MUNSON 14-5

Operated by MUNSON, DAVID M. INC. (P-5 593201) in the LAVAN (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 209237District 7CField 52368480CondensateGasSaveExport
Value, all time
$855 k
May 2005 – May 2026
Value, last 12 filed months
$165
at the published price for each month
Months reported
253
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 66 leases and 76 wells, and the rule below applies to all of them.

Discovered
1992-07-06
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1995-08-01.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA ADDMINISTRATIVELY SUPENDED 11/1/95

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition543 bbl$36,334
GasProduction144,431 Mcf$819,065
Total$855,399

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.1340, -101.0918. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.13405, -101.09182 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,000 ft.

Completions filed
Oct 1996
1 of 1 wells

1 well

42-2353356514057,000 ftOct 1996

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (253)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

253 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 202501362.743.08$40
Aug 202501363.933.01$39
Jul 20250766.743.32$23
Jun 202502066.483.13$63
May 202501760.553.23$55
Apr 20250062.363.54$0
Mar 202501967.704.27$81
Feb 202501870.884.34$78
Jan 202501774.324.28$73
Dec 202401768.993.12$53
Nov 202401269.052.20$26
Oct 202401871.372.28$41
Sep 20240669.612.36$14
Aug 202402175.632.06$43
Jul 202402479.932.15$52
Jun 20240078.082.63$0
May 202401978.812.20$42
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 202105061.302.72$136
Feb 20210057.805.55$0
Jan 2021026550.412.81$745
Dec 2020045444.642.68$1,215
Nov 2020037038.772.71$1,001
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 2018023559.543.11$730
Aug 2018020059.403.07$613
Jul 201809265.142.93$270
Jun 2018039360.183.08$1,209
May 2018039965.382.90$1,157
Apr 201803163.842.90$90
Mar 20180061.222.79$0
Feb 2018033361.782.77$921
Jan 2018036062.874.01$1,443
Dec 2017038857.272.92$1,134
Nov 2017036555.423.12$1,138
Oct 2017037249.292.98$1,110
Sep 2017035847.523.09$1,105
Aug 2017022345.373.00$670
Jul 20170343.873.09$9
Jun 20170042.493.09$0
May 201706645.373.26$215
Apr 2017039747.933.21$1,275
Mar 2017051346.772.98$1,531
Feb 2017010650.452.95$313
Jan 2017014249.413.42$485
Dec 2016047048.763.72$1,750
Nov 2016044642.492.64$1,179
Oct 2016042846.193.09$1,323
Sep 2016044341.553.10$1,374
Aug 2016044341.442.92$1,295
Jul 2016031741.622.92$927
Jun 2016045545.352.69$1,222
May 2016063542.521.99$1,264
Apr 2016063136.561.99$1,256
Mar 2016060333.011.79$1,082
Feb 2016062326.472.06$1,286
Jan 2016068627.352.36$1,622
Dec 2015075132.362.00$1,503
Nov 2015070438.792.17$1,526
Oct 2015070743.552.43$1,716
Sep 2015070742.992.76$1,950
Aug 20150040.162.87$0
Jul 2015063148.152.95$1,858
Jun 2015060156.152.88$1,733
May 2015064055.212.96$1,891
Apr 2015065749.822.71$1,778
Mar 2015066142.892.93$1,940
Feb 2015057444.662.98$1,708
Jan 201517758343.433.10$9,495
Dec 2014070354.693.59$2,525
Nov 2014063270.464.25$2,687
Oct 2014062878.303.90$2,450
Sep 2014062186.164.05$2,512
Aug 2014068689.394.04$2,768
Jul 2014069896.564.18$2,917
Jun 2014066498.164.74$3,145
May 2014010894.734.73$510
Apr 2014065495.944.81$3,145
Mar 2014065595.895.06$3,312
Feb 2014060497.406.19$3,740
Jan 2014066490.404.86$3,228
Dec 2013067591.824.35$2,939
