Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 207469District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.4 M
Apr 2004 – May 2026
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
266
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-05-24157908
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition73 bbl$3,709
GasProduction233,757 Mcf$1,351,927
Total$1,355,636

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6218, -100.8330. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.62179, -100.83303 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,100 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,100 ft.

Completions filed
Apr 2004
1 of 1 wells

1 well

42-4353670928,100 ftApr 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (266)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

266 months

May 20260170106.413.05$518
Apr 2026015498.932.87$442
Mar 2026016789.753.15$526
Feb 2026015463.503.75$578
Jan 2026017259.138.00$1,376
Dec 2025017656.664.41$777
Nov 2025016658.593.93$652
Oct 2025018659.383.30$615
Sep 2025017562.743.08$538
Aug 2025018463.933.01$555
Jul 2025019166.743.32$633
Jun 2025023366.483.13$729
May 2025014360.553.23$462
Apr 2025018162.363.54$641
Mar 2025020067.704.27$854
Feb 2025018970.884.34$820
Jan 2025024874.324.28$1,061
Dec 2024025468.993.12$793
Nov 2024017069.052.20$374
Oct 2024017971.372.28$408
Sep 2024017469.612.36$411
Aug 2024018175.632.06$374
Jul 2024018079.932.15$386
Jun 2024017778.082.63$466
May 2024018478.812.20$405
Apr 2024018784.451.66$310
Mar 2024018980.301.55$292
Feb 2024018076.091.78$321
Jan 2024019173.023.30$630
Dec 2023019571.262.61$509
Nov 2023019277.892.81$539
Oct 2023020585.443.09$633
Sep 2023020389.042.74$555
Aug 2023021280.522.67$567
Jul 2023021474.852.64$565
Jun 2023021168.962.26$477
May 2023021970.622.23$488
Apr 2023021278.122.24$474
Mar 2023021972.852.39$524
Feb 2023020075.112.47$493
Jan 2023022076.533.39$745
Dec 2022023276.415.73$1,329
Nov 2022021485.005.65$1,208
Oct 2022022787.185.86$1,331
Sep 2022022584.888.16$1,837
Aug 2022023594.529.13$2,145
Jul 20220236101.587.54$1,780
Jun 20220229115.097.98$1,827
May 20220239109.378.43$2,016
Apr 20220234104.226.84$1,600
Mar 20220244108.885.08$1,239
Feb 2022021791.054.86$1,054
Jan 2022024581.844.54$1,112
Dec 2021025171.323.90$979
Nov 2021024677.435.24$1,288
Oct 2021026479.795.71$1,508
Sep 2021025469.865.35$1,359
Aug 2021026866.024.22$1,131
Jul 2021026970.783.98$1,071
Jun 2021026869.493.38$906
May 2021227363.483.02$951
Apr 2021026760.362.76$737
Mar 2021028461.302.72$772
Feb 2021023357.805.55$1,293
Jan 2021028350.412.81$795
Dec 2020028544.642.68$763
Nov 2020028738.772.71$777
Oct 2020029436.972.48$729
Sep 2020028837.091.99$573
Aug 2020030239.982.39$720
Jul 2020030838.371.83$562
Jun 2020030934.901.69$522
May 2020030216.921.81$548
Apr 2020029414.751.80$530
Mar 2020031030.341.86$575
Feb 2020029649.881.98$586
Jan 2020031457.252.09$658
