BAILEY

Operated by ZARVONA ENERGY LLC (P-5 950523) in the OZONA, NE. (CANYON 7520) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 209570District 7CField 679985002 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.2 M
Feb 2005 – May 2026
Value, last 12 filed months
$24 k
at the published price for each month
Months reported
256
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 592 leases and 641 wells, and the rule below applies to all of them.

Discovered
1966-01-17
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2013-10-22.

The Commission's schedule remark for this field reads: PER DOCKET 01-0299858, THIS FIELD HAS BEEN DESIGNATED AS A UFT

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-08-02161740
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,337 bbl$277,498
GasProduction467,898 Mcf$2,951,830
Total$3,229,328

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.7918, -101.0123. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.79182, -101.01226 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,086 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,086 ft.

Completions filed
Feb 2005
1 of 1 wells

1 well

42-105394483128,086 ftFeb 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (256)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

256 months

May 2026012106.413.05$37
Apr 202601898.932.87$52
Mar 202604489.753.15$139
Feb 2026048663.503.75$1,823
Jan 2026055659.138.00$4,447
Dec 2025060656.664.41$2,675
Nov 2025060658.593.93$2,379
Oct 20255859559.383.30$5,410
Sep 2025059562.743.08$1,831
Aug 2025059663.933.01$1,797
Jul 2025055966.743.32$1,853
Jun 2025052566.483.13$1,643
May 2025056460.553.23$1,823
Apr 2025050962.363.54$1,803
Mar 2025053467.704.27$2,279
Feb 2025038570.884.34$1,671
Jan 2025052274.324.28$2,233
Dec 2024052268.993.12$1,629
Nov 2024051369.052.20$1,128
Oct 2024054371.372.28$1,239
Sep 2024048569.612.36$1,147
Aug 2024051175.632.06$1,055
Jul 2024049879.932.15$1,069
Jun 2024045178.082.63$1,188
May 2024049678.812.20$1,090
Apr 2024044284.451.66$733
Mar 2024049480.301.55$763
Feb 2024046376.091.78$826
Jan 2024046973.023.30$1,547
Dec 2023050971.262.61$1,329
Nov 2023049377.892.81$1,384
Oct 2023049185.443.09$1,516
Sep 2023047689.042.74$1,302
Aug 2023043080.522.67$1,149
Jul 2023048074.852.64$1,268
Jun 2023048368.962.26$1,091
May 2023041670.622.23$927
Apr 2023045178.122.24$1,009
Mar 2023044572.852.39$1,065
Feb 2023045375.112.47$1,117
Jan 2023049476.533.39$1,674
Dec 2022053076.415.73$3,036
Nov 2022054785.005.65$3,088
Oct 2022057387.185.86$3,360
Sep 2022053484.888.16$4,359
Aug 2022052394.529.13$4,774
Jul 20220523101.587.54$3,945
Jun 20220447115.097.98$3,566
May 20220536109.378.43$4,520
Apr 20220486104.226.84$3,323
Mar 20220514108.885.08$2,609
Feb 20227947891.054.86$9,515
Jan 2022051481.844.54$2,332
Dec 2021049471.323.90$1,926
Nov 2021048577.435.24$2,540
Oct 2021052179.795.71$2,977
Sep 2021055869.865.35$2,986
Aug 2021061066.024.22$2,575
Jul 2021060770.783.98$2,417
Jun 2021059769.493.38$2,018
May 2021058763.483.02$1,771
Apr 2021056260.362.76$1,550