Nov 2013049388.853.74$1,843
Oct 2013065497.423.78$2,472
Sep 20130647104.113.72$2,405
Aug 20130758104.253.52$2,670
Jul 20130830102.523.72$3,086
Jun 2013073994.403.93$2,907
May 2013088294.834.15$3,659
Apr 2013079093.964.28$3,383
Mar 2013083793.623.91$3,275
Feb 2013076391.233.42$2,609
Jan 2013064091.603.42$2,189
Dec 2012038886.773.42$1,327
Nov 2012070486.953.62$2,552
Oct 2012073289.383.40$2,489
Sep 2012067394.672.92$1,964
Aug 2012061692.662.91$1,791
Jul 2012059385.133.02$1,791
Jun 2012034979.822.52$879
May 20120091.612.49$0
Apr 20120264101.652.00$527
Mar 20120954105.052.22$2,120
Feb 20120497101.102.57$1,277
Jan 2012057098.092.73$1,558
Dec 2011078796.873.24$2,550
Nov 2011068595.723.31$2,268
Oct 2011077884.983.65$2,839
Sep 2011081883.623.99$3,260
Aug 2011089183.404.15$3,697
Jul 2011090594.144.52$4,088
Jun 2011090692.904.64$4,204
May 2011091498.134.40$4,026
Apr 20110967105.964.33$4,190
Mar 201101,08196.364.06$4,386
Feb 201101,18385.644.18$4,945
Jan 2011090786.504.59$4,162
Dec 201001,16485.734.35$5,061
Nov 201001,14280.843.80$4,334
Oct 201001,20378.103.51$4,221
Sep 201001,17572.633.98$4,676
Aug 201001,20173.684.42$5,308
Jul 201001,26472.554.74$5,987
Jun 2010083770.364.91$4,110
May 201001,21771.124.24$5,154
Apr 201001,16881.694.12$4,815
Mar 201001,21478.394.39$5,328
Feb 201001,07973.585.44$5,872
Jan 201001,19674.365.96$7,133
Dec 200901,22671.445.48$6,723
Nov 20091771,18474.593.75$17,644
Oct 200901,24772.544.11$5,125
Sep 200901,24965.543.06$3,828
Aug 200901,30267.423.22$4,190
Jul 200901,29961.133.46$4,500
Jun 200901,23266.163.90$4,799
May 200901,30454.743.93$5,119
Apr 200901,28246.773.59$4,599
Mar 200901,31442.144.06$5,334
Feb 200901,19932.814.63$5,555
Jan 200901,44035.865.37$7,734
Dec 200801,29337.105.98$7,728
Nov 200801,29555.496.86$8,884
Oct 200801,36675.246.92$9,455
Sep 200801,080101.767.88$8,507
Aug 200801,373114.228.48$11,647
Jul 200801,349131.0811.39$15,364
Jun 200801,349131.3313.03$17,581
May 200801,398123.1711.57$16,181
Apr 200801,365110.3110.45$14,271
Mar 200801,371101.909.66$13,249
Feb 2008098092.538.77$8,595
Jan 2008084290.388.21$6,909
Dec 200701,01588.337.30$7,412
Nov 2007093891.677.29$6,840
Oct 20071791,29182.856.92$23,766
Sep 200701,28475.846.24$8,018
Aug 200701,52969.066.39$9,767
Jul 200701,53670.906.39$9,812
Jun 200701,43362.007.55$10,817
May 200701,45858.747.85$11,440
Apr 200701,46559.617.81$11,435
Mar 200701,50556.927.30$10,989
Feb 200701,32455.108.22$10,878
Jan 200701,64950.306.73$11,093
Dec 200601,61556.656.92$11,173
Nov 200601,55254.207.62$11,822
Oct 200601,62254.906.01$9,754
Sep 200601,57960.085.04$7,954
Aug 200601,51668.717.34$11,127
Jul 200601,54569.376.34$9,800
Jun 200601,45066.286.38$9,257
May 200601,54066.016.42$9,895
Apr 200601,42564.397.36$10,489
Mar 200601,44656.707.08$10,242
Feb 2006091957.597.75$7,123
Jan 200601,28960.598.93$11,515
Dec 200501,70054.9413.42$22,806
Nov 200501,57454.6910.59$16,666
Oct 200501,63558.3413.80$22,556
Sep 2005101,60961.4512.08$20,050
Aug 200501,71661.519.80$16,811
Jul 200501,67355.697.84$13,122
Jun 200501,69952.337.38$12,540
May 200501,76245.226.65$11,719

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 62.74 =         $0
Gas                   13 Mcf  × $  3.08 =        $40

────────────────────────────────────────────────────
Month total                                      $40

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/209237 is the state's own key, not one this site invented.