GENINI

Operated by ROBERT C. BROWER, LLC (P-5 100445) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 210131District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.1 M
Mar 2005 – May 2026
Value, last 12 filed months
$318
at the published price for each month
Months reported
255
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-09-20165528
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition969 bbl$63,492
GasProduction174,438 Mcf$1,057,204
Total$1,120,696

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4083, -100.6983. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.40833, -100.69829 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,000 ft.

Completions filed
Mar 2005
1 of 1 wells

1 well

42-4353725737117,000 ftMar 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (255)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

255 months

May 202600106.413.05$0
Apr 20260298.932.87$6
Mar 20260089.753.15$0
Feb 20260663.503.75$23
Jan 20260859.138.00$64
Dec 20250856.664.41$35
Nov 20250958.593.93$35
Oct 202501059.383.30$33
Sep 20250962.743.08$28
Aug 202501163.933.01$33
Jul 202501066.743.32$33
Jun 20250966.483.13$28
May 20250560.553.23$16
Apr 202501162.363.54$39
Mar 202501167.704.27$47
Feb 202501370.884.34$56
Jan 202501074.324.28$43
Dec 20240268.993.12$6
Nov 20240269.052.20$4
Oct 20240471.372.28$9
Sep 20240769.612.36$17
Aug 20240775.632.06$14
Jul 202401079.932.15$21
Jun 202401078.082.63$26
May 20240778.812.20$15
Apr 20240884.451.66$13
Mar 202401980.301.55$29
Feb 202401876.091.78$32
Jan 202401173.023.30$36
Dec 202301171.262.61$29
Nov 202301877.892.81$51
Oct 20230085.443.09$0
Sep 202302289.042.74$60
Aug 202302680.522.67$69
Jul 20230074.852.64$0
Jun 202305068.962.26$113
May 202304570.622.23$100
Apr 202305478.122.24$121
Mar 202304572.852.39$108
Feb 2023010175.112.47$249
Jan 2023024476.533.39$827
Dec 202209076.415.73$516
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 2022011104.226.84$75
Mar 202207108.885.08$36
Feb 202207491.054.86$360
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 202102977.435.24$152
Oct 202101579.795.71$86
Sep 20210269.865.35$11
Aug 202101266.024.22$51
Jul 20210170.783.98$4
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 202002914.751.80$52
Mar 202003730.341.86$69
Feb 20200249.881.98$4
Jan 20200457.252.09$8
Dec 201904459.012.30$101
Nov 201948055.302.75$441
Oct 2019614153.472.42$662
Sep 2019028355.052.66$752
Aug 2019029553.112.30$680
Jul 201957756.272.46$471
Jun 2019031452.782.49$782
May 2019529958.482.74$1,112
Apr 2019034562.632.75$949
Mar 2019535256.803.06$1,362
Feb 2019532650.852.79$1,165
Jan 2019533146.033.23$1,299
Dec 2018529946.594.19$1,484
Nov 2018529252.934.24$1,502
Oct 2018035961.443.40$1,220
Sep 2018529059.543.11$1,199
Aug 2018032359.403.07$991
Jul 2018035565.142.93$1,041
Jun 2018527460.183.08$1,144
May 2018029265.382.90$847
Apr 2018331763.842.90$1,111
Mar 2018136461.222.79$1,076
Feb 2018040361.782.77$1,115
Jan 2018039362.874.01$1,576
Dec 2017041857.272.92$1,221
Nov 2017028155.423.12$876
Oct 2017032049.292.98$955
Sep 2017033047.523.09$1,019
Aug 2017039245.373.00$1,178
Jul 2017037943.873.09$1,170
Jun 2017533142.493.09$1,234
May 2017641145.373.26$1,613
Apr 2017042447.933.21$1,362
Mar 20171240946.772.98$1,782
Feb 2017734850.452.95$1,381
Jan 2017637549.413.42$1,579
Dec 2016735348.763.72$1,655
Nov 2016641642.492.64$1,355
Oct 2016638446.193.09$1,464
Sep 2016643941.553.10$1,610
Aug 2016059441.442.92$1,737
Jul 2016042041.622.92$1,228
Jun 2016649545.352.69$1,602
May 2016053542.521.99$1,065
Apr 2016653736.561.99$1,289
Mar 2016647333.011.79$1,047
Feb 2016647126.472.06$1,131
Jan 2016649627.352.36$1,337
Dec 2015645232.362.00$1,099
Nov 2015654238.792.17$1,407
Oct 20151052343.552.43$1,705
Sep 2015078742.992.76$2,171
Aug 2015897240.162.87$3,113
Jul 201501,00648.152.95$2,963
Jun 201571,16256.152.88$3,743
May 2015389855.212.96$2,820
Apr 2015557849.822.71$1,814
Mar 2015678142.892.93$2,549
