DUKE WILSON 189

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 208573District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.9 M
Aug 2004 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
262
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas222005-07-12 – 2006-01-032 dockets
NGPA2none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition35 bbl$1,768
GasProduction320,694 Mcf$1,877,901
Total$1,879,669

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4441, -100.7725. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.44411, -100.77252 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,900 ft.

Completions filed
Aug 2004
1 of 1 wells

1 well

42-43536893158,900 ftAug 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (262)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

262 months

May 20260308106.413.05$938
Apr 2026030098.932.87$861
Mar 2026030989.753.15$973
Feb 2026028463.503.75$1,065
Jan 2026029159.138.00$2,327
Dec 2025031356.664.41$1,381
Nov 2025030258.593.93$1,186
Oct 2025031359.383.30$1,034
Sep 2025030562.743.08$938
Aug 2025031463.933.01$947
Jul 2025032066.743.32$1,061
Jun 2025031066.483.13$970
May 2025032260.553.23$1,041
Apr 2025031262.363.54$1,105
Mar 2025032067.704.27$1,366
Feb 2025028770.884.34$1,246
Jan 2025031874.324.28$1,361
Dec 2024032368.993.12$1,008
Nov 2024031569.052.20$693
Oct 2024032871.372.28$748
Sep 2024032069.612.36$757
Aug 2024033375.632.06$687
Jul 2024033579.932.15$719
Jun 2024033178.082.63$872
May 2024034478.812.20$756
Apr 2024033084.451.66$548
Mar 2024034480.301.55$532
Feb 2024032676.091.78$581
Jan 2024034173.023.30$1,125
Dec 2023034771.262.61$906
Nov 2023033977.892.81$952
Oct 2023035185.443.09$1,084
Sep 2023034289.042.74$935
Aug 2023035480.522.67$946
Jul 2023035674.852.64$940
Jun 2023034668.962.26$781
May 2023035470.622.23$789
Apr 2023034878.122.24$779
Mar 2023036272.852.39$866
Feb 2023033875.112.47$833
Jan 2023035676.533.39$1,206
Dec 2022036076.415.73$2,062
Nov 2022033385.005.65$1,880
Oct 2022034887.185.86$2,041
Sep 2022033984.888.16$2,767
Aug 2022035394.529.13$3,222
Jul 20220357101.587.54$2,693
Jun 20220345115.097.98$2,752
May 20220360109.378.43$3,036
Apr 20220351104.226.84$2,400
Mar 20220366108.885.08$1,858
Feb 2022033191.054.86$1,608
Jan 2022037181.844.54$1,683
Dec 2021037871.323.90$1,474
Nov 2021035877.435.24$1,875
Oct 2021038179.795.71$2,177
Sep 2021037169.865.35$1,985
Aug 2021038866.024.22$1,638
Jul 2021039170.783.98$1,557
Jun 2021039769.493.38$1,342
May 2021039763.483.02$1,198
Apr 2021039160.362.76$1,079
Mar 2021045561.302.72$1,236
Feb 2021034757.805.55$1,925
Jan 2021041850.412.81$1,175
Dec 2020037744.642.68$1,009
Nov 2020038538.772.71$1,042
Oct 2020040336.972.48$999
Sep 2020039037.091.99$777
Aug 2020141239.982.39$1,023
Jul 2020041938.371.83$765
Jun 2020041034.901.69$693
May 2020042516.921.81$771
Apr 2020041314.751.80$745
Mar 2020043430.341.86$806
Feb 2020041349.881.98$818
