DURHAM

Operated by QUAIL RIDGE PETROLEUM LLC (P-5 100292) in the BLOODWORTH, NE. (5750 CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 210281District 7CField 09630400CondensateGasSaveExport
Value, all time
$301 k
May 2005 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
253
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 11 leases and 45 wells, and the rule below applies to all of them.

Discovered
1967-02-16
as the register files it
Field class
Oil and gas
the register's own label
Between wells
500 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1986-08-01.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 10/01/96.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,247 bbl$161,352
GasProduction29,656 Mcf$139,310
Total$300,662

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0505, -100.6291. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.05053, -100.62907 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,240 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,240 ft.

Completions filed
Mar 1979
1 of 1 wells

1 well

42-0813000826,240 ftMar 1979

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (253)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

253 months

May 202600106.413.05$0
Apr 202605898.932.87$166
Mar 202601389.753.15$41
Feb 202604763.503.75$176
Jan 202601559.138.00$120
Dec 202502356.664.41$102
Nov 202501858.593.93$71
Oct 202549959.383.30$2,939
Sep 202504262.743.08$129
Aug 202502563.933.01$75
Jul 202502266.743.32$73
Jun 202502866.483.13$88
May 202504860.553.23$155
Apr 202501762.363.54$60
Mar 202508567.704.27$363
Feb 202508170.884.34$352
Jan 202506774.324.28$287
Dec 2024899168.993.12$6,424
Nov 202409369.052.20$204
Oct 202409171.372.28$208
Sep 202408269.612.36$194
Aug 202409175.632.06$188
Jul 2024010179.932.15$217
Jun 202409478.082.63$248
May 202408578.812.20$187
Apr 202408184.451.66$134
Mar 2024946980.301.55$7,655
Feb 202408276.091.78$146
Jan 202407273.023.30$237
Dec 202309171.262.61$238
Nov 202303877.892.81$107
Oct 20230085.443.09$0
Sep 202308889.042.74$241
Aug 202309580.522.67$254
Jul 2023011474.852.64$301
Jun 2023010068.962.26$226
May 2023011570.622.23$256
Apr 2023011178.122.24$248
Mar 2023012272.852.39$292
Feb 2023010375.112.47$254
Jan 2023011276.533.39$379
Dec 202214912776.415.73$12,113
Nov 2022012285.005.65$689
Oct 2022012287.185.86$715
Sep 2022010284.888.16$833
Aug 2022012894.529.13$1,168
Jul 20220110101.587.54$830
Jun 20220121115.097.98$965
May 2022056109.378.43$472
Apr 20224115104.226.84$1,203
Mar 2022095108.885.08$482
Feb 202207991.054.86$384
Jan 20220081.844.54$0
Dec 20210871.323.90$31
Nov 202103277.435.24$168
Oct 202104179.795.71$234
Sep 202105169.865.35$273
Aug 202105666.024.22$236
Jul 202107570.783.98$299
Jun 202101469.493.38$47
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 202104161.302.72$111
Feb 202107357.805.55$405
Jan 202103150.412.81$87
Dec 202005044.642.68$134
Nov 202004138.772.71$111
Oct 20205811736.972.48$2,434
Sep 2020012637.091.99$251
Aug 2020013339.982.39$317
Jul 2020013638.371.83$248
Jun 202017714434.901.69$6,421
May 2020014216.921.81$258
Apr 2020017414.751.80$314
Mar 202004730.341.86$87
Feb 202005149.881.98$101
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 2018010946.594.19$456
Nov 2018012652.934.24$534
Oct 201809961.443.40$336
Sep 201801359.543.11$40
Aug 2018012759.403.07$389
Jul 2018012665.142.93$369
Jun 2018012660.183.08$388
May 2018013165.382.90$380
Apr 2018012063.842.90$348
Mar 2018012361.222.79$343
Feb 2018011361.782.77$313
Jan 2018012762.874.01$509
Dec 201709657.272.92$280
Nov 2017010655.423.12$331
Oct 2017010249.292.98$304
Sep 201709847.523.09$303
Aug 201709545.373.00$285
Jul 201709843.873.09$303
Jun 2017524442.493.09$2,345
May 2017883745.373.26$4,113
Apr 201704247.933.21$135
Mar 201703946.772.98$116
Feb 201703250.452.95$94
Jan 201703349.413.42$113
Dec 201603448.763.72$127
Nov 201602842.492.64$74
Oct 201603046.193.09$93
Sep 201602941.553.10$90
Aug 201603141.442.92$91
