SIMMONS RANCH

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 206406District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.0 M
Feb 2004 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
268
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-06-01157757
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition26 bbl$1,945
GasProduction147,530 Mcf$1,028,709
Total$1,030,654

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6279, -100.7568. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.62788, -100.75678 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,200 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,200 ft.

Completions filed
Feb 2004
1 of 1 wells

1 well

42-43536634678,200 ftFeb 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (268)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

268 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 201909359.012.30$214
Nov 201901255.302.75$33
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 201801559.543.11$47
Aug 201802859.403.07$86
Jul 201802965.142.93$85
Jun 201802760.183.08$83
May 201802165.382.90$61
Apr 201801263.842.90$35
Mar 201801161.222.79$31
Feb 201801061.782.77$28
Jan 201801062.874.01$40
Dec 201701057.272.92$29
Nov 201701155.423.12$34
Oct 201701249.292.98$36
Sep 201702647.523.09$80
Aug 201702745.373.00$81
Jul 201703543.873.09$108
Jun 201703542.493.09$108
May 201702945.373.26$95
Apr 201702147.933.21$67
Mar 201701846.772.98$54
Feb 201701750.452.95$50
Jan 201701749.413.42$58
Dec 201601948.763.72$71
Nov 201601942.492.64$50
Oct 201602346.193.09$71
Sep 201603641.553.10$112
Aug 201604241.442.92$123
Jul 201604641.622.92$135
Jun 201604145.352.69$110
May 201603542.521.99$70
Apr 201603436.561.99$68
Mar 201602633.011.79$47
Feb 201602726.472.06$56
Jan 201602827.352.36$66
Dec 201502932.362.00$58
Nov 201503338.792.17$72
Oct 201504043.552.43$97
Sep 201504542.992.76$124
Aug 201504440.162.87$126
Jul 201504448.152.95$130
Jun 201504456.152.88$127
May 201505455.212.96$160
Apr 201505849.822.71$157
Mar 201504742.892.93$138
Feb 201504444.662.98$131
Jan 201505043.433.10$155
Dec 201405254.693.59$187
Nov 201404670.464.25$196
Oct 201405478.303.90$211
Sep 201405286.164.05$210
Aug 201413189.394.04$214
Jul 201402096.564.18$84
Jun 201402098.164.74$95
May 201402694.734.73$123
Apr 201402795.944.81$130
Mar 201403395.895.06$167
Feb 201402297.406.19$136
Jan 201403490.404.86$165
Dec 201302991.824.35$126
Nov 201302988.853.74$108
Oct 201304897.423.78$181
Sep 2013046104.113.72$171
Aug 2013072104.253.52$254
Jul 2013061102.523.72$227
Jun 201307894.403.93$307
May 201308894.834.15$365
Apr 201306693.964.28$283
Mar 201307293.623.91$282
Feb 201307891.233.42$267
Jan 201306291.603.42$212
Dec 201208886.773.42$301
Nov 2012012686.953.62$457
Oct 2012013689.383.40$462
Sep 2012013094.672.92$379
Aug 2012015792.662.91$457
Jul 2012016285.133.02$489
Jun 2012013779.822.52$345
May 201207791.612.49$192
Apr 20120179101.652.00$357
Mar 20120727105.052.22$1,615
Feb 20120930101.102.57$2,390
Jan 2012020698.092.73$563
Dec 2011038896.873.24$1,257
Nov 2011089395.723.31$2,957
Oct 2011024584.983.65$894
Sep 2011023083.623.99$917
Aug 2011084083.404.15$3,485
Jul 201101,04594.144.52$4,721
Jun 201101,60192.904.64$7,428
May 2011045898.134.40$2,017
Apr 20110834105.964.33$3,614
Mar 2011082196.364.06$3,331
Feb 2011058185.644.18$2,429
Jan 2011276786.504.59$3,693
Dec 2010079285.734.35$3,443
Nov 2010079080.843.80$2,998
Oct 2010072278.103.51$2,533
Sep 2010071872.633.98$2,857
Aug 20101289773.684.42$4,848
Jul 20101177672.554.74$4,474
Jun 2010085770.364.91$4,208
May 2010077971.124.24$3,299
Apr 2010083381.694.12$3,434
Mar 2010090478.394.39$3,967
Feb 2010080773.585.44$4,392
Jan 2010095774.365.96$5,708
Dec 200901,06671.445.48$5,846
Nov 200901,59774.593.75$5,991
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 2009082367.423.22$2,649
Jul 2009092861.133.46$3,215
Jun 2009071966.163.90$2,801
May 2009077054.743.93$3,023
Apr 2009084646.773.59$3,035
Mar 200901,04242.144.06$4,229
Feb 2009026332.814.63$1,218
Jan 2009051035.865.37$2,739
Dec 2008084737.105.98$5,063
Nov 2008079855.496.86$5,475
Oct 200801,03575.246.92$7,164
Sep 20080975101.767.88$7,680
Aug 20080308114.228.48$2,613
Jul 20080584131.0811.39$6,651
Jun 20080873131.3313.03$11,377
May 200801,041123.1711.57$12,049
Apr 200801,103110.3110.45$11,532
Mar 200801,422101.909.66$13,742
Feb 200801,45392.538.77$12,744
Jan 200801,20090.388.21$9,847
Dec 2007032888.337.30$2,395
Nov 2007040491.677.29$2,946
Oct 2007036682.856.92$2,533
Sep 2007043575.846.24$2,716
Aug 2007046869.066.39$2,990
Jul 2007047270.906.39$3,015
Jun 2007046562.007.55$3,510
May 2007047358.747.85$3,711
Apr 2007055859.617.81$4,355
Mar 200701,08256.927.30$7,901
Feb 2007095855.108.22$7,871
Jan 200701,17450.306.73$7,897
Dec 200601,15256.656.92$7,970
Nov 200601,15754.207.62$8,813
Oct 200601,24254.906.01$7,469
Sep 200601,25660.085.04$6,327
Aug 200601,33868.717.34$9,821
Jul 200601,40169.376.34$8,886
Jun 200601,41266.286.38$9,014
May 200601,56266.016.42$10,036
Apr 200601,78364.397.36$13,124
Mar 2006093456.707.08$6,615
Feb 200601,47557.597.75$11,433
Jan 200601,76260.598.93$15,741
Dec 200501,87654.9413.42$25,167
Nov 200502,04354.6910.59$21,632
Oct 200504,98958.3413.80$68,827
Sep 200507,76561.4512.08$93,793
Aug 200507,31861.519.80$71,693
Jul 200501,51555.697.84$11,883
Jun 200501,55152.337.38$11,448
May 200501,08645.226.65$7,223
Apr 200502,00349.207.36$14,743
Mar 200501,86350.377.15$13,330
Feb 200501,64645.226.31$10,389
Jan 200501,90243.166.32$12,025
Dec 200401,97139.866.75$13,306
Nov 200402,56545.286.33$16,238
Oct 200402,89049.706.52$18,829
Sep 200401,21143.245.28$6,399
Aug 200401,92242.375.55$10,668
Jul 200402,05938.286.08$12,527
Jun 200403,29636.106.43$21,203
May 200405,70037.486.49$37,019
Apr 200404,92734.475.86$28,865
Mar 200409,09034.365.53$50,269
Feb 200408,31232.455.51$45,796

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2019 — as filed, then multipliedworked
Condensate             0 bbl  × $ 59.01 =         $0
Gas                   93 Mcf  × $  2.30 =       $214

────────────────────────────────────────────────────
Month total                                     $214

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/206406 is the state's own key, not one this site invented.