Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 207238District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.1 M
Mar 2004 – May 2026
Value, last 12 filed months
$16 k
at the published price for each month
Months reported
267
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-07-08157767
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition209 bbl$13,365
GasProduction193,547 Mcf$1,057,134
Total$1,070,499

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6066, -100.7910. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.60664, -100.79101 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,100 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,100 ft.

Completions filed
Mar 2004
1 of 1 wells

1 well

42-4353666728,100 ftMar 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (267)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

267 months

May 20260408106.413.05$1,243
Apr 2026040698.932.87$1,165
Mar 2026043689.753.15$1,373
Feb 2026033563.503.75$1,256
Jan 2026019859.138.00$1,584
Dec 2025039956.664.41$1,761
Nov 2025036958.593.93$1,449
Oct 2025040559.383.30$1,338
Sep 2025039762.743.08$1,222
Aug 2025036963.933.01$1,112
Jul 2025036966.743.32$1,223
Jun 2025031866.483.13$995
May 2025026560.553.23$857
Apr 2025023862.363.54$843
Mar 2025026267.704.27$1,118
Feb 2025032170.884.34$1,393
Jan 202507374.324.28$312
Dec 2024012068.993.12$375
Nov 2024010469.052.20$229
Oct 2024020771.372.28$472
Sep 2024034169.612.36$806
Aug 2024026875.632.06$553
Jul 2024129379.932.15$709
Jun 2024032878.082.63$864
May 2024029478.812.20$646
Apr 2024030684.451.66$508
Mar 2024034480.301.55$532
Feb 2024026176.091.78$466
Jan 2024024373.023.30$801
Dec 2023013471.262.61$350
Nov 2023015677.892.81$438
Oct 2023017185.443.09$528
Sep 2023015089.042.74$410
Aug 2023022680.522.67$604
Jul 2023022374.852.64$589
Jun 2023024868.962.26$560
May 2023022070.622.23$490
Apr 2023020378.122.24$454
Mar 2023022272.852.39$531
Feb 2023020475.112.47$503
Jan 2023023476.533.39$793
Dec 2022022576.415.73$1,289
Nov 20222622985.005.65$3,503
Oct 2022023887.185.86$1,396
Sep 2022023684.888.16$1,927
Aug 2022120994.529.13$2,002
Jul 20220178101.587.54$1,342
Jun 20220172115.097.98$1,372
May 20220184109.378.43$1,552
Apr 20220177104.226.84$1,210
Mar 20221185108.885.08$1,048
Feb 2022016991.054.86$821
Jan 2022018381.844.54$830
Dec 2021018671.323.90$725
Nov 2021018177.435.24$948
Oct 2021719979.795.71$1,696
Sep 2021019969.865.35$1,065
Aug 2021017766.024.22$747
Jul 2021019670.783.98$780
Jun 2021018769.493.38$632
May 2021034463.483.02$1,038
Apr 2021037860.362.76$1,043
Mar 2021042361.302.72$1,149
Feb 2021021857.805.55$1,209
Jan 2021026950.412.81$756
Dec 2020020644.642.68$551
Nov 2020021238.772.71$574
Oct 2020022636.972.48$560
Sep 2020021737.091.99$432
Aug 2020024339.982.39$580
Jul 2020027138.371.83$495
Jun 2020026434.901.69$446
May 2020032016.921.81$581
Apr 20201530714.751.80$775
Mar 2020032130.341.86$596
