MAYER 37-2

Operated by THP OPERATING LLC (P-5 857147) in the LAVAN (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 209251District 7CField 52368480CondensateGasSaveExport
Value, all time
$441 k
May 2005 – Nov 2024
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
235
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 66 leases and 76 wells, and the rule below applies to all of them.

Discovered
1992-07-06
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1995-08-01.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA ADDMINISTRATIVELY SUPENDED 11/1/95

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition388 bbl$29,969
GasProduction67,307 Mcf$411,122
Total$441,091

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.1460, -101.1552. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.14600, -101.15515 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,755 ft
1 wells filed one
Completion to plug
27.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,755 ft.

Completions filed
Jun 1997
1 of 1 wells
Plug dates filed
Sep 2024
1 of 1 wells

Last completion to plug: a median of 27.3 years across the 1 well that filed both dates, with the middle half between 27.3 years and 27.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2353365437027,755 ftJun 1997Sep 2024Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (235)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

235 months

Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 202430075.632.06$2,269
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190250.852.79$6
Jan 20190446.033.23$13
Dec 20180046.594.19$0
Nov 20180252.934.24$8
Oct 20180261.443.40$7
Sep 20180259.543.11$6
Aug 20180659.403.07$18
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180165.382.90$3
Apr 20180363.842.90$9
Mar 20180061.222.79$0
Feb 20180261.782.77$6
Jan 20180362.874.01$12
Dec 20170057.272.92$0
Nov 20170255.423.12$6
Oct 20170249.292.98$6
Sep 20170047.523.09$0
Aug 20170245.373.00$6
Jul 20170343.873.09$9
Jun 20170142.493.09$3
May 20170345.373.26$10
Apr 20170047.933.21$0
Mar 20170346.772.98$9
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160148.763.72$4
Nov 20160242.492.64$5
Oct 20160246.193.09$6
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160241.622.92$6
Jun 20160245.352.69$5
May 20160242.521.99$4
Apr 20160336.561.99$6
Mar 20160233.011.79$4
Feb 20160526.472.06$10
Jan 20160727.352.36$17
Dec 20150032.362.00$0
Nov 20150338.792.17$7
Oct 20150643.552.43$15
Sep 20150042.992.76$0
Aug 201501040.162.87$29
Jul 20150048.152.95$0
Jun 20150456.152.88$12
May 20150455.212.96$12
Apr 20150749.822.71$19
Mar 20150342.892.93$9
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140154.693.59$4
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 2014028686.164.05$1,157
Aug 2014031089.394.04$1,251
Jul 2014027396.564.18$1,141
Jun 2014027798.164.74$1,312
May 2014032894.734.73$1,550
Apr 2014029995.944.81$1,438
Mar 2014040595.895.06$2,048
Feb 2014015697.406.19$966
Jan 201401590.404.86$73
Dec 20130191.824.35$4
Nov 2013031588.853.74$1,178
Oct 201305197.423.78$193
Sep 2013028104.113.72$104
Aug 20130322104.253.52$1,134
Jul 20130492102.523.72$1,829
Jun 20137951594.403.93$9,483
May 2013053394.834.15$2,211
Apr 2013052293.964.28$2,236
Mar 2013047193.623.91$1,843
Feb 2013049091.233.42$1,676
Jan 2013054091.603.42$1,847
Dec 2012054086.773.42$1,847
Nov 2012052886.953.62$1,914
Oct 2012055389.383.40$1,880
Sep 2012054194.672.92$1,579
Aug 2012054192.662.91$1,573
Jul 2012055785.133.02$1,683
Jun 2012053579.822.52$1,348
May 2012057091.612.49$1,418
Apr 20120553101.652.00$1,104
Mar 20120564105.052.22$1,253
Feb 20120542101.102.57$1,393
Jan 2012017298.092.73$470
Dec 2011058796.873.24$1,902
Nov 2011058595.723.31$1,937
Oct 2011053684.983.65$1,956
Sep 2011054183.623.99$2,156
Aug 2011066483.404.15$2,755
Jul 2011082394.144.52$3,718
Jun 2011055692.904.64$2,580
May 20117957698.134.40$10,289
Apr 20110559105.964.33$2,422
Mar 2011058796.364.06$2,382
Feb 2011053185.644.18$2,220
Jan 2011055986.504.59$2,565
Dec 2010059385.734.35$2,578
Nov 2010056980.843.80$2,160
Oct 2010059878.103.51$2,098
Sep 2010058872.633.98$2,340
Aug 2010060673.684.42$2,678
Jul 2010058772.554.74$2,780
Jun 2010057870.364.91$2,838
May 20103959671.124.24$5,298
Apr 2010058381.694.12$2,404
Mar 2010060578.394.39$2,655
Feb 2010052673.585.44$2,863
Jan 2010060574.365.96$3,608
Dec 2009060771.445.48$3,329
Nov 2009059474.593.75$2,228
Oct 2009059872.544.11$2,458
Sep 2009057465.543.06$1,759
Aug 2009063367.423.22$2,037
Jul 2009064261.133.46$2,224
Jun 2009060066.163.90$2,337
May 2009054854.743.93$2,151
Apr 2009036346.773.59$1,302
Mar 20097445242.144.06$4,953
Feb 2009028132.814.63$1,302
Jan 2009030235.865.37$1,622
Dec 2008028937.105.98$1,727
Nov 2008030055.496.86$2,058
Oct 2008048375.246.92$3,343
Sep 20080705101.767.88$5,553
Aug 20080702114.228.48$5,955
Jul 20080700131.0811.39$7,973
Jun 20080700131.3313.03$9,123
May 20080731123.1711.57$8,461
Apr 20080712110.3110.45$7,444
Mar 20080569101.909.66$5,499
Feb 2008061892.538.77$5,420
Jan 2008072990.388.21$5,982
Dec 2007077888.337.30$5,681
Nov 2007076691.677.29$5,585
Oct 2007080682.856.92$5,579
Sep 20078779475.846.24$11,556
Aug 2007081769.066.39$5,219
Jul 2007082070.906.39$5,238
Jun 2007080262.007.55$6,054
May 2007082958.747.85$6,505
Apr 2007080459.617.81$6,275
Mar 2007084056.927.30$6,134
Feb 2007079355.108.22$6,515
Jan 2007081650.306.73$5,489
Dec 2006069756.656.92$4,822
Nov 2006062954.207.62$4,791
Oct 2006068054.906.01$4,089
Sep 2006057060.085.04$2,871
Aug 2006076668.717.34$5,622
Jul 2006088969.376.34$5,639
Jun 2006087666.286.38$5,592
May 2006089166.016.42$5,725
Apr 2006084664.397.36$6,227
Mar 2006090256.707.08$6,389
Feb 2006080357.597.75$6,224
Jan 2006087660.598.93$7,826
Dec 2005086754.9413.42$11,631
Nov 2005082054.6910.59$8,682
Oct 2005090858.3413.80$12,527
Sep 2005097161.4512.08$11,729
Aug 200501,00361.519.80$9,826
Jul 200501,04555.697.84$8,197
Jun 200501,03252.337.38$7,617
May 200501,06745.226.65$7,097

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2024 — as filed, then multipliedworked
Condensate            30 bbl  × $ 75.63 =     $2,269
Gas                    0 Mcf  × $  2.06 =         $0

────────────────────────────────────────────────────
Month total                                   $2,269

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/209251 is the state's own key, not one this site invented.