Mar 2021059861.302.72$1,625
Feb 2021051157.805.55$2,835
Jan 2021055450.412.81$1,557
Dec 2020057144.642.68$1,528
Nov 2020054638.772.71$1,478
Oct 2020057336.972.48$1,420
Sep 2020059937.091.99$1,193
Aug 2020058939.982.39$1,405
Jul 2020060938.371.83$1,112
Jun 2020057834.901.69$977
May 2020063816.921.81$1,158
Apr 2020062414.751.80$1,126
Mar 2020066030.341.86$1,225
Feb 2020066849.881.98$1,323
Jan 2020073957.252.09$1,548
Dec 2019062359.012.30$1,436
Nov 2019057455.302.75$1,579
Oct 2019061053.472.42$1,475
Sep 2019063255.052.66$1,679
Aug 2019064453.112.30$1,484
Jul 2019059256.272.46$1,456
Jun 2019057252.782.49$1,425
May 2019055158.482.74$1,510
Apr 2019055562.632.75$1,527
Mar 2019058656.803.06$1,794
Feb 2019058250.852.79$1,625
Jan 2019059746.033.23$1,927
Dec 2018062446.594.19$2,612
Nov 2018052852.934.24$2,237
Oct 2018061261.443.40$2,080
Sep 2018058159.543.11$1,806
Aug 2018066659.403.07$2,042
Jul 2018066065.142.93$1,935
Jun 2018065860.183.08$2,025
May 2018067865.382.90$1,967
Apr 2018064563.842.90$1,871
Mar 2018066661.222.79$1,856
Feb 2018056461.782.77$1,560
Jan 2018060262.874.01$2,414
Dec 2017061557.272.92$1,797
Nov 2017063155.423.12$1,968
Oct 2017063249.292.98$1,886
Sep 2017063247.523.09$1,951
Aug 2017071545.373.00$2,148
Jul 2017069043.873.09$2,130
Jun 2017061142.493.09$1,886
May 2017064145.373.26$2,092
Apr 2017058447.933.21$1,876
Mar 2017060546.772.98$1,805
Feb 2017054350.452.95$1,603
Jan 2017060349.413.42$2,062
Dec 2016060148.763.72$2,237
Nov 2016061442.492.64$1,624
Oct 2016069946.193.09$2,160
Sep 2016065641.553.10$2,034
Aug 2016063341.442.92$1,851
Jul 2016062641.622.92$1,831
Jun 2016059145.352.69$1,587
May 2016059242.521.99$1,179
Apr 2016059736.561.99$1,189
Mar 2016060633.011.79$1,087
Feb 2016057926.472.06$1,195
Jan 2016063327.352.36$1,497
Dec 2015067332.362.00$1,347
Nov 2015063838.792.17$1,383
Oct 2015067643.552.43$1,640
Sep 2015064142.992.76$1,768
Aug 2015066740.162.87$1,916
Jul 2015071748.152.95$2,112
Jun 2015079856.152.88$2,301
May 2015064555.212.96$1,906
Apr 2015074349.822.71$2,011
Mar 2015077542.892.93$2,274
Feb 2015074044.662.98$2,202
Jan 2015085443.433.10$2,648
Dec 201401,02854.693.59$3,692
Nov 201401,09970.464.25$4,673
Oct 201401,02678.303.90$4,002
Sep 2014096486.164.05$3,900
Aug 201401,02089.394.04$4,116
Jul 201401,03896.564.18$4,338
Jun 201401,06998.164.74$5,064
May 201401,08994.734.73$5,147
Apr 201401,04595.944.81$5,026
Mar 2014098695.895.06$4,986
Feb 2014089897.406.19$5,560
Jan 20144998890.404.86$9,232
Dec 2013098991.824.35$4,307
Nov 2013098988.853.74$3,697
Oct 201301,07697.423.78$4,067
Sep 201301,106104.113.72$4,112
Aug 201301,206104.253.52$4,248
Jul 201301,029102.523.72$3,826
Jun 2013089694.403.93$3,524
May 201301,14494.834.15$4,747
Apr 201301,50093.964.28$6,424
Mar 2013092093.623.91$3,600
Feb 20131011,27191.233.42$13,561
Jan 201301,51291.603.42$5,171
Dec 201201,48386.773.42$5,072
Nov 2012099186.953.62$3,592
Oct 201201,00189.383.40$3,403
Sep 201201,07794.672.92$3,143
Aug 201251,11192.662.91$3,694
Jul 201201,28985.133.02$3,894
Jun 201201,41779.822.52$3,569
May 201201,49791.612.49$3,725
