CUSENBARY 36

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 210186District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$370 k
Oct 2004 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
260
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-11-18160015
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition45 bbl$2,480
GasProduction56,921 Mcf$367,984
Total$370,465

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3396, -100.5571. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.33965, -100.55714 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,531 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,531 ft.

Completions filed
Oct 2004
1 of 1 wells

1 well

42-4353703025,531 ftOct 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (260)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

260 months

May 2026040106.413.05$122
Apr 202604098.932.87$115
Mar 202603689.753.15$113
Feb 202603563.503.75$131
Jan 202603559.138.00$280
Dec 202503856.664.41$168
Nov 202503858.593.93$149
Oct 202504059.383.30$132
Sep 202504062.743.08$123
Aug 202504263.933.01$127
Jul 202503066.743.32$99
Jun 20250466.483.13$13
May 202504460.553.23$142
Apr 202503762.363.54$131
Mar 202504167.704.27$175
Feb 202504270.884.34$182
Jan 202504674.324.28$197
Dec 202404868.993.12$150
Nov 202404769.052.20$103
Oct 202404771.372.28$107
Sep 202404769.612.36$111
Aug 202404775.632.06$97
Jul 202404579.932.15$97
Jun 202404478.082.63$116
May 202404678.812.20$101
Apr 202404284.451.66$70
Mar 202404180.301.55$63
Feb 202404176.091.78$73
Jan 202404273.023.30$139
Dec 202304571.262.61$117
Nov 202304277.892.81$118
Oct 202304185.443.09$127
Sep 202304189.042.74$112
Aug 202304080.522.67$107
Jul 202304274.852.64$111
Jun 202304068.962.26$90
May 202301670.622.23$36
Apr 20230078.122.24$0
Mar 20230772.852.39$17
Feb 20230675.112.47$15
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220384.888.16$24
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202201104.226.84$7
Mar 202201108.885.08$5
Feb 20220091.054.86$0
Jan 20220181.844.54$5
Dec 202101971.323.90$74
Nov 202104577.435.24$236
Oct 202104879.795.71$274
Sep 202104869.865.35$257
Aug 202104466.024.22$186
Jul 202104170.783.98$163
Jun 202101669.493.38$54
May 202101563.483.02$45
Apr 202101660.362.76$44
Mar 202101061.302.72$27
Feb 20210157.805.55$6
Jan 20210750.412.81$20
Dec 20200544.642.68$13
Nov 20200138.772.71$3
Oct 20200036.972.48$0
Sep 20200237.091.99$4
Aug 20200539.982.39$12
Jul 202001138.371.83$20
Jun 202002734.901.69$46
May 202002716.921.81$49
Apr 202002314.751.80$42
Mar 202002430.341.86$45
Feb 202001749.881.98$34
Jan 202001457.252.09$29
Dec 201901359.012.30$30
Nov 201901055.302.75$28
Oct 20190253.472.42$5
Sep 20190455.052.66$11
Aug 20190553.112.30$12
Jul 20190556.272.46$12
Jun 20190552.782.49$12
May 20190858.482.74$22
Apr 20191762.632.75$82
Mar 20190556.803.06$15
Feb 20190450.852.79$11
Jan 20190246.033.23$6
Dec 20180246.594.19$8
Nov 20180552.934.24$21
Oct 20180661.443.40$20
Sep 20180259.543.11$6
Aug 20180459.403.07$12
Jul 20180465.142.93$12
Jun 20180660.183.08$18
May 201801265.382.90$35
Apr 201801363.842.90$38
Mar 201803361.222.79$92
Feb 201803361.782.77$91
Jan 201802762.874.01$108
Dec 201703357.272.92$96
Nov 201701155.423.12$34
Oct 201701049.292.98$30
Sep 201701947.523.09$59
Aug 201702745.373.00$81
Jul 201703643.873.09$111
Jun 201702342.493.09$71
May 201702945.373.26$95
Apr 201702047.933.21$64
Mar 201702146.772.98$63
Feb 201702450.452.95$71
Jan 201702849.413.42$96
Dec 201603548.763.72$130
Nov 201603842.492.64$100
Oct 201603246.193.09$99
Sep 201603041.553.10$93
Aug 201602941.442.92$85
Jul 201602341.622.92$67
Jun 201604845.352.69$129
May 201606742.521.99$133
Apr 201607236.561.99$143
Mar 201607233.011.79$129
Feb 201606526.472.06$134
Jan 201607227.352.36$170
Dec 201507732.362.00$154
Nov 201507338.792.17$158
Oct 201507243.552.43$175