Feb 2015569844.662.98$2,301
Jan 2015648843.433.10$1,774
Dec 2014643054.693.59$1,872
Nov 2014648970.464.25$2,502
Oct 2014053578.303.90$2,087
Sep 2014651386.164.05$2,592
Aug 2014056589.394.04$2,280
Jul 2014555296.564.18$2,790
Jun 2014060898.164.74$2,880
May 2014011394.734.73$534
Apr 2014251495.944.81$2,664
Mar 2014656295.895.06$3,417
Feb 2014646697.406.19$3,470
Jan 2014660590.404.86$3,483
Dec 2013652891.824.35$2,850
Nov 2013559688.853.74$2,672
Oct 2013064997.423.78$2,453
Sep 20135598104.113.72$2,744
Aug 20130762104.253.52$2,684
Jul 20135593102.523.72$2,717
Jun 2013056694.403.93$2,226
May 2013566494.834.15$3,229
Apr 2013559993.964.28$3,035
Mar 2013563093.623.91$2,933
Feb 2013647091.233.42$2,155
Jan 2013559891.603.42$2,503
Dec 2012558686.773.42$2,438
Nov 2012575286.953.62$3,161
Oct 2012656389.383.40$2,450
Sep 2012055794.672.92$1,626
Aug 2012647492.662.91$1,934
Jul 2012090485.133.02$2,731
Jun 2012564979.822.52$2,034
May 201201,26491.612.49$3,145
Apr 20124628101.652.00$1,661
Mar 20123674105.052.22$1,813
Feb 20123774101.102.57$2,293
Jan 2012684698.092.73$2,902
Dec 2011372096.873.24$2,623
Nov 2011365395.723.31$2,449
Oct 2011371484.983.65$2,860
Sep 2011059283.623.99$2,360
Aug 2011469583.404.15$3,217
Jul 2011069894.144.52$3,153
Jun 2011484292.904.64$4,278
May 2011087998.134.40$3,872
Apr 20115784105.964.33$3,927
Mar 2011568396.364.06$3,253
Feb 2011467685.644.18$3,168
Jan 2011470886.504.59$3,595
Dec 2010574585.734.35$3,668
Nov 2010569880.843.80$3,053
Oct 2010581178.103.51$3,236
Sep 201031,03372.633.98$4,329
Aug 2010089073.684.42$3,933
Jul 2010298472.554.74$4,806
Jun 2010082370.364.91$4,041
May 201061,00171.124.24$4,666
Apr 2010277981.694.12$3,375
Mar 2010094078.394.39$4,125
Feb 2010087473.585.44$4,757
Jan 2010095774.365.96$5,708
Dec 2009089271.445.48$4,892
Nov 2009092374.593.75$3,463
Oct 200941,04972.544.11$4,602
Sep 200931,03265.543.06$3,359
Aug 200941,06267.423.22$3,688
Jul 200901,06161.133.46$3,676
Jun 2009494966.163.90$3,961
May 200941,17854.743.93$4,843
Apr 200941,01046.773.59$3,810
Mar 200941,14942.144.06$4,832
Feb 200991,08832.814.63$5,336
Jan 200941,27135.865.37$6,970
Dec 200891,13437.105.98$7,112
Nov 200881,07755.496.86$7,833
Oct 2008121,18175.246.92$9,078
Sep 200841,174101.767.88$9,655
Aug 200841,264114.228.48$11,179
Jul 200841,223131.0811.39$14,454
Jun 200841,363131.3313.03$18,289
May 200891,387123.1711.57$17,162
Apr 200891,356110.3110.45$15,170
Mar 200891,408101.909.66$14,524
Feb 2008141,27692.538.77$12,487
Jan 2008141,57290.388.21$14,165
Dec 200741,43688.337.30$10,839
Nov 2007141,45391.677.29$11,878
Oct 200751,56382.856.92$11,233
Sep 2007101,65375.846.24$11,080
Aug 2007101,63369.066.39$11,122
Jul 2007101,75470.906.39$11,913
Jun 2007141,61162.007.55$13,029
May 200751,76358.747.85$14,127
Apr 2007111,80559.617.81$14,744
Mar 2007111,85856.927.30$14,193
Feb 2007111,87755.108.22$16,028
Jan 2007161,85250.306.73$13,263
Dec 2006161,92856.656.92$14,245
Nov 2006112,14354.207.62$16,920
Oct 2006112,11754.906.01$13,335
Sep 2006102,03360.085.04$10,841
Aug 200602,02368.717.34$14,849
Jul 2006101,98669.376.34$13,290
Jun 2006111,97066.286.38$13,305
May 200652,40566.016.42$15,782
Apr 2006162,27464.397.36$17,768
Mar 2006112,30656.707.08$16,957
Feb 2006172,29757.597.75$18,783
Jan 2006132,73160.598.93$25,185
Dec 2005142,41954.9413.42$33,221
Nov 2005212,69754.6910.59$29,705
Oct 2005152,82258.3413.80$39,807
Sep 2005142,83661.4512.08$35,116
Aug 2005143,11361.519.80$31,359
Jul 2005153,41655.697.84$27,629
Jun 2005153,41452.337.38$25,984
May 2005243,71145.226.65$25,768
Apr 2005163,95349.207.36$29,883
Mar 2005213,52050.377.15$26,243

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                    2 Mcf  × $  2.87 =         $6

────────────────────────────────────────────────────
Month total                                       $6

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/210131 is the state's own key, not one this site invented.