Feb 2020030749.881.98$608
Jan 2020034057.252.09$712
Dec 2019028159.012.30$648
Nov 2019036255.302.75$996
Oct 2019035653.472.42$861
Sep 2019038755.052.66$1,028
Aug 2019038553.112.30$887
Jul 2019038856.272.46$955
Jun 2019044952.782.49$1,119
May 2019051658.482.74$1,414
Apr 2019052462.632.75$1,441
Mar 2019048356.803.06$1,479
Feb 2019041450.852.79$1,156
Jan 2019053546.033.23$1,727
Dec 2018058946.594.19$2,465
Nov 2018055052.934.24$2,330
Oct 2018058761.443.40$1,995
Sep 2018056559.543.11$1,756
Aug 2018056859.403.07$1,742
Jul 2018059465.142.93$1,742
Jun 2018058860.183.08$1,809
May 2018074965.382.90$2,173
Apr 2018028963.842.90$838
Mar 2018057061.222.79$1,589
Feb 2018051861.782.77$1,433
Jan 2018056762.874.01$2,273
Dec 2017058157.272.92$1,697
Nov 2017056255.423.12$1,753
Oct 2017058849.292.98$1,754
Sep 2017051747.523.09$1,596
Aug 2017056545.373.00$1,697
Jul 2017062843.873.09$1,939
Jun 2017062542.493.09$1,930
May 2017261245.373.26$2,088
Apr 2017058847.933.21$1,888
Mar 2017065246.772.98$1,945
Feb 2017060550.452.95$1,786
Jan 2017063749.413.42$2,178
Dec 2016066648.763.72$2,479
Nov 2016064742.492.64$1,711
Oct 2016067046.193.09$2,070
Sep 2016063741.553.10$1,975
Aug 2016065541.442.92$1,915
Jul 2016066741.622.92$1,951
Jun 2016066145.352.69$1,775
May 2016070142.521.99$1,396
Apr 2016068536.561.99$1,364
Mar 2016073333.011.79$1,315
Feb 2016072726.472.06$1,500
Jan 2016071227.352.36$1,683
Dec 2015032732.362.00$654
Nov 201501,18738.792.17$2,573
Oct 2015061443.552.43$1,490
Sep 2015064142.992.76$1,768
Aug 2015161940.162.87$1,818
Jul 2015462248.152.95$2,024
Jun 2015057756.152.88$1,663
May 20151763255.212.96$2,806
Apr 2015064949.822.71$1,757
Mar 2015165942.892.93$1,977
Feb 2015463344.662.98$2,063
Jan 2015078043.433.10$2,418
Dec 2014284054.693.59$3,126
Nov 201401,02070.464.25$4,337
Oct 201401,29078.303.90$5,032
Sep 20140286.164.05$8
Aug 201401089.394.04$40
Jul 2014039196.564.18$1,634
Jun 2014036498.164.74$1,724
May 2014054994.734.73$2,595
Apr 2014052095.944.81$2,501
Mar 2014074095.895.06$3,742
Feb 2014037397.406.19$2,310
Jan 2014472490.404.86$3,881
Dec 2013072091.824.35$3,135
Nov 2013070188.853.74$2,621
Oct 2013081797.423.78$3,088
Sep 20130728104.113.72$2,707
Aug 20130692104.253.52$2,438
Jul 20130590102.523.72$2,193
Jun 2013081394.403.93$3,198
May 2013042594.834.15$1,763
Apr 2013041393.964.28$1,769
Mar 2013244193.623.91$1,913
Feb 2013039591.233.42$1,351
Jan 2013049591.603.42$1,693
Dec 2012050586.773.42$1,727
Nov 2012365386.953.62$2,628
Oct 2012167289.383.40$2,374
Sep 2012069494.672.92$2,025
Aug 2012050392.662.91$1,463
Jul 2012041885.133.02$1,263
Jun 2012361679.822.52$1,791
May 2012044991.612.49$1,117
Apr 20120428101.652.00$855
Mar 20120511105.052.22$1,135
Feb 20120448101.102.57$1,151
Jan 2012483298.092.73$2,667
Dec 2011093396.873.24$3,023
Nov 2011079895.723.31$2,642
Oct 2011081884.983.65$2,985
Sep 2011079483.623.99$3,165
Aug 2011084683.404.15$3,510
Jul 2011087794.144.52$3,962
Jun 2011079192.904.64$3,670
