WILSON, DUKE 172

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 208598District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.8 M
Jul 2004 – May 2026
Value, last 12 filed months
$11 k
at the published price for each month
Months reported
263
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-11-18158663
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition79 bbl$3,563
GasProduction447,836 Mcf$2,823,700
Total$2,827,263

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4521, -100.7616. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.45209, -100.76159 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,800 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,800 ft.

Completions filed
Jul 2004
1 of 1 wells

1 well

42-43536856158,800 ftJul 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (263)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

263 months

May 20260269106.413.05$819
Apr 2026027498.932.87$786
Mar 2026029089.753.15$913
Feb 2026029663.503.75$1,110
Jan 2026035259.138.00$2,815
Dec 202503356.664.41$146
Nov 2025035758.593.93$1,402
Oct 2025043959.383.30$1,451
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 202507566.743.32$249
Jun 2025026066.483.13$813
May 2025027460.553.23$886
Apr 2025027162.363.54$960
Mar 2025028267.704.27$1,204
Feb 2025025470.884.34$1,103
Jan 2025028974.324.28$1,237
Dec 2024022468.993.12$699
Nov 2024016969.052.20$372
Oct 2024021871.372.28$497
Sep 2024022469.612.36$530
Aug 2024025175.632.06$518
Jul 2024020179.932.15$431
Jun 2024018778.082.63$493
May 2024018778.812.20$411
Apr 2024018184.451.66$300
Mar 2024014280.301.55$219
Feb 2024013176.091.78$234
Jan 2024015873.023.30$521
Dec 2023021571.262.61$561
Nov 2023021077.892.81$590
Oct 2023022185.443.09$682
Sep 2023021889.042.74$596
Aug 2023022680.522.67$604
Jul 2023023074.852.64$608
Jun 2023023068.962.26$519
May 2023023170.622.23$515
Apr 2023022978.122.24$512
Mar 2023024272.852.39$579
Feb 2023022575.112.47$555
Jan 2023023476.533.39$793
Dec 2022022276.415.73$1,272
Nov 2022020785.005.65$1,169
Oct 2022024187.185.86$1,413
Sep 2022024684.888.16$2,008
Aug 2022025794.529.13$2,346
Jul 20220263101.587.54$1,984
Jun 20220258115.097.98$2,058
May 20220270109.378.43$2,277
Apr 20220254104.226.84$1,737
Mar 20220244108.885.08$1,239
Feb 2022023391.054.86$1,132
Jan 2022026481.844.54$1,198
Dec 2021025671.323.90$998
Nov 2021025377.435.24$1,325
Oct 2021027779.795.71$1,583
Sep 2021027269.865.35$1,455
Aug 2021028466.024.22$1,199
Jul 2021028770.783.98$1,143
Jun 2021028069.493.38$947
May 2021027863.483.02$839
Apr 2021027160.362.76$748
Mar 2021031561.302.72$856
Feb 2021026857.805.55$1,487
Jan 2021031850.412.81$894
Dec 2020031544.642.68$843
Nov 2020029838.772.71$807
Oct 2020030536.972.48$756
Sep 2020024337.091.99$484
Aug 2020028939.982.39$689
Jul 2020032938.371.83$600
Jun 2020032534.901.69$549
May 2020034516.921.81$626
Apr 2020034014.751.80$613
Mar 2020035930.341.86$666
Feb 2020036549.881.98$723
