SCHEUBER "B"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the DAVIDSON RANCH (PENN. 7890) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 209601District 7CField 233657502 tax incentive programmesCondensateGasSaveExport
Value, all time
$701 k
Apr 2005 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
254
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 670 leases and 670 wells, and the rule below applies to all of them.

Discovered
1964-12-21
as the register files it
Field class
Gas
the register's own label
Between wells
660 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2004-05-25.

The Commission's schedule remark for this field reads: AMENDED TO 20 ACRES WITH A 2100 FOOT DIAGONAL.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-10-26165902
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1 bbl$106
GasProduction116,900 Mcf$700,788
Total$700,895

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6200, -101.1053. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.62000, -101.10532 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,300 ft.

Completions filed
Apr 2005
1 of 1 wells

1 well

42-10539481138,300 ftApr 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (254)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

254 months

May 20261150106.413.05$563
Apr 2026018398.932.87$525
Mar 20260089.753.15$0
Feb 2026011663.503.75$435
Jan 2026013259.138.00$1,056
Dec 2025013456.664.41$591
Nov 2025013758.593.93$538
Oct 2025010959.383.30$360
Sep 2025013462.743.08$412
Aug 2025013463.933.01$404
Jul 2025012166.743.32$401
Jun 2025012766.483.13$397
May 2025013260.553.23$427
Apr 2025012362.363.54$436
Mar 20250367.704.27$13
Feb 2025011970.884.34$517
Jan 2025012774.324.28$543
Dec 2024013168.993.12$409
Nov 2024012669.052.20$277
Oct 2024013271.372.28$301
Sep 2024012369.612.36$291
Aug 2024013275.632.06$272
Jul 2024012779.932.15$273
Jun 202408478.082.63$221
May 2024014778.812.20$323
Apr 2024012884.451.66$212
Mar 2024013580.301.55$209
Feb 2024012676.091.78$225
Jan 2024013373.023.30$439
Dec 2023013571.262.61$352
Nov 2023012877.892.81$359
Oct 2023013585.443.09$417
Sep 2023013089.042.74$356
Aug 2023013680.522.67$364
Jul 2023013774.852.64$362
Jun 2023013368.962.26$300
May 2023013870.622.23$307
Apr 2023013578.122.24$302
Mar 2023013572.852.39$323
Feb 2023012475.112.47$306
Jan 2023013376.533.39$451
Dec 2022013076.415.73$745
Nov 2022013185.005.65$740
Oct 2022013687.185.86$797
Sep 2022013684.888.16$1,110
Aug 2022012794.529.13$1,159
Jul 20220133101.587.54$1,003
Jun 20220137115.097.98$1,093
May 20220137109.378.43$1,155
Apr 20220136104.226.84$930
Mar 20220138108.885.08$701
Feb 2022012091.054.86$583
Jan 2022014881.844.54$672
Dec 2021015071.323.90$585
Nov 2021014477.435.24$754
Oct 2021015179.795.71$863
Sep 2021014869.865.35$792
Aug 2021014666.024.22$616
Jul 2021015670.783.98$621
Jun 2021014669.493.38$494
May 2021015563.483.02$468
Apr 2021015160.362.76$417
Mar 2021017461.302.72$473
Feb 2021012857.805.55$710
Jan 2021015650.412.81$438
Dec 2020015944.642.68$425
Nov 2020015438.772.71$417
Oct 2020016136.972.48$399
Sep 2020077637.091.99$1,545
Aug 2020015739.982.39$374
Jul 2020015438.371.83$281
Jun 2020015834.901.69$267
May 2020016116.921.81$292
Apr 2020015514.751.80$280
Mar 2020016430.341.86$304
Feb 2020014849.881.98$293
Jan 2020016057.252.09$335
Dec 2019015959.012.30$366
Nov 2019015555.302.75$426
Oct 2019016253.472.42$392
Sep 2019015955.052.66$423
Aug 2019016453.112.30$378
Jul 2019016756.272.46$411
Jun 2019016252.782.49$404
May 2019017058.482.74$466
Apr 2019014462.632.75$396
Mar 2019016556.803.06$505
Feb 2019014850.852.79$413
Jan 2019016746.033.23$539
Dec 2018017846.594.19$745
Nov 2018015852.934.24$669
Oct 2018034361.443.40$1,166
Sep 2018017359.543.11$538
Aug 2018018259.403.07$558
Jul 2018018365.142.93$537
Jun 2018018260.183.08$560
May 2018018865.382.90$545
Apr 2018018263.842.90$528
Mar 2018019261.222.79$535
Feb 2018017161.782.77$473
Jan 2018018162.874.01$726
Dec 2017018857.272.92$549
Nov 2017018555.423.12$577
Oct 2017019149.292.98$570
Sep 2017018747.523.09$577
Aug 201709745.373.00$291
Jul 2017020043.873.09$617
Jun 2017019142.493.09$590
May 2017020245.373.26$659
Apr 2017019247.933.21$617
Mar 2017020246.772.98$603
Feb 2017018450.452.95$543
Jan 2017020249.413.42$691
Dec 2016020548.763.72$763
Nov 2016020242.492.64$534