Apr 201201,483101.652.00$2,961
Mar 201201,530105.052.22$3,400
Feb 201201,434101.102.57$3,686
Jan 201201,56598.092.73$4,279
Dec 20111141,56996.873.24$16,126
Nov 201101,54095.723.31$5,099
Oct 201101,27984.983.65$4,666
Sep 201101,59783.623.99$6,365
Aug 201101,65583.404.15$6,867
Jul 201101,63594.144.52$7,386
Jun 201101,68892.904.64$7,832
May 201101,89098.134.40$8,325
Apr 201101,718105.964.33$7,445
Mar 2011341,91996.364.06$11,062
Feb 201101,57385.644.18$6,575
Jan 201101,76686.504.59$8,104
Dec 2010521,65485.734.35$11,649
Nov 201001,62780.843.80$6,175
Oct 201001,71478.103.51$6,014
Sep 2010861,74572.633.98$13,190
Aug 201001,84073.684.42$8,132
Jul 201001,77272.554.74$8,393
Jun 201001,91670.364.91$9,408
May 201001,47471.124.24$6,243
Apr 201001,56581.694.12$6,452
Mar 201001,95278.394.39$8,567
Feb 2010451,76073.585.44$12,890
Jan 201002,03274.365.96$12,119
Dec 2009162,17271.445.48$13,054
Nov 2009572,11274.593.75$12,175
Oct 2009332,15572.544.11$11,251
Sep 200902,15165.543.06$6,592
Aug 200902,28267.423.22$7,345
Jul 200902,20561.133.46$7,639
Jun 20091702,20266.163.90$19,824
May 200902,16454.743.93$8,495
Apr 200902,28746.773.59$8,205
Mar 200902,32842.144.06$9,449
Feb 200902,17732.814.63$10,086
Jan 200902,41235.865.37$12,955
Dec 200802,03237.105.98$12,146
Nov 200802,30455.496.86$15,806
Oct 200803,03575.246.92$21,008
Sep 200801,092101.767.88$8,602
Aug 20081742,483114.228.48$40,938
Jul 200802,904131.0811.39$33,075
Jun 200802,913131.3313.03$37,964
May 200803,084123.1711.57$35,695
Apr 200802,960110.3110.45$30,946
Mar 200803,196101.909.66$30,886
Feb 200802,97192.538.77$26,057
Jan 20081743,23390.388.21$42,255
Dec 200703,63888.337.30$26,565
Nov 200703,48891.677.29$25,433
Oct 200703,90582.856.92$27,030
Sep 20071743,77675.846.24$36,774
Aug 200703,99869.066.39$25,539
Jul 200703,92870.906.39$25,092
Jun 200703,76862.007.55$28,443
May 200704,10658.747.85$32,217
Apr 20071754,11959.617.81$42,581
Mar 200704,60956.927.30$33,655
Feb 200703,93555.108.22$32,330
Jan 200704,41850.306.73$29,719
Dec 20061744,77856.656.92$42,913
Nov 200604,89954.207.62$37,318
Oct 200605,43954.906.01$32,709
Sep 20061695,28060.085.04$36,750
Aug 200605,81268.717.34$42,660
Jul 200604,96669.376.34$31,498
Jun 200605,16066.286.38$32,941
May 20061806,27066.016.42$52,167
Apr 200605,67064.397.36$41,734
Mar 200606,06056.707.08$42,923
Feb 20061716,08557.597.75$57,013
Jan 200607,32860.598.93$65,463
Dec 20051636,96854.9413.42$102,434
Nov 200507,16754.6910.59$75,887
Oct 20051798,68758.3413.80$130,287
Sep 200508,64961.4512.08$104,471
Aug 200517210,22861.519.80$110,782
Jul 2005012,18255.697.84$95,551
Jun 200517414,72752.337.38$117,806
May 200536517,79045.226.65$134,829
Apr 200532619,48449.207.36$159,451
Mar 200550117,57450.377.15$150,975
Feb 20051679,90645.226.31$70,078

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   12 Mcf  × $  3.05 =        $37

────────────────────────────────────────────────────
Month total                                      $37

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/209570 is the state's own key, not one this site invented.