MAYER

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 206408District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$756 k
Apr 2004 – May 2026
Value, last 12 filed months
$25 k
at the published price for each month
Months reported
266
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-07-12157728
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition227 bbl$15,237
GasProduction152,544 Mcf$740,433
Total$755,670

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6001, -100.9086. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.60012, -100.90856 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,508 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,508 ft.

Completions filed
Apr 2004
1 of 1 wells

1 well

42-43536542488,508 ftApr 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (266)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

266 months

May 20260306106.413.05$932
Apr 20261828398.932.87$2,593
Mar 2026037689.753.15$1,184
Feb 20261729963.503.75$2,201
Jan 2026060659.138.00$4,847
Dec 20251635556.664.41$2,473
Nov 2025037658.593.93$1,476
Oct 20251843959.383.30$2,520
Sep 2025056162.743.08$1,726
Aug 2025041363.933.01$1,245
Jul 2025049666.743.32$1,644
Jun 20251747966.483.13$2,629
May 2025052260.553.23$1,687
Apr 2025035462.363.54$1,254
Mar 20251436667.704.27$2,510
Feb 2025038770.884.34$1,680
Jan 2025044274.324.28$1,891
Dec 20241545968.993.12$2,468
Nov 2024045469.052.20$998
Oct 2024039771.372.28$906
Sep 2024045769.612.36$1,081
Aug 20241239475.632.06$1,721
Jul 2024037379.932.15$801
Jun 2024039578.082.63$1,040
May 2024037178.812.20$816
Apr 2024040984.451.66$679
Mar 20241349580.301.55$1,809
Feb 2024029876.091.78$532
Jan 20241236173.023.30$2,067
Dec 2023042571.262.61$1,110
Nov 20231348377.892.81$2,369
Oct 2023039985.443.09$1,232
Sep 2023037789.042.74$1,031
Aug 2023049680.522.67$1,326
Jul 2023059274.852.64$1,564
Jun 2023735968.962.26$1,294
May 2023038870.622.23$864
Apr 2023037978.122.24$848
Mar 2023539572.852.39$1,310
Feb 2023037375.112.47$920
Jan 2023241176.533.39$1,545
Dec 2022041476.415.73$2,372
Nov 2022240185.005.65$2,434
Oct 2022040487.185.86$2,369
Sep 2022039884.888.16$3,249
Aug 2022042494.529.13$3,870
Jul 20220425101.587.54$3,205
Jun 20220415115.097.98$3,311
May 20221429109.378.43$3,727
Apr 20220397104.226.84$2,715
Mar 20221312108.885.08$1,693
Feb 2022029091.054.86$1,409
Jan 2022133381.844.54$1,593
Dec 2021035971.323.90$1,400
Nov 2021035177.435.24$1,838
Oct 2021138579.795.71$2,280
Sep 2021038669.865.35$2,065
Aug 2021036966.024.22$1,557
Jul 2021142870.783.98$1,775
Jun 2021042169.493.38$1,423
May 2021143763.483.02$1,382
Apr 2021042660.362.76$1,175
Mar 2021144661.302.72$1,273
Feb 2021238557.805.55$2,252
Jan 2021044650.412.81$1,253
Dec 2020243644.642.68$1,256
Nov 2020043438.772.71$1,175
Oct 2020145536.972.48$1,165
Sep 2020044237.091.99$880
Aug 2020047639.982.39$1,135
Jul 2020043638.371.83$796
Jun 20201434.901.69$42