Dec 2019029759.012.30$684
Nov 2019029355.302.75$806
Oct 2019031653.472.42$764
Sep 2019034255.052.66$909
Aug 2019035453.112.30$816
Jul 2019032856.272.46$807
Jun 2019021152.782.49$526
May 2019033258.482.74$910
Apr 2019135362.632.75$1,034
Mar 2019034056.803.06$1,041
Feb 2019039750.852.79$1,109
Jan 2019044046.033.23$1,420
Dec 2018044746.594.19$1,871
Nov 2018043752.934.24$1,852
Oct 2018046661.443.40$1,584
Sep 2018045159.543.11$1,402
Aug 2018043959.403.07$1,346
Jul 2018047165.142.93$1,381
Jun 2018041960.183.08$1,289
May 2018147065.382.90$1,429
Apr 2018147363.842.90$1,436
Mar 2018146661.222.79$1,360
Feb 2018137461.782.77$1,096
Jan 2018146062.874.01$1,907
Dec 2017243657.272.92$1,388
Nov 2017148355.423.12$1,562
Oct 2017350849.292.98$1,664
Sep 2017149747.523.09$1,582
Aug 2017152845.373.00$1,632
Jul 2017153243.873.09$1,686
Jun 2017147442.493.09$1,506
May 2017345445.373.26$1,618
Apr 2017145647.933.21$1,512
Mar 2017148446.772.98$1,491
Feb 2017345150.452.95$1,483
Jan 2017350349.413.42$1,868
Dec 2016150048.763.72$1,910
Nov 2016249142.492.64$1,383
Oct 2016149246.193.09$1,567
Sep 2016145341.553.10$1,446
Aug 2016144241.442.92$1,334
Jul 2016244341.622.92$1,379
Jun 2016251145.352.69$1,463
May 2016252142.521.99$1,122
Apr 2016351036.561.99$1,125
Mar 2016355233.011.79$1,089
Feb 2016352826.472.06$1,169
Jan 2016256727.352.36$1,395
Dec 2015256132.362.00$1,188
Nov 2015155638.792.17$1,244
Oct 2015155343.552.43$1,385
Sep 2015355742.992.76$1,665
Aug 2015154440.162.87$1,603
Jul 2015360648.152.95$1,929
Jun 2015061256.152.88$1,764
May 2015068055.212.96$2,010
Apr 2015072149.822.71$1,951
Mar 201501,05142.892.93$3,084
Feb 2015042544.662.98$1,265
Jan 2015043343.433.10$1,343
Dec 2014042754.693.59$1,534
Nov 2014043570.464.25$1,850
Oct 2014047878.303.90$1,865
Sep 2014045786.164.05$1,849
Aug 2014048589.394.04$1,957
Jul 2014050396.564.18$2,102
Jun 2014052998.164.74$2,506
May 2014053294.734.73$2,515
Apr 2014051295.944.81$2,462
Mar 2014044095.895.06$2,225
Feb 2014038497.406.19$2,378
Jan 2014051690.404.86$2,508
Dec 2013054791.824.35$2,382
Nov 2013056288.853.74$2,101
Oct 2013056997.423.78$2,150
Sep 20130566104.113.72$2,104
Aug 20130583104.253.52$2,054
Jul 20130599102.523.72$2,227
Jun 2013060394.403.93$2,372
May 2013062894.834.15$2,606
Apr 2013063693.964.28$2,724
Mar 2013067893.623.91$2,653
Feb 2013059391.233.42$2,028
Jan 2013069991.603.42$2,391
Dec 2012070886.773.42$2,421
Nov 2012050186.953.62$1,816
Oct 2012053589.383.40$1,819
Sep 2012054894.672.92$1,599
Aug 2012056592.662.91$1,643
Jul 20121064585.133.02$2,800
Jun 2012065379.822.52$1,645
May 2012069491.612.49$1,727
Apr 20120709101.652.00$1,416
Mar 20120823105.052.22$1,829
Feb 201201,087101.102.57$2,794
Jan 2012071098.092.73$1,941
Dec 2011055996.873.24$1,811
Nov 2011051195.723.31$1,692
Oct 2011053884.983.65$1,963
Sep 2011084283.623.99$3,356
Aug 201101,02383.404.15$4,245
Jul 201101,08794.144.52$4,910
Jun 201101,09792.904.64$5,090
May 201101,08398.134.40$4,770
