HILL-MAYER, EDWIN S. JR. "X"

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 208515District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$284 k
Jul 2004 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
263
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-01-31159152
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1 bbl$63
GasProduction37,816 Mcf$283,641
Total$283,705

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6314, -100.8213. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.63143, -100.82125 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,910 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,910 ft.

Completions filed
Jul 2004
1 of 1 wells

1 well

42-4353686957,910 ftJul 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (263)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

263 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210179.795.71$6
Sep 20210169.865.35$5
Aug 20210166.024.22$4
Jul 20210170.783.98$4
Jun 20210169.493.38$3
May 20211063.483.02$63
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200136.972.48$2
Sep 20200137.091.99$2
Aug 20200239.982.39$5
Jul 20200138.371.83$2
Jun 20200134.901.69$2
May 20200116.921.81$2
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190155.302.75$3
Oct 20190353.472.42$7
Sep 20190455.052.66$11
Aug 20190353.112.30$7
Jul 20190256.272.46$5
Jun 20190152.782.49$2
May 20190158.482.74$3
Apr 20190162.632.75$3
Mar 20190156.803.06$3
Feb 20190150.852.79$3
Jan 20190146.033.23$3
Dec 20180246.594.19$8
Nov 20180352.934.24$13
Oct 20180461.443.40$14
Sep 20180559.543.11$16
Aug 20180659.403.07$18
Jul 20180665.142.93$18
Jun 20180260.183.08$6
May 20180265.382.90$6
Apr 20180163.842.90$3
Mar 20180161.222.79$3
Feb 20180161.782.77$3
Jan 20180262.874.01$8
Dec 20170457.272.92$12
Nov 20170755.423.12$22
Oct 20170649.292.98$18
Sep 201701247.523.09$37
Aug 201701145.373.00$33
Jul 201701343.873.09$40
Jun 201701042.493.09$31
May 20170645.373.26$20
Apr 20170447.933.21$13
Mar 20170646.772.98$18
Feb 20170550.452.95$15
Jan 20170549.413.42$17
Dec 20160948.763.72$34
Nov 201601542.492.64$40
Oct 201604146.193.09$127
Sep 201601041.553.10$31
Aug 201601441.442.92$41
Jul 201601141.622.92$32
Jun 201601445.352.69$38
May 201601442.521.99$28
Apr 201601436.561.99$28
Mar 201601533.011.79$27
Feb 201601326.472.06$27
Jan 201601427.352.36$33
Dec 201501932.362.00$38
Nov 20150938.792.17$20
Oct 20150443.552.43$10
Sep 20150542.992.76$14
Aug 20150940.162.87$26
Jul 201502648.152.95$77
Jun 201503156.152.88$89
May 201503055.212.96$89
Apr 201502749.822.71$73
Mar 201502642.892.93$76
Feb 201502444.662.98$71
Jan 201503243.433.10$99
Dec 201402954.693.59$104
Nov 201403470.464.25$145
Oct 201401478.303.90$55
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140897.406.19$50
Jan 201403090.404.86$146
Dec 201303091.824.35$131
Nov 201303088.853.74$112
Oct 201303297.423.78$121
Sep 2013032104.113.72$119
Aug 2013034104.253.52$120
Jul 2013035102.523.72$130
Jun 201303694.403.93$142
May 201305294.834.15$216
Apr 201305493.964.28$231
Mar 201302193.623.91$82
Feb 201301891.233.42$62
Jan 201302791.603.42$92
Dec 201201886.773.42$62
Nov 201201486.953.62$51