Jan 2020144557.252.09$989
Dec 2019145559.012.30$1,107
Nov 2019146155.302.75$1,323
Oct 2019049853.472.42$1,204
Sep 2019335155.052.66$1,098
Aug 20191253.112.30$58
Jul 2019012556.272.46$308
Jun 2019233852.782.49$948
May 2019049758.482.74$1,362
Apr 2019022562.632.75$619
Mar 2019121556.803.06$715
Feb 2019020350.852.79$567
Jan 2019112946.033.23$462
Dec 201814446.594.19$231
Nov 20181041952.934.24$2,305
Oct 2018017861.443.40$605
Sep 2018242259.543.11$1,431
Aug 201802359.403.07$71
Jul 2018045365.142.93$1,328
Jun 2018046860.183.08$1,440
May 2018048365.382.90$1,401
Apr 2018053463.842.90$1,549
Mar 2018062161.222.79$1,731
Feb 2018060461.782.77$1,671
Jan 2018059162.874.01$2,370
Dec 2017065657.272.92$1,917
Nov 2017063355.423.12$1,974
Oct 2017066349.292.98$1,978
Sep 2017085247.523.09$2,630
Aug 2017042745.373.00$1,283
Jul 2017042243.873.09$1,303
Jun 2017169142.493.09$2,176
May 2017032745.373.26$1,067
Apr 2017043847.933.21$1,407
Mar 2017145846.772.98$1,413
Feb 2017158150.452.95$1,766
Jan 2017175149.413.42$2,617
Dec 2016173148.763.72$2,770
Nov 2016071842.492.64$1,899
Oct 2016079646.193.09$2,460
Sep 2016080341.553.10$2,490
Aug 2016095041.442.92$2,778
Jul 2016039941.622.92$1,167
Jun 2016036445.352.69$978
May 2016077742.521.99$1,547
Apr 2016079836.561.99$1,589
Mar 2016164033.011.79$1,181
Feb 2016072026.472.06$1,486
Jan 2016080627.352.36$1,906
Dec 2015182632.362.00$1,686
Nov 2015081938.792.17$1,775
Oct 2015182043.552.43$2,033
Sep 2015080942.992.76$2,232
Aug 2015183540.162.87$2,439
Jul 2015183548.152.95$2,507
Jun 2015081156.152.88$2,338
May 2015084555.212.96$2,497
Apr 2015083349.822.71$2,255
Mar 2015085442.892.93$2,506
Feb 2015078444.662.98$2,333
Jan 2015086143.433.10$2,670
Dec 2014087254.693.59$3,132
Nov 2014086070.464.25$3,657
Oct 2014090578.303.90$3,530
Sep 2014089586.164.05$3,621
Aug 2014094289.394.04$3,801
Jul 2014095796.564.18$4,000
Jun 2014089998.164.74$4,258
May 2014091794.734.73$4,334
Apr 2014093295.944.81$4,482
Mar 2014092995.895.06$4,698
Feb 2014085097.406.19$5,263
Jan 2014091590.404.86$4,448
Dec 2013092891.824.35$4,041
Nov 2013092888.853.74$3,469
Oct 2013096597.423.78$3,647
Sep 20130986104.113.72$3,666
Aug 201301,027104.253.52$3,618
Jul 20130922102.523.72$3,428
Jun 201301,00994.403.93$3,969
May 201301,05794.834.15$4,386
Apr 201301,04193.964.28$4,458
Mar 201301,09093.623.91$4,265
Feb 2013078891.233.42$2,695
Jan 201301,07791.603.42$3,683
Dec 201201,12386.773.42$3,841
Nov 201201,10886.953.62$4,016
Oct 201201,16289.383.40$3,950
Sep 201201,17194.672.92$3,417
Aug 201201,17092.662.91$3,403
Jul 201201,18785.133.02$3,586
Jun 201201,18679.822.52$2,988
May 201201,14591.612.49$2,849
Apr 201201,065101.652.00$2,127
Mar 201201,251105.052.22$2,780
Feb 201201,046101.102.57$2,688
Jan 201201,26298.092.73$3,450
Dec 201101,30596.873.24$4,228
Nov 201101,13195.723.31$3,745
Oct 201101,02484.983.65$3,736
Sep 201101,26083.623.99$5,022
Aug 201101,21983.404.15$5,058