Sep 201506942.992.76$190
Aug 201507040.162.87$201
Jul 201509648.152.95$283
Jun 201502556.152.88$72
May 201506955.212.96$204
Apr 201506249.822.71$168
Mar 201506842.892.93$200
Feb 201506544.662.98$193
Jan 201507143.433.10$220
Dec 201407254.693.59$259
Nov 201406670.464.25$281
Oct 201406778.303.90$261
Sep 201406286.164.05$251
Aug 201406289.394.04$250
Jul 201405896.564.18$242
Jun 201406498.164.74$303
May 201407294.734.73$340
Apr 201407995.944.81$380
Mar 201408295.895.06$415
Feb 201409097.406.19$557
Jan 201409790.404.86$471
Dec 201309891.824.35$427
Nov 201309788.853.74$363
Oct 201309797.423.78$367
Sep 2013090104.113.72$335
Aug 2013079104.253.52$278
Jul 2013041102.523.72$152
Jun 201304894.403.93$189
May 201306094.834.15$249
Apr 201309293.964.28$394
Mar 2013010793.623.91$419
Feb 201309291.233.42$315
Jan 2013010991.603.42$373
Dec 2012011386.773.42$386
Nov 2012012386.953.62$446
Oct 2012014389.383.40$486
Sep 2012020894.672.92$607
Aug 2012017692.662.91$512
Jul 201207385.133.02$221
Jun 201207679.822.52$191
May 201208491.612.49$209
Apr 2012094101.652.00$188
Mar 2012082105.052.22$182
Feb 2012033101.102.57$85
Jan 201201998.092.73$52
Dec 201103696.873.24$117
Nov 2011010595.723.31$348
Oct 2011014484.983.65$525
Sep 201104583.623.99$179
Aug 2011018983.404.15$784
Jul 2011028594.144.52$1,287
Jun 201104492.904.64$204
May 201104598.134.40$198
Apr 2011028105.964.33$121
Mar 201102896.364.06$114
Feb 201101085.644.18$42
Jan 201103186.504.59$142
Dec 201003285.734.35$139
Nov 201009680.843.80$364
Oct 2010027078.103.51$947
Sep 2010031972.633.98$1,269
Aug 2010011673.684.42$513
Jul 2010034372.554.74$1,625
Jun 2010066970.364.91$3,285
May 201004671.124.24$195
Apr 2010010081.694.12$412
Mar 201008378.394.39$364
Feb 201008973.585.44$484
Jan 201009674.365.96$573
Dec 200929471.445.48$658
Nov 20090074.593.75$0
Oct 20090172.544.11$4
Sep 2009023765.543.06$726
Aug 2009029167.423.22$937
Jul 2009030361.133.46$1,050
Jun 2009027966.163.90$1,087
May 2009024054.743.93$942
Apr 2009021246.773.59$761
Mar 2009036342.144.06$1,473
Feb 2009228132.814.63$1,367
Jan 2009036635.865.37$1,966
Dec 2008026737.105.98$1,596
Nov 2008049255.496.86$3,375
Oct 2008027675.246.92$1,910
Sep 20080470101.767.88$3,702
Aug 20080308114.228.48$2,613
Jul 20080300131.0811.39$3,417
Jun 20080376131.3313.03$4,900
May 20080522123.1711.57$6,042
Apr 20082536110.3110.45$5,824
Mar 20080702101.909.66$6,784
Feb 2008046692.538.77$4,087
Jan 2008043790.388.21$3,586
Dec 2007038988.337.30$2,840
Nov 2007044591.677.29$3,245
Oct 2007045882.856.92$3,170
Sep 2007228975.846.24$1,956
Aug 2007035869.066.39$2,287
Jul 2007038670.906.39$2,466
Jun 2007218562.007.55$1,520
May 2007030158.747.85$2,362
Apr 2007017159.617.81$1,335
Mar 2007020856.927.30$1,519
Feb 2007023355.108.22$1,914
Jan 2007037050.306.73$2,489
Dec 2006034456.656.92$2,380
Nov 2006241154.207.62$3,239
Oct 2006044054.906.01$2,646
Sep 2006250260.085.04$2,649
Aug 2006065268.717.34$4,786
Jul 2006065769.376.34$4,167
Jun 2006029466.286.38$1,877
May 2006238766.016.42$2,619
Apr 2006042664.397.36$3,136
Mar 2006148556.707.08$3,492
Feb 2006021557.597.75$1,666
Jan 2006227260.598.93$2,551
Dec 200508254.9413.42$1,100
Nov 2005053254.6910.59$5,633
Oct 2005380258.3413.80$11,239
Sep 2005043361.4512.08$5,230
Aug 2005065961.519.80$6,456
Jul 2005049955.697.84$3,914
Jun 2005050352.337.38$3,713
May 2005598245.226.65$6,758
Apr 200501,27349.207.36$9,370
Mar 200502,05450.377.15$14,696
Feb 2005162,49045.226.31$16,440
Jan 200503,34143.166.32$21,122
Dec 200403,51639.866.75$23,737
Nov 200404,88645.286.33$30,930
Oct 200417,96349.706.52$51,929

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   40 Mcf  × $  3.05 =       $122

────────────────────────────────────────────────────
Month total                                     $122

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/210186 is the state's own key, not one this site invented.