May 2020032216.921.81$584
Apr 2020146914.751.80$861
Mar 2020147930.341.86$919
Feb 2020145749.881.98$955
Jan 2020149357.252.09$1,090
Dec 2019049559.012.30$1,141
Nov 2019048455.302.75$1,331
Oct 2019049453.472.42$1,195
Sep 2019049755.052.66$1,321
Aug 2019053453.112.30$1,231
Jul 2019047656.272.46$1,171
Jun 2019046252.782.49$1,151
May 2019048258.482.74$1,321
Apr 2019143862.632.75$1,267
Mar 2019049156.803.06$1,503
Feb 2019144850.852.79$1,302
Jan 2019150646.033.23$1,679
Dec 2018045846.594.19$1,917
Nov 2018146552.934.24$2,023
Oct 2018050261.443.40$1,706
Sep 2018048759.543.11$1,514
Aug 2018051359.403.07$1,573
Jul 2018051365.142.93$1,504
Jun 2018049560.183.08$1,523
May 2018051865.382.90$1,503
Apr 2018050263.842.90$1,456
Mar 2018052261.222.79$1,455
Feb 2018046561.782.77$1,286
Jan 2018051362.874.01$2,057
Dec 2017052157.272.92$1,522
Nov 2017150055.423.12$1,615
Oct 2017151249.292.98$1,577
Sep 2017047447.523.09$1,463
Aug 2017146145.373.00$1,430
Jul 2017049343.873.09$1,522
Jun 2017142342.493.09$1,348
May 2017151345.373.26$1,719
Apr 2017147547.933.21$1,573
Mar 2017155146.772.98$1,691
Feb 2017144550.452.95$1,364
Jan 2017152949.413.42$1,858
Dec 2016153548.763.72$2,040
Nov 2016052442.492.64$1,386
Oct 2016154446.193.09$1,727
Sep 2016151141.553.10$1,626
Aug 2016155041.442.92$1,650
Jul 2016053341.622.92$1,559
Jun 2016148945.352.69$1,359
May 2016057242.521.99$1,139
Apr 2016256036.561.99$1,188
Mar 2016160533.011.79$1,118
Feb 2016159826.472.06$1,261
Jan 2016166927.352.36$1,609
Dec 2015129632.362.00$625
Nov 2015131838.792.17$728
Oct 2015133643.552.43$859
Sep 2015135142.992.76$1,011
Aug 2015136840.162.87$1,097
Jul 2015137348.152.95$1,147
Jun 2015036856.152.88$1,061
May 2015031555.212.96$931
Apr 2015044949.822.71$1,215
Mar 2015056142.892.93$1,646
Feb 2015051744.662.98$1,539
Jan 2015057243.433.10$1,774
Dec 2014055854.693.59$2,004
Nov 2014055470.464.25$2,356
Oct 2014057978.303.90$2,259
Sep 2014055786.164.05$2,253
Aug 2014058789.394.04$2,369
Jul 2014057996.564.18$2,420
Jun 2014056498.164.74$2,672
May 2014055594.734.73$2,623
Apr 2014054795.944.81$2,631
Mar 2014058795.895.06$2,968
Feb 2014052497.406.19$3,245
Jan 2014057290.404.86$2,780
Dec 2013059191.824.35$2,574
Nov 2013053188.853.74$1,985
Oct 2013059797.423.78$2,256
Sep 20130569104.113.72$2,115
Aug 20130539104.253.52$1,899
Jul 20130552102.523.72$2,052
Jun 2013057094.403.93$2,242
May 2013060494.834.15$2,506
Apr 2013058593.964.28$2,505
Mar 2013060293.623.91$2,356
Feb 2013054791.233.42$1,871
Jan 2013060591.603.42$2,069
Dec 2012061886.773.42$2,114
Nov 2012064486.953.62$2,334
Oct 2012066689.383.40$2,264
Sep 2012053194.672.92$1,550
Aug 2012054492.662.91$1,582
Jul 2012054085.133.02$1,631
Jun 2012051279.822.52$1,290
May 2012053691.612.49$1,334
Apr 20120500101.652.00$998
Mar 20120520105.052.22$1,155
Feb 20120468101.102.57$1,203
Jan 2012061998.092.73$1,692
Dec 2011062096.873.24$2,009
Nov 2011059695.723.31$1,974