Jul 201101,43994.144.52$6,500
Jun 2011084392.904.64$3,911
May 2011098698.134.40$4,343
Apr 201101,277105.964.33$5,534
Mar 201101,33196.364.06$5,400
Feb 201101,20585.644.18$5,037
Jan 201101,27986.504.59$5,869
Dec 201001,29785.734.35$5,639
Nov 201001,37080.843.80$5,200
Oct 201001,51878.103.51$5,327
Sep 201001,11672.633.98$4,441
Aug 201001,26273.684.42$5,577
Jul 2010098772.554.74$4,675
Jun 201001,11170.364.91$5,455
May 201001,26371.124.24$5,349
Apr 201001,21481.694.12$5,005
Mar 201001,36678.394.39$5,995
Feb 201001,27873.585.44$6,955
Jan 201001,53874.365.96$9,173
Dec 200901,40171.445.48$7,683
Nov 200901,40974.593.75$5,286
Oct 200901,68572.544.11$6,926
Sep 200901,64365.543.06$5,035
Aug 200901,69267.423.22$5,446
Jul 200901,74161.133.46$6,032
Jun 200901,51366.163.90$5,893
May 200901,83254.743.93$7,192
Apr 200901,57646.773.59$5,654
Mar 200901,66542.144.06$6,758
Feb 200901,45232.814.63$6,727
Jan 200901,94135.865.37$10,425
Dec 200801,97437.105.98$11,799
Nov 200801,96055.496.86$13,446
Oct 200802,01575.246.92$13,948
Sep 200801,991101.767.88$15,683
Aug 200802,062114.228.48$17,492
Jul 200802,109131.0811.39$24,020
Jun 200802,083131.3313.03$27,147
May 200802,191123.1711.57$25,359
Apr 200802,184110.3110.45$22,833
Mar 200802,312101.909.66$22,343
Feb 200802,20592.538.77$19,339
Jan 200802,42790.388.21$19,915
Dec 200702,44288.337.30$17,831
Nov 200702,43191.677.29$17,726
Oct 200702,59682.856.92$17,969
Sep 200702,51575.846.24$15,704
Aug 200702,58769.066.39$16,526
Jul 200702,68070.906.39$17,120
Jun 200702,57862.007.55$19,460
May 200702,67458.747.85$20,981
Apr 200702,65159.617.81$20,692
Mar 200702,79456.927.30$20,402
Feb 200702,68055.108.22$22,019
Jan 200703,03750.306.73$20,429
Dec 200603,06856.656.92$21,226
Nov 200602,78154.207.62$21,184
Oct 200603,00354.906.01$18,059
Sep 200602,92060.085.04$14,709
Aug 200603,07268.717.34$22,548
Jul 200603,12969.376.34$19,847
Jun 200603,11266.286.38$19,867
May 200603,30466.016.42$21,228
Apr 200603,24564.397.36$23,885
Mar 200603,52656.707.08$24,974
Feb 200603,24457.597.75$25,145
Jan 200603,74060.598.93$33,411
Dec 200503,82054.9413.42$51,247
Nov 200503,81454.6910.59$40,384
Oct 200504,06358.3413.80$56,052
Sep 200503,78661.4512.08$45,731
Aug 200503,88061.519.80$38,012
Jul 200503,94755.697.84$30,959
Jun 200503,97552.337.38$29,340
May 200504,25345.226.65$28,287
Apr 200504,39849.207.36$32,371
Mar 200504,50550.377.15$32,233
Feb 200504,21245.226.31$26,586
Jan 200504,94543.166.32$31,263
Dec 200406,06239.866.75$40,925
Nov 200405,28045.286.33$33,425
Oct 200405,80849.706.52$37,840
Sep 200406,37943.245.28$33,706
Aug 200405,63442.375.55$31,272

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  308 Mcf  × $  3.05 =       $938

────────────────────────────────────────────────────
Month total                                     $938

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/208573 is the state's own key, not one this site invented.