Oct 201203889.383.40$129
Sep 201201894.672.92$53
Aug 201201392.662.91$38
Jul 201202385.133.02$69
Jun 201202579.822.52$63
May 201203391.612.49$82
Apr 201200101.652.00$0
Mar 2012012105.052.22$27
Feb 2012036101.102.57$93
Jan 201202798.092.73$74
Dec 201104096.873.24$130
Nov 201109295.723.31$305
Oct 201101284.983.65$44
Sep 201103983.623.99$155
Aug 20110083.404.15$0
Jul 20110194.144.52$5
Jun 201101192.904.64$51
May 201101398.134.40$57
Apr 2011013105.964.33$56
Mar 201102596.364.06$101
Feb 201101785.644.18$71
Jan 201102386.504.59$106
Dec 201002985.734.35$126
Nov 201004180.843.80$156
Oct 2010011378.103.51$397
Sep 201004072.633.98$159
Aug 201008373.684.42$367
Jul 201005772.554.74$270
Jun 201007070.364.91$344
May 201007171.124.24$301
Apr 201006781.694.12$276
Mar 201007678.394.39$334
Feb 201009873.585.44$533
Jan 2010015274.365.96$907
Dec 2009019471.445.48$1,064
Nov 200906474.593.75$240
Oct 2009018672.544.11$765
Sep 2009025665.543.06$785
Aug 2009012567.423.22$402
Jul 2009021261.133.46$734
Jun 2009027266.163.90$1,059
May 2009018954.743.93$742
Apr 2009031246.773.59$1,119
Mar 2009021142.144.06$856
Feb 2009020232.814.63$936
Jan 2009022735.865.37$1,219
Dec 2008025737.105.98$1,536
Nov 2008026755.496.86$1,832
Oct 2008028475.246.92$1,966
Sep 20080269101.767.88$2,119
Aug 20080242114.228.48$2,053
Jul 20080205131.0811.39$2,335
Jun 20080331131.3313.03$4,314
May 20080346123.1711.57$4,005
Apr 20080342110.3110.45$3,576
Mar 20080357101.909.66$3,450
Feb 2008031192.538.77$2,728
Jan 2008025190.388.21$2,060
Dec 2007030688.337.30$2,234
Nov 2007033091.677.29$2,406
Oct 2007031082.856.92$2,146
Sep 2007028675.846.24$1,786
Aug 2007030269.066.39$1,929
Jul 2007033070.906.39$2,108
Jun 2007035662.007.55$2,687
May 2007038558.747.85$3,021
Apr 2007037459.617.81$2,919
Mar 2007037556.927.30$2,738
Feb 2007036155.108.22$2,966
Jan 2007041450.306.73$2,785
Dec 2006041656.656.92$2,878
Nov 2006028254.207.62$2,148
Oct 2006019654.906.01$1,179
Sep 2006031360.085.04$1,577
Aug 2006044468.717.34$3,259
Jul 2006031369.376.34$1,985
Jun 2006032666.286.38$2,081
May 2006031166.016.42$1,998
Apr 2006041964.397.36$3,084
Mar 2006057656.707.08$4,080
Feb 2006098557.597.75$7,635
Jan 200601,23860.598.93$11,059
Dec 200501,04754.9413.42$14,046
Nov 200501,20654.6910.59$12,770
Oct 200501,06158.3413.80$14,637
Sep 200501,50261.4512.08$18,143
Aug 200501,50361.519.80$14,725
Jul 200501,23955.697.84$9,718
Jun 2005073652.337.38$5,432
May 2005051345.226.65$3,412
Apr 2005084749.207.36$6,234
Mar 2005078850.377.15$5,638
Feb 2005058945.226.31$3,718
Jan 200501,37443.166.32$8,687
Dec 2004089939.866.75$6,069
Nov 2004087445.286.33$5,533
Oct 2004047749.706.52$3,108
Sep 2004094643.245.28$4,999
Aug 200401,35942.375.55$7,543
Jul 200402,45938.286.08$14,961

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2021 — as filed, then multipliedworked
Condensate             0 bbl  × $ 79.79 =         $0
Gas                    1 Mcf  × $  5.71 =         $6

────────────────────────────────────────────────────
Month total                                       $6

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/208515 is the state's own key, not one this site invented.