Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 207491District 7CField 679952002 tax incentive programmesGasSaveExport
Value, all time
$904 k
Sep 2004 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
261
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-01-31167110
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction164,168 Mcf$903,734
Total$903,734

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5422, -101.3424. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.54222, -101.34236 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,875 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,875 ft.

Completions filed
Sep 2004
1 of 1 wells

1 well

42-10539311126,875 ftSep 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (261)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

261 months

May 2026149106.413.05$454
Apr 202619098.932.87$545
Mar 2026089.753.15$0
Feb 202617763.503.75$664
Jan 202624359.138.00$1,943
Dec 2025056.664.41$0
Nov 2025158.593.93$4
Oct 20251159.383.30$36
Sep 202510562.743.08$323
Aug 202511963.933.01$359
Jul 202514766.743.32$487
Jun 202511566.483.13$360
May 202511060.553.23$356
Apr 20257262.363.54$255
Mar 202513267.704.27$563
Feb 202510170.884.34$438
Jan 202512674.324.28$539
Dec 20247268.993.12$225
Nov 20248269.052.20$180
Oct 20249871.372.28$224
Sep 20241069.612.36$24
Aug 20246175.632.06$126
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 202312774.852.64$336
Jun 202316068.962.26$361
May 202330570.622.23$679
Apr 202330578.122.24$683
Mar 202327872.852.39$665
Feb 202325775.112.47$634
Jan 202335176.533.39$1,189
Dec 202230476.415.73$1,742
Nov 202230885.005.65$1,739
Oct 202233087.185.86$1,935
Sep 202225484.888.16$2,074
Aug 202229294.529.13$2,665
Jul 2022359101.587.54$2,708
Jun 2022366115.097.98$2,920
May 2022304109.378.43$2,564
Apr 2022333104.226.84$2,277
Mar 2022379108.885.08$1,924
Feb 202238491.054.86$1,866
Jan 202222081.844.54$998
Dec 20216371.323.90$246
Nov 202133677.435.24$1,760
Oct 202142479.795.71$2,423
Sep 202132369.865.35$1,728
Aug 202121866.024.22$920
Jul 202111770.783.98$466
Jun 202127269.493.38$920
May 202130263.483.02$911
Apr 202121160.362.76$582
Mar 202125961.302.72$704
Feb 202115457.805.55$854
Jan 202129350.412.81$823
Dec 202047044.642.68$1,257
Nov 202046438.772.71$1,256
Oct 202016636.972.48$411
Sep 202038637.091.99$769
Aug 202049139.982.39$1,171
Jul 202016738.371.83$305
Jun 202022734.901.69$384
May 202039416.921.81$715
Apr 202038814.751.80$700
Mar 202037130.341.86$689
Feb 202058149.881.98$1,151
Jan 202024657.252.09$515
Dec 201919659.012.30$452
Nov 201924455.302.75$671
Oct 201927753.472.42$670
Sep 201947255.052.66$1,254
Aug 201944453.112.30$1,023
Jul 201954556.272.46$1,341
Jun 201932352.782.49$805
May 201923958.482.74$655
Apr 20196062.632.75$165
Mar 201923956.803.06$732
Feb 201923950.852.79$667
Jan 201923946.033.23$772
Dec 201823946.594.19$1,000
Nov 201846752.934.24$1,979
Oct 201845561.443.40$1,546
Sep 201850959.543.11$1,582
Aug 201855859.403.07$1,711
Jul 201850565.142.93$1,481
Jun 201847960.183.08$1,474
May 201845365.382.90$1,314
Apr 201854463.842.90$1,578
Mar 201858861.222.79$1,639
Feb 201848161.782.77$1,331
Jan 201863362.874.01$2,538
Dec 201761957.272.92$1,808
Nov 201761255.423.12$1,908
Oct 201759649.292.98$1,778
Sep 201754547.523.09$1,683
Aug 201761645.373.00$1,851
Jul 201762343.873.09$1,923
Jun 201763542.493.09$1,960
May 201770845.373.26$2,310
Apr 201773647.933.21$2,364
Mar 201784446.772.98$2,518
Feb 201769050.452.95$2,037
Jan 201792049.413.42$3,145
Dec 20161,00048.763.72$3,723
Nov 201643242.492.64$1,142
Oct 201642446.193.09$1,310
Sep 201653941.553.10$1,671
Aug 201653941.442.92$1,576
Jul 201645641.622.92$1,334
Jun 201634845.352.69$935
May 201644242.521.99$880
Apr 201645136.561.99$898
Mar 201636933.011.79$662
Feb 201655326.472.06$1,141
Jan 201684827.352.36$2,005
Dec 201590032.362.00$1,801
Nov 201589338.792.17$1,935
Oct 201595243.552.43$2,310
Sep 201594742.992.76$2,612