Oct 2011063184.983.65$2,302
Sep 2011061483.623.99$2,447
Aug 2011065683.404.15$2,722
Jul 2011067194.144.52$3,031
Jun 2011041992.904.64$1,944
May 2011032898.134.40$1,445
Apr 20110609105.964.33$2,639
Mar 2011062696.364.06$2,540
Feb 2011054285.644.18$2,266
Jan 2011061686.504.59$2,827
Dec 2010059985.734.35$2,604
Nov 2010061080.843.80$2,315
Oct 2010043278.103.51$1,516
Sep 2010062272.633.98$2,475
Aug 2010069173.684.42$3,054
Jul 2010061772.554.74$2,922
Jun 2010061970.364.91$3,040
May 2010066571.124.24$2,816
Apr 2010064981.694.12$2,676
Mar 2010067978.394.39$2,980
Feb 2010060173.585.44$3,271
Jan 2010065474.365.96$3,901
Dec 2009058471.445.48$3,203
Nov 2009057374.593.75$2,150
Oct 2009066872.544.11$2,746
Sep 2009063965.543.06$1,958
Aug 2009066467.423.22$2,137
Jul 2009066361.133.46$2,297
Jun 2009064766.163.90$2,520
May 2009070054.743.93$2,748
Apr 2009065246.773.59$2,339
Mar 2009067542.144.06$2,740
Feb 2009062332.814.63$2,886
Jan 2009067335.865.37$3,615
Dec 2008069337.105.98$4,142
Nov 2008067155.496.86$4,603
Oct 2008070675.246.92$4,887
Sep 20080689101.767.88$5,427
Aug 20080711114.228.48$6,031
Jul 20080717131.0811.39$8,166
Jun 20080693131.3313.03$9,032
May 20080713123.1711.57$8,252
Apr 20080709110.3110.45$7,413
Mar 20080729101.909.66$7,045
Feb 2008070092.538.77$6,139
Jan 2008073690.388.21$6,039
Dec 2007074088.337.30$5,403
Nov 2007068991.677.29$5,024
Oct 2007078382.856.92$5,420
Sep 2007075675.846.24$4,721
Aug 2007079169.066.39$5,053
Jul 2007079670.906.39$5,085
Jun 2007075262.007.55$5,676
May 2007082358.747.85$6,457
Apr 2007079059.617.81$6,166
Mar 2007083656.927.30$6,104
Feb 2007075355.108.22$6,187
Jan 2007082150.306.73$5,523
Dec 2006089756.656.92$6,206
Nov 2006082354.207.62$6,269
Oct 2006084754.906.01$5,094
Sep 2006075660.085.04$3,808
Aug 2006083568.717.34$6,129
Jul 2006080969.376.34$5,131
Jun 2006071966.286.38$4,590
May 2006069866.016.42$4,485
Apr 2006070464.397.36$5,182
Mar 2006067856.707.08$4,802
Feb 2006062457.597.75$4,837
Jan 2006065160.598.93$5,816
Dec 2005067954.9413.42$9,109
Nov 2005066754.6910.59$7,062
Oct 2005083358.3413.80$11,492
Sep 2005080961.4512.08$9,772
Aug 2005088861.519.80$8,700
Jul 2005082555.697.84$6,471
Jun 2005087352.337.38$6,444
May 2005098245.226.65$6,531
Apr 200501,01849.207.36$7,493
Mar 200501,10050.377.15$7,870
Feb 200501,05145.226.31$6,634
Jan 200501,15043.166.32$7,271
Dec 200401,21039.866.75$8,169
Nov 200401,29745.286.33$8,211
Oct 200401,33149.706.52$8,672
Sep 200401,24543.245.28$6,578
Aug 200401,28142.375.55$7,110
Jul 200401,35538.286.08$8,244
Jun 200401,52636.106.43$9,817
May 200401,75637.486.49$11,404
Apr 2004079534.475.86$4,657

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  306 Mcf  × $  3.05 =       $932

────────────────────────────────────────────────────
Month total                                     $932

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/206408 is the state's own key, not one this site invented.