2018040559.403.07$1,242
Jul 2018144365.142.93$1,364
Jun 2018045960.183.08$1,412
May 2018049965.382.90$1,448
Apr 2018052063.842.90$1,508
Mar 2018054461.222.79$1,516
Feb 2018055061.782.77$1,521
Jan 2018179062.874.01$3,230
Dec 2017190857.272.92$2,710
Nov 201727655.423.12$348
Oct 2017110549.292.98$363
Sep 2017114647.523.09$498
Aug 2017215145.373.00$544
Jul 2017011543.873.09$355
Jun 2017012642.493.09$389
May 2017013745.373.26$447
Apr 2017012447.933.21$398
Mar 2017013046.772.98$388
Feb 2017013350.452.95$393
Jan 2017017849.413.42$609
Dec 2016020548.763.72$763
Nov 2016030042.492.64$793
Oct 2016023246.193.09$717
Sep 2016025741.553.10$797
Aug 2016030741.442.92$898
Jul 2016039941.622.92$1,167
Jun 2016041845.352.69$1,123
May 2016042442.521.99$844
Apr 2016045936.561.99$914
Mar 2016053433.011.79$958
Feb 2016065126.472.06$1,343
Jan 2016026127.352.36$617
Dec 2015040232.362.00$805
Nov 2015055738.792.17$1,207
Oct 2015029343.552.43$711
Sep 2015041042.992.76$1,131
Aug 2015053140.162.87$1,525
Jul 2015045048.152.95$1,325
Jun 2015046756.152.88$1,346
May 2015047355.212.96$1,398
Apr 2015047849.822.71$1,294
Mar 2015049542.892.93$1,453
Feb 2015046944.662.98$1,396
Jan 2015048843.433.10$1,513
Dec 2014051254.693.59$1,839
Nov 2014050270.464.25$2,134
Oct 2014054478.303.90$2,122
Sep 2014051286.164.05$2,071
Aug 2014056589.394.04$2,280
Jul 2014046296.564.18$1,931
Jun 2014043898.164.74$2,075
May 2014047194.734.73$2,226
Apr 2014052595.944.81$2,525
Mar 2014058095.895.06$2,933
Feb 2014441697.406.19$2,965
Jan 2014057690.404.86$2,800
Dec 2013058591.824.35$2,547
Nov 2013060288.853.74$2,250
Oct 2013064597.423.78$2,438
Sep 20130530104.113.72$1,970
Aug 20131600104.253.52$2,218
Jul 20130612102.523.72$2,275
Jun 2013058994.403.93$2,317
May 2013061394.834.15$2,543
Apr 2013060693.964.28$2,595
Mar 2013062293.623.91$2,434
Feb 2013057491.233.42$1,963
Jan 2013062591.603.42$2,137
Dec 2012063186.773.42$2,158
Nov 2012065686.953.62$2,378
Oct 2012068989.383.40$2,342
Sep 2012050294.672.92$1,465
Aug 2012350992.662.91$1,758
Jul 2012073785.133.02$2,226
Jun 2012067079.822.52$1,688
May 2012374191.612.49$2,119
Apr 20123713101.652.00$1,729
Mar 20120764105.052.22$1,698
Feb 20123717101.102.57$2,146
Jan 2012083198.092.73$2,272
Dec 2011085696.873.24$2,773
Nov 2011068395.723.31$2,262
Oct 2011087884.983.65$3,203
Sep 2011394383.623.99$4,009
Aug 2011078083.404.15$3,236
Jul 2011348694.144.52$2,478
Jun 2011051092.904.64$2,366
May 2011066998.134.40$2,947
Apr 20110706105.964.33$3,059
Mar 2011057696.364.06$2,337
Feb 2011044885.644.18$1,873
Jan 2011085186.504.59$3,905
Dec 2010094685.734.35$4,113
Nov 2010097180.843.80$3,685
Oct 2010092378.103.51$3,239
Sep 2010089772.633.98$3,570
Aug 2010099073.684.42$4,375
Jul 201021,04472.554.74$5,090
Jun 201001,11970.364.91$5,495
May 2010070171.124.24$2,969
Apr 2010080681.694.12$3,323
Mar 201001,09278.394.39$4,792
Feb 201001,27173.585.44$6,917
Jan 201012,09374.365.96$12,557
Dec 2009032771.445.48$1,793
Nov 2009036774.593.75$1,377
Oct 2009039072.544.11$1,603
Sep 2009039665.543.06$1,214
Aug 2009145567.423.22$1,532
Jul 2009050261.133.46$1,739
Jun 2009050666.163.90$1,971
May 2009170954.743.93$2,838
Apr 2009080646.773.59$2,892
Mar 200901,12842.144.06$4,579
Feb 200901,08032.814.63$5,004
Jan 200901,23635.865.37$6,639
Dec 200801,33437.105.98$7,974
Nov 200801,25955.496.86$8,637
Oct 200861,29375.246.92$9,402
Sep 200801,333101.767.88$10,500
Aug 200801,360114.228.48$11,537
Jul 200801,459131.0811.39$16,617
Jun 200801,590131.3313.03$20,722
May 200801,177123.1711.57$13,623
Apr 200801,359110.3110.45$14,208
Mar 200801,237101.909.66$11,954
Feb 200801,30292.538.77$11,419
Jan 200801,63890.388.21$13,441
Dec 200701,73088.337.30$12,632
Nov 200701,81991.677.29$13,264
Oct 2007098382.856.92$6,804
Sep 200701,12775.846.24$7,037
Aug 200701,59769.066.39$10,202
Jul 200701,78770.906.39$11,415
Jun 200701,61762.007.55$12,206
May 200701,80058.747.85$14,123
Apr 200701,76559.617.81$13,776
Mar 200701,56756.927.30$11,442
Feb 200701,47655.108.22$12,127
Jan 200701,81550.306.73$12,209
Dec 200601,89956.656.92$13,138
Nov 200601,87154.207.62$14,252
Oct 200601,86254.906.01$11,198
Sep 200601,83360.085.04$9,233
Aug 200601,82868.717.34$13,417
Jul 200602,19569.376.34$13,922
Jun 200602,16966.286.38$13,847
May 200602,22666.016.42$14,302
Apr 200602,24364.397.36$16,510
Mar 200602,42256.707.08$17,155
Feb 200602,22157.597.75$17,215
Jan 200602,55760.598.93$22,843
Dec 200502,39754.9413.42$32,157
Nov 200502,24754.6910.59$23,792
Oct 200502,56858.3413.80$35,428
Sep 200502,48461.4512.08$30,004
Aug 200502,76261.519.80$27,059
Jul 200502,94555.697.84$23,100
Jun 200503,21652.337.38$23,737
May 200503,43245.226.65$22,827
Apr 200503,32149.207.36$24,444
Mar 2005123,30950.377.15$24,280
Feb 200503,10945.226.31$19,624
Jan 200503,78843.166.32$23,948
Dec 200404,27339.866.75$28,847
Nov 200403,60745.286.33$22,834
Oct 200403,80049.706.52$24,757
Sep 200403,91143.245.28$20,665
Aug 200404,60642.375.55$25,566
Jul 200406,01138.286.08$36,572
Jun 200406,13436.106.43$39,460
May 200407,30137.486.49$47,417
Apr 200413,32134.475.86$19,490
Mar 200402,92534.365.53$16,176

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  271 Mcf  × $  3.05 =       $825

────────────────────────────────────────────────────
Month total                                     $825

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well