Jan 2020139657.252.09$887
Dec 2019039459.012.30$908
Nov 2019040055.302.75$1,100
Oct 2019038453.472.42$929
Sep 2019138655.052.66$1,081
Aug 2019140953.112.30$996
Jul 2019034856.272.46$856
Jun 2019134352.782.49$907
May 2019141558.482.74$1,196
Apr 2019039962.632.75$1,098
Mar 2019141256.803.06$1,318
Feb 2019044950.852.79$1,254
Jan 2019110946.033.23$398
Dec 2018126646.594.19$1,160
Nov 2018024352.934.24$1,030
Oct 2018040661.443.40$1,380
Sep 2018039659.543.11$1,231
Aug 2018040259.403.07$1,233
Jul 2018057065.142.93$1,671
Jun 2018048760.183.08$1,498
May 2018057265.382.90$1,659
Apr 2018049063.842.90$1,421
Mar 2018050661.222.79$1,410
Feb 2018051861.782.77$1,433
Jan 2018045762.874.01$1,832
Dec 2017055557.272.92$1,621
Nov 2017052555.423.12$1,637
Oct 2017053749.292.98$1,602
Sep 2017056547.523.09$1,744
Aug 2017152145.373.00$1,611
Jul 2017053643.873.09$1,655
Jun 2017152542.493.09$1,663
May 2017051245.373.26$1,671
Apr 2017045347.933.21$1,455
Mar 2017151846.772.98$1,592
Feb 2017142450.452.95$1,302
Jan 2017042249.413.42$1,443
Dec 2016050348.763.72$1,873
Nov 2016045342.492.64$1,198
Oct 2016047346.193.09$1,462
Sep 2016040241.553.10$1,246
Aug 2016037141.442.92$1,085
Jul 2016033141.622.92$968
Jun 2016136145.352.69$1,015
May 2016054042.521.99$1,075
Apr 2016044436.561.99$884
Mar 2016138333.011.79$720
Feb 2016058126.472.06$1,199
Jan 2016063727.352.36$1,506
Dec 2015045932.362.00$919
Nov 2015061538.792.17$1,333
Oct 2015041743.552.43$1,012
Sep 2015140442.992.76$1,157
Aug 2015149640.162.87$1,465
Jul 2015186948.152.95$2,607
Jun 2015094856.152.88$2,733
May 2015090655.212.96$2,678
Apr 2015090049.822.71$2,436
Mar 2015085642.892.93$2,512
Feb 2015087944.662.98$2,616
Jan 2015082743.433.10$2,564
Dec 201401,14654.693.59$4,116
Nov 201401,07370.464.25$4,562
Oct 201401,00578.303.90$3,920
Sep 2014081186.164.05$3,281
Aug 2014098289.394.04$3,962
Jul 2014094496.564.18$3,946
Jun 201401,05398.164.74$4,988
May 2014078994.734.73$3,729
Apr 2014078795.944.81$3,785
Mar 201401,07195.895.06$5,416
Feb 2014085597.406.19$5,294
Jan 201401,06290.404.86$5,162
Dec 201301,06491.824.35$4,633
Nov 2013082888.853.74$3,095
Oct 201301,07897.423.78$4,074
Sep 20130962104.113.72$3,576
Aug 20130883104.253.52$3,110
Jul 201301,072102.523.72$3,985
Jun 2013081094.403.93$3,186
May 2013093394.834.15$3,871
Apr 201301,15893.964.28$4,959
Mar 201301,25793.623.91$4,918
Feb 201301,22091.233.42$4,172
Jan 201301,32891.603.42$4,542
Dec 201201,27386.773.42$4,354
Nov 201201,32786.953.62$4,810
Oct 201201,15889.383.40$3,937
Sep 201201,22394.672.92$3,569
Aug 201201,28092.662.91$3,722
Jul 201201,29385.133.02$3,906
Jun 201201,27379.822.52$3,207
May 201201,31491.612.49$3,270
Apr 201201,314101.652.00$2,624
Mar 201201,351105.052.22$3,002
Feb 201201,310101.102.57$3,367
Jan 201201,45798.092.73$3,984
Dec 201101,46796.873.24$4,753
Nov 201101,46795.723.31$4,858
Oct 201101,51984.983.65$5,542
Sep 201101,49983.623.99$5,975
Aug 201101,53983.404.15$6,386