May 2011484798.134.40$4,123
Apr 20110787105.964.33$3,410
Mar 2011081896.364.06$3,319
Feb 2011042985.644.18$1,793
Jan 2011087786.504.59$4,024
Dec 2010090385.734.35$3,926
Nov 2010088180.843.80$3,344
Oct 2010493078.103.51$3,576
Sep 2010092372.633.98$3,673
Aug 2010089073.684.42$3,933
Jul 201001,01472.554.74$4,803
Jun 2010380870.364.91$4,179
May 2010093771.124.24$3,968
Apr 2010088681.694.12$3,653
Mar 2010093678.394.39$4,108
Feb 2010085673.585.44$4,659
Jan 2010383674.365.96$5,209
Dec 200901,02971.445.48$5,643
Nov 2009096374.593.75$3,613
Oct 2009097772.544.11$4,016
Sep 2009091265.543.06$2,795
Aug 2009085967.423.22$2,765
Jul 2009081461.133.46$2,820
Jun 2009392766.163.90$3,809
May 200901,16754.743.93$4,581
Apr 2009079746.773.59$2,859
Mar 200901,00042.144.06$4,059
Feb 2009081932.814.63$3,794
Jan 2009397635.865.37$5,350
Dec 2008092937.105.98$5,553
Nov 200801,04055.496.86$7,135
Oct 200831,17675.246.92$8,366
Sep 200801,060101.767.88$8,350
Aug 200801,186114.228.48$10,061
Jul 200831,181131.0811.39$13,844
Jun 200801,215131.3313.03$15,835
May 200801,225123.1711.57$14,179
Apr 200801,238110.3110.45$12,943
Mar 200831,243101.909.66$12,318
Feb 200801,22392.538.77$10,726
Jan 2008090190.388.21$7,393
Dec 2007298588.337.30$7,369
Nov 200731,18191.677.29$8,887
Oct 200701,26882.856.92$8,777
Sep 200701,24775.846.24$7,786
Aug 200731,30469.066.39$8,537
Jul 200701,16070.906.39$7,410
Jun 200731,29062.007.55$9,924
May 200701,38558.747.85$10,867
Apr 200731,29459.617.81$10,279
Mar 200701,14156.927.30$8,332
Feb 200701,32055.108.22$10,845
Jan 200731,47050.306.73$10,039
Dec 200601,47156.656.92$10,177
Nov 200631,37754.207.62$10,652
Oct 200601,31754.906.01$7,920
Sep 200641,41360.085.04$7,358
Aug 200601,31768.717.34$9,667
Jul 200601,38369.376.34$8,772
Jun 200641,45866.286.38$9,573
May 200601,50266.016.42$9,650
Apr 200651,95664.397.36$14,719
Mar 200602,01556.707.08$14,272
Feb 200651,74657.597.75$13,821
Jan 200652,09160.598.93$18,983
Dec 200551,76854.9413.42$23,993
Nov 200502,08954.6910.59$22,119
Oct 200552,25158.3413.80$31,346
Sep 200502,19061.4512.08$26,453
Aug 200502,21061.519.80$21,651
Jul 200552,16255.697.84$17,236
Jun 200501,97252.337.38$14,555
May 200502,10745.226.65$14,014
Apr 200542,14949.207.36$16,014
Mar 200502,29450.377.15$16,413
Feb 200541,90745.226.31$12,218
Jan 200532,10343.166.32$13,425
Dec 200421,87239.866.75$12,718
Nov 200431,61845.286.33$10,378
Oct 200401,75649.706.52$11,441
Sep 200421,59943.245.28$8,535
Aug 200401,23142.375.55$6,833
Jul 2004299738.286.08$6,142
Jun 200401,05036.106.43$6,755
May 200431,27437.486.49$8,387
Apr 200401,74434.475.86$10,217
Mar 2004034034.365.53$1,880

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  408 Mcf  × $  3.05 =     $1,243

────────────────────────────────────────────────────
Month total                                   $1,243

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/207238 is the state's own key, not one this site invented.