Oct 2016022046.193.09$680
Sep 2016021541.553.10$667
Aug 2016022241.442.92$649
Jul 2016021741.622.92$635
Jun 2016021745.352.69$583
May 2016022842.521.99$454
Apr 2016022636.561.99$450
Mar 2016022933.011.79$411
Feb 2016021926.472.06$452
Jan 2016023527.352.36$556
Dec 2015023732.362.00$474
Nov 2015053038.792.17$1,149
Oct 2015025243.552.43$612
Sep 2015024942.992.76$687
Aug 2015025440.162.87$730
Jul 2015026148.152.95$769
Jun 2015024956.152.88$718
May 2015025155.212.96$742
Apr 2015024449.822.71$660
Mar 2015025242.892.93$740
Feb 2015022444.662.98$667
Jan 2015024743.433.10$766
Dec 2014025454.693.59$912
Nov 2014024670.464.25$1,046
Oct 2014026278.303.90$1,022
Sep 2014025086.164.05$1,011
Aug 2014026689.394.04$1,073
Jul 2014026796.564.18$1,116
Jun 2014025798.164.74$1,217
May 2014027394.734.73$1,290
Apr 2014027195.944.81$1,303
Mar 2014023095.895.06$1,163
Feb 2014027297.406.19$1,684
Jan 2014031890.404.86$1,546
Dec 2013035991.824.35$1,563
Nov 2013032188.853.74$1,200
Oct 2013025797.423.78$971
Sep 20130302104.113.72$1,123
Aug 20130304104.253.52$1,071
Jul 20130311102.523.72$1,156
Jun 2013030694.403.93$1,204
May 2013029394.834.15$1,216
Apr 2013034693.964.28$1,482
Mar 2013030093.623.91$1,174
Feb 2013031091.233.42$1,060
Jan 2013033891.603.42$1,156
Dec 2012033886.773.42$1,156
Nov 2012033086.953.62$1,196
Oct 2012036289.383.40$1,231
Sep 2012035394.672.92$1,030
Aug 2012037592.662.91$1,091
Jul 2012037185.133.02$1,121
Jun 2012037679.822.52$947
May 2012039491.612.49$980
Apr 20120388101.652.00$775
Mar 20120393105.052.22$873
Feb 20120369101.102.57$948
Jan 2012040098.092.73$1,094
Dec 2011040196.873.24$1,299
Nov 2011040895.723.31$1,351
Oct 2011043684.983.65$1,591
Sep 2011043383.623.99$1,726
Aug 2011047583.404.15$1,971
Jul 2011042694.144.52$1,924
Jun 2011039692.904.64$1,837
May 2011055398.134.40$2,436
Apr 20110307105.964.33$1,330
Mar 2011046096.364.06$1,866
Feb 2011038285.644.18$1,597
Jan 2011051086.504.59$2,340
Dec 2010052585.734.35$2,283
Nov 2010053080.843.80$2,012
Oct 2010056678.103.51$1,986
Sep 2010055972.633.98$2,225
Aug 2010061573.684.42$2,718
Jul 2010065772.554.74$3,112
Jun 2010065270.364.91$3,202
May 2010070571.124.24$2,986
Apr 2010063581.694.12$2,618
Mar 2010072078.394.39$3,160
Feb 2010068173.585.44$3,706
Jan 2010072774.365.96$4,336
Dec 2009062971.445.48$3,449
Nov 2009072874.593.75$2,731
Oct 2009077472.544.11$3,181
Sep 2009075565.543.06$2,314
Aug 2009077167.423.22$2,481
Jul 2009081761.133.46$2,831
Jun 2009080966.163.90$3,151
May 2009087254.743.93$3,423
Apr 2009080146.773.59$2,874
Mar 2009089942.144.06$3,649
Feb 2009080032.814.63$3,706
Jan 2009088635.865.37$4,759
Dec 2008090437.105.98$5,403
Nov 2008088855.496.86$6,092
Oct 2008094275.246.92$6,521
Sep 20080604101.767.88$4,758
Aug 20080917114.228.48$7,779
Jul 20080858131.0811.39$9,772
Jun 20080779131.3313.03$10,152
May 20080719123.1711.57$8,322
Apr 20080658110.3110.45$6,879
Mar 20080706101.909.66$6,823
Feb 2008069392.538.77$6,078
Jan 2008074590.388.21$6,113
Dec 2007077288.337.30$5,637
Nov 2007073691.677.29$5,367
Oct 2007083282.856.92$5,759
Sep 2007071475.846.24$4,458
Aug 2007081769.066.39$5,219
Jul 2007081870.906.39$5,225
Jun 2007080862.007.55$6,099
May 200701,04358.747.85$8,184
Apr 200701,05859.617.81$8,258
Mar 200701,07256.927.30$7,828
Feb 2007098155.108.22$8,060
Jan 200701,14950.306.73$7,729
Dec 200601,20656.656.92$8,344
Nov 200601,18054.207.62$8,989
Oct 200601,25454.906.01$7,541
Sep 200601,24360.085.04$6,261
Aug 200601,24168.717.34$9,109
Jul 200601,34969.376.34$8,556
Jun 200601,36766.286.38$8,727
May 200601,21266.016.42$7,787
Apr 200601,33764.397.36$9,841
Mar 200601,19556.707.08$8,464
Feb 200601,20357.597.75$9,325
Jan 200601,56360.598.93$13,963
Dec 200501,83054.9413.42$24,550
Nov 200501,74054.6910.59$18,424
Oct 200502,15458.3413.80$29,716
Sep 200501,58561.4512.08$19,145
Aug 200502,76361.519.80$27,069
Jul 200502,92455.697.84$22,935
Jun 200503,20152.337.38$23,627
May 200503,65345.226.65$24,297
Apr 200504,45949.207.36$32,820

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             1 bbl  × $106.41 =       $106
Gas                  150 Mcf  × $  3.05 =       $457

────────────────────────────────────────────────────
Month total                                     $563

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/209601 is the state's own key, not one this site invented.