Aug 201595940.162.87$2,755
Jul 201599548.152.95$2,930
Jun 20151,13556.152.88$3,272
May 201555855.212.96$1,649
Apr 201586549.822.71$2,341
Mar 20151,03742.892.93$3,043
Feb 201569344.662.98$2,063
Jan 201559143.433.10$1,832
Dec 201467854.693.59$2,435
Nov 201468970.464.25$2,930
Oct 201477278.303.90$3,012
Sep 201483486.164.05$3,374
Aug 201489889.394.04$3,624
Jul 201494696.564.18$3,954
Jun 201484298.164.74$3,988
May 20141,20694.734.73$5,700
Apr 20141,24995.944.81$6,007
Mar 201456395.895.06$2,847
Feb 201442197.406.19$2,607
Jan 201449490.404.86$2,401
Dec 201351191.824.35$2,225
Nov 201332988.853.74$1,230
Oct 201338897.423.78$1,466
Sep 2013328104.113.72$1,219
Aug 2013261104.253.52$919
Jul 2013156102.523.72$580
Jun 201354794.403.93$2,152
May 201346294.834.15$1,917
Apr 201355093.964.28$2,355
Mar 201346293.623.91$1,808
Feb 201366691.233.42$2,278
Jan 201356591.603.42$1,932
Dec 201237886.773.42$1,293
Nov 201236486.953.62$1,319
Oct 201236889.383.40$1,251
Sep 201237894.672.92$1,103
Aug 201238492.662.91$1,117
Jul 201237985.133.02$1,145
Jun 201239379.822.52$990
May 201237391.612.49$928
Apr 2012346101.652.00$691
Mar 2012360105.052.22$800
Feb 2012359101.102.57$923
Jan 201239598.092.73$1,080
Dec 201137896.873.24$1,225
Nov 201135595.723.31$1,176
Oct 201137384.983.65$1,361
Sep 201140983.623.99$1,630
Aug 201147983.404.15$1,988
Jul 201155194.144.52$2,489
Jun 201161892.904.64$2,867
May 201167498.134.40$2,969
Apr 2011349105.964.33$1,512
Mar 201163496.364.06$2,572
Feb 201160585.644.18$2,529
Jan 201167886.504.59$3,111
Dec 201073385.734.35$3,187
Nov 201067080.843.80$2,543
Oct 201066078.103.51$2,316
Sep 201065972.633.98$2,622
Aug 201072573.684.42$3,204
Jul 201075072.554.74$3,552
Jun 201067670.364.91$3,319
May 201062271.124.24$2,634
Apr 201037581.694.12$1,546
Mar 201046278.394.39$2,028
Feb 201045173.585.44$2,455
Jan 201050074.365.96$2,982
Dec 200949171.445.48$2,693
Nov 200950174.593.75$1,880
Oct 200942572.544.11$1,747
Sep 200943565.543.06$1,333
Aug 200947167.423.22$1,516
Jul 200945061.133.46$1,559
Jun 200940166.163.90$1,562
May 200954954.743.93$2,155
Apr 200946046.773.59$1,650
Mar 200950242.144.06$2,038
Feb 200949232.814.63$2,279
Jan 200969435.865.37$3,727
Dec 200810737.105.98$640
Nov 200869255.496.86$4,747
Oct 200888475.246.92$6,119
Sep 2008684101.767.88$5,388
Aug 2008918114.228.48$7,787
Jul 2008816131.0811.39$9,294
Jun 2008811131.3313.03$10,569
May 2008964123.1711.57$11,158
Apr 2008896110.3110.45$9,368
Mar 2008895101.909.66$8,649
Feb 200890192.538.77$7,902
Jan 200894390.388.21$7,738
Dec 200799688.337.30$7,273
Nov 200797691.677.29$7,117
Oct 20071,00382.856.92$6,943
Sep 20071,01375.846.24$6,325
Aug 200799969.066.39$6,382
Jul 20071,01570.906.39$6,484
Jun 20071,01662.007.55$7,669
May 200788658.747.85$6,952
Apr 20071,05259.617.81$8,211
Mar 20071,15156.927.30$8,405
Feb 20071,06055.108.22$8,709
Jan 20071,65250.306.73$11,113
Dec 200696856.656.92$6,697
Nov 20061,04854.207.62$7,983
Oct 20061,21254.906.01$7,289
Sep 20061,23160.085.04$6,201
Aug 20061,10168.717.34$8,081
Jul 20061,18969.376.34$7,542
Jun 20061,39866.286.38$8,925
May 20061,40566.016.42$9,027
Apr 20061,41464.397.36$10,408
Mar 20061,37056.707.08$9,704
Feb 20061,22357.597.75$9,480
Jan 20061,37560.598.93$12,283
Dec 20051,49454.9413.42$20,043
Nov 20051,63454.6910.59$17,301
Oct 20051,73858.3413.80$23,977
Sep 20051,19661.4512.08$14,446
Aug 20051,91261.519.80$18,732
Jul 20051,73155.697.84$13,577
Jun 20051,99652.337.38$14,733
May 20052,40345.226.65$15,983
Apr 20052,42849.207.36$17,871
Mar 20052,81950.377.15$20,170
Feb 20052,94345.226.31$18,576
Jan 20053,17543.166.32$20,073
Dec 20043,52839.866.75$23,818
Nov 20043,92145.286.33$24,822
Oct 20045,87749.706.52$38,289
Sep 2004043.245.28$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                  149 Mcf  × $  3.05 =       $454

────────────────────────────────────────────────────
Month total                                     $454

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well