Jul 201602641.622.92$76
Jun 201605045.352.69$134
May 201608242.521.99$163
Apr 2016013736.561.99$273
Mar 2016014533.011.79$260
Feb 2016013626.472.06$281
Jan 2016014927.352.36$352
Dec 2015014232.362.00$284
Nov 2015013438.792.17$290
Oct 201517914543.552.43$8,147
Sep 2015014342.992.76$394
Aug 2015014940.162.87$428
Jul 2015014648.152.95$430
Jun 2015014256.152.88$409
May 2015015155.212.96$446
Apr 2015013649.822.71$368
Mar 2015013742.892.93$402
Feb 2015013844.662.98$411
Jan 2015014943.433.10$462
Dec 2014014354.693.59$514
Nov 2014014970.464.25$634
Oct 2014014378.303.90$558
Sep 2014013086.164.05$526
Aug 2014014989.394.04$601
Jul 201418115796.564.18$18,134
Jun 2014015698.164.74$739
May 2014016494.734.73$775
Apr 2014016295.944.81$779
Mar 2014017895.895.06$900
Feb 2014016797.406.19$1,034
Jan 2014021990.404.86$1,065
Dec 201302891.824.35$122
Nov 2013017388.853.74$647
Oct 2013017097.423.78$642
Sep 20130165104.113.72$613
Aug 20130175104.253.52$616
Jul 20130179102.523.72$665
Jun 2013017194.403.93$673
May 2013017494.834.15$722
Apr 2013016193.964.28$690
Mar 2013016893.623.91$657
Feb 201318215991.233.42$17,148
Jan 2013017591.603.42$598
Dec 2012017886.773.42$609
Nov 2012017486.953.62$631
Oct 2012018389.383.40$622
Sep 2012017394.672.92$505
Aug 2012018392.662.91$532
Jul 2012018485.133.02$556
Jun 2012017879.822.52$448
May 2012016691.612.49$413
Apr 20120183101.652.00$365
Mar 20120188105.052.22$418
Feb 20120176101.102.57$452
Jan 2012017598.092.73$478
Dec 2011018896.873.24$609
Nov 2011018295.723.31$603
Oct 2011019184.983.65$697
Sep 2011018583.623.99$737
Aug 201118019583.404.15$15,821
Jul 2011019594.144.52$881
Jun 2011018992.904.64$877
May 2011018698.134.40$819
Apr 20110177105.964.33$767
Mar 2011018296.364.06$738
Feb 2011016185.644.18$673
Jan 2011018086.504.59$826
Dec 2010017885.734.35$774
Nov 2010017680.843.80$668
Oct 2010018578.103.51$649
Sep 2010018272.633.98$724
Aug 2010015173.684.42$667
Jul 2010013372.554.74$630
Jun 2010018070.364.91$884
May 201010019971.124.24$7,955
Apr 2010020081.694.12$825
Mar 2010020478.394.39$895
Feb 2010018173.585.44$985
Jan 2010019874.365.96$1,181
Dec 2009019871.445.48$1,086
Nov 2009019474.593.75$728
Oct 200918319772.544.11$14,085
Sep 2009017765.543.06$542
Aug 2009018967.423.22$608
Jul 2009020161.133.46$696
Jun 2009020266.163.90$787
May 2009020254.743.93$793
Apr 2009019546.773.59$700
Mar 2009020142.144.06$816
Feb 2009017932.814.63$829
Jan 2009020135.865.37$1,080
Dec 2008020037.105.98$1,195
Nov 2008021955.496.86$1,502
Oct 2008019975.246.92$1,377
Sep 20080186101.767.88$1,465
Aug 2008176212114.228.48$21,901
Jul 20080208131.0811.39$2,369
Jun 20080173131.3313.03$2,255
May 2008094123.1711.57$1,088
Apr 20080153110.3110.45$1,600
Mar 20080142101.909.66$1,372
Feb 2008013292.538.77$1,158
Jan 2008013690.388.21$1,116
Dec 2007013988.337.30$1,015
Nov 200709991.677.29$722
Oct 2007010282.856.92$706
Sep 2007010375.846.24$643
Aug 2007012469.066.39$792
Jul 200717413070.906.39$13,167
Jun 2007011262.007.55$845
May 2007011058.747.85$863
Apr 2007010959.617.81$851
Mar 2007011656.927.30$847
Feb 2007010555.108.22$863
Jan 2007011850.306.73$794
Dec 2006012756.656.92$879
Nov 2006011754.207.62$891
Oct 2006012354.906.01$740
Sep 2006028760.085.04$1,446
Aug 2006018068.717.34$1,321
Jul 2006018269.376.34$1,154
Jun 2006016166.286.38$1,028
May 200613218166.016.42$9,876
Apr 2006017064.397.36$1,251
Mar 2006018956.707.08$1,339
Feb 2006016357.597.75$1,263
Jan 2006017960.598.93$1,599
Dec 2005018454.9413.42$2,468
Nov 2005017654.6910.59$1,864
Oct 2005019258.3413.80$2,649
Sep 2005014961.4512.08$1,800
Aug 2005019261.519.80$1,881
Jul 2005019655.697.84$1,537
Jun 2005018752.337.38$1,380
May 20050045.226.65$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   58 Mcf  × $  2.87 =       $166

────────────────────────────────────────────────────
Month total                                     $166

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/210281 is the state's own key, not one this site invented.