Jul 201101,54894.144.52$6,993
Jun 201101,54592.904.64$7,169
May 201101,63198.134.40$7,184
Apr 201101,609105.964.33$6,972
Mar 201101,72696.364.06$7,003
Feb 201101,41285.644.18$5,902
Jan 201101,58786.504.59$7,282
Dec 201001,75485.734.35$7,626
Nov 201001,71080.843.80$6,490
Oct 201001,86578.103.51$6,544
Sep 201001,71372.633.98$6,817
Aug 201001,61973.684.42$7,155
Jul 201001,76872.554.74$8,374
Jun 201001,74670.364.91$8,574
May 2010078271.124.24$3,312
Apr 201001,51781.694.12$6,254
Mar 201001,55078.394.39$6,802
Feb 201001,43773.585.44$7,821
Jan 201001,86474.365.96$11,117
Dec 200902,01971.445.48$11,072
Nov 200901,99374.593.75$7,477
Oct 200902,09372.544.11$8,603
Sep 200902,05865.543.06$6,307
Aug 200902,08467.423.22$6,707
Jul 200902,13461.133.46$7,393
Jun 200902,12166.163.90$8,261
May 200902,26754.743.93$8,900
Apr 200902,24946.773.59$8,068
Mar 200902,42642.144.06$9,847
Feb 200902,33932.814.63$10,837
Jan 200902,67935.865.37$14,389
Dec 200802,69437.105.98$16,102
Nov 200802,60055.496.86$17,837
Oct 200802,70975.246.92$18,752
Sep 200802,784101.767.88$21,930
Aug 200802,996114.228.48$25,415
Jul 200803,089131.0811.39$35,182
Jun 200803,114131.3313.03$40,584
May 200803,305123.1711.57$38,253
Apr 200803,326110.3110.45$34,773
Mar 200803,390101.909.66$32,761
Feb 200803,24992.538.77$28,496
Jan 200803,59490.388.21$29,491
Dec 200703,59788.337.30$26,265
Nov 200703,62091.677.29$26,396
Oct 200703,87182.856.92$26,795
Sep 200703,92775.846.24$24,521
Aug 200704,23469.066.39$27,047
Jul 200704,34070.906.39$27,724
Jun 200704,82162.007.55$36,391
May 200705,18258.747.85$40,659
Apr 200705,19859.617.81$40,571
Mar 200705,48056.927.30$40,015
Feb 200705,02355.108.22$41,269
Jan 200704,93250.306.73$33,177
Dec 200604,28056.656.92$29,611
Nov 200604,25154.207.62$32,382
Oct 200604,61354.906.01$27,742
Sep 200604,47960.085.04$22,562
Aug 200604,74368.717.34$34,813
Jul 200605,02769.376.34$31,885
Jun 200605,32666.286.38$34,001
May 200605,64466.016.42$36,263
Apr 200605,82964.397.36$42,904
Mar 200605,23856.707.08$37,100
Feb 200604,95757.597.75$38,422
Jan 200605,67560.598.93$50,697
Dec 200505,86354.9413.42$78,654
Nov 200505,82354.6910.59$61,656
Oct 200506,32258.3413.80$87,217
Sep 200506,38761.4512.08$77,149
Aug 200507,01861.519.80$68,754
Jul 200507,30955.697.84$57,329
Jun 200507,44252.337.38$54,930
May 200507,64845.226.65$50,868
Apr 200537,93849.207.36$58,575
Mar 200558,29450.377.15$59,594
Feb 2005137,58845.226.31$48,483
Jan 200578,73943.166.32$55,552
Dec 20041310,58939.866.75$72,005
Nov 200458,95745.286.33$56,928
Oct 200439,65049.706.52$63,020
Sep 2004910,10243.245.28$53,767
Aug 2004410,12942.375.55$56,392
Jul 200407,68638.286.08$46,763

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  269 Mcf  × $  3.05 =       $819

────────────────────────────────────────────────────
Month total                                     $819

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/208598 is the state's own key, not one this site invented.