Apr 20110534105.964.33$2,314
Mar 2011073896.364.06$2,994
Feb 2011063485.644.18$2,650
Jan 2011072786.504.59$3,336
Dec 2010073485.734.35$3,191
Nov 2010074580.843.80$2,828
Oct 2010078078.103.51$2,737
Sep 2010078672.633.98$3,128
Aug 2010083373.684.42$3,681
Jul 2010084672.554.74$4,007
Jun 2010083170.364.91$4,081
May 2010088871.124.24$3,761
Apr 2010086681.694.12$3,570
Mar 2010090178.394.39$3,954
Feb 2010086273.585.44$4,691
Jan 201001,01174.365.96$6,030
Dec 200901,02071.445.48$5,593
Nov 200901,02274.593.75$3,834
Oct 200901,03772.544.11$4,262
Sep 200901,04665.543.06$3,206
Aug 200901,09967.423.22$3,537
Jul 200901,12661.133.46$3,901
Jun 200901,07966.163.90$4,203
May 200901,15954.743.93$4,550
Apr 200901,16746.773.59$4,187
Mar 200901,18842.144.06$4,822
Feb 200901,08332.814.63$5,018
Jan 200901,20535.865.37$6,472
Dec 200801,19737.105.98$7,155
Nov 200801,16055.496.86$7,958
Oct 200801,28075.246.92$8,860
Sep 200801,249101.767.88$9,838
Aug 200801,316114.228.48$11,164
Jul 200801,296131.0811.39$14,761
Jun 200801,297131.3313.03$16,903
May 200801,379123.1711.57$15,961
Apr 200801,354110.3110.45$14,156
Mar 200801,375101.909.66$13,288
Feb 200801,30192.538.77$11,411
Jan 200801,39990.388.21$11,480
Dec 200701,42988.337.30$10,435
Nov 200701,40491.677.29$10,238
Oct 200701,42582.856.92$9,864
Sep 200701,40275.846.24$8,754
Aug 200701,55569.066.39$9,933
Jul 200701,12670.906.39$7,193
Jun 200701,50362.007.55$11,345
May 200701,61958.747.85$12,703
Apr 200701,56459.617.81$12,207
Mar 200701,68756.927.30$12,318
Feb 200701,33055.108.22$10,927
Jan 200701,55750.306.73$10,474
Dec 200601,69556.656.92$11,727
Nov 200601,67854.207.62$12,782
Oct 200601,78954.906.01$10,759
Sep 200601,84460.085.04$9,289
Aug 200601,96768.717.34$14,438
Jul 200602,01269.376.34$12,762
Jun 200601,84466.286.38$11,772
May 200602,04066.016.42$13,107
Apr 200602,06264.397.36$15,177
Mar 200602,11756.707.08$14,995
Feb 200602,15757.597.75$16,719
Jan 200602,53460.598.93$22,637
Dec 200502,44554.9413.42$32,801
Nov 200502,55654.6910.59$27,064
Oct 200501,93258.3413.80$26,653
Sep 200502,19661.4512.08$26,525
Aug 200502,42261.519.80$23,728
Jul 200502,50355.697.84$19,633
Jun 200502,54452.337.38$18,777
May 200503,08345.226.65$20,506
Apr 200503,17349.207.36$23,355
Mar 200503,38850.377.15$24,241
Feb 200503,05245.226.31$19,264
Jan 200503,56543.166.32$22,539
Dec 200403,17239.866.75$21,414
Nov 200402,89545.286.33$18,327
Oct 200402,82949.706.52$18,431
Sep 200403,77743.245.28$19,957
Aug 200403,79842.375.55$21,081
Jul 200405,63438.286.08$34,278
Jun 200406,61536.106.43$42,554
May 200408,82837.486.49$57,334
Apr 200406,72734.475.86$39,410

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  170 Mcf  × $  3.05 =       $518

────────────────────────────────────────────────────
Month total                                     $518

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/207469 is the state's